Methods of Estimation :

10/13/2018 Department of Civil Engineering 2


CE 3033 - Quantity Surveying & Estimation

Assignment # 2
Q. Calculate the following items as per layout plan shown in figure 1 and prepare proper
measurement sheet for each of them accordingly
a) Excavation
b) Brickwork
c) Plinth Beam (Concrete and Steel)
Use any method either Separate wall method or Centre line method. However, mention the
method being adopted. Draw appropriate layout plan for each of the item mentioned above
as per sectional details provided in figure 2.

Figure 2 : Sectional Details


Figure 1 : Layout Plan

10/13/2018 Department of Civil Engineering 3


10/13/2018 Department of Civil Engineering 4