Methods of Estimation :
• Main Items of an Estimate for a typical residential building
Typical Section
Excavation Plan
10/01/2018
Methods of Estimation:
10/01/2018
Estimation- Excavation:
• Steps
10/01/2018
Estimation- Develop excavation plan:
9 in = 0.75 ft
9/12 = 0.75
1 ft = 12 in Centre
Line ,CL
10/01/2018
Estimation- Develop excavation plan:
30.25’
0.75’
16.50’ x 12.0’
16.50’ x 10.0’
18’
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
10.75’
17.25’
10/01/2018
24”=2’
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
24”=2’
10.75’
17.25’
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
24”=2’ 24”=2’
10.75’
17.25’
10/01/2018
Long Wall, L1 = 19.25’
S1 = 4.0’
S1 = 4.0’
S1 = 4.0’
6.0’
Short
Short
Short
Wall,
Wall,
Wall,
8.25’ 9.0’
Long Wall, L1 = 17.25+2 = 19.25
S2 = 10.75’
S2 = 10.75’
Short Wall,
Short Wall,
12.75’
29.50’
Short Wall, S2 = 12.75-2 = 10.75
24”=2’
Short Wall,
Short Wall,
S3 = 8.75’
S3 = 8.75’
10.75’ Short Wall, S3 = 10.75-2 = 8.75
12.75’ 29.50’
24”=2’
10.75’
10/01/2018
3’
24” = 2’
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
01 Excavation
Long Wall
Short Wall
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
01 Excavation
Total Quantity of
cft 804.00
Excavation
10/01/2018
10/01/2018
Methods of Estimation :
• Main Items of an Estimate for a typical residential building
– Excavation
– Plain Cement Concrete
– Brick Work (Substructure)
– Plinth Beam
10/01/2018
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
10.75’
17.25’
10/01/2018
24”=2’
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
24” = 2’
10.75’
17.25’
10/01/2018
6.0’
8.25’ 9.0’
12.75’ 29.50’
24”=2’ 24”=2’
10.75’
17.25’
10/01/2018
Long Wall, L1 = 19.25’
S1 = 4.0’
S1 = 4.0’
S1 = 4.0’
6.0’
Short
Short
Short
Wall,
Wall,
Wall,
8.25’ 9.0’
Long Wall, L1 = 17.25+2 = 19.25
S2 = 10.75’
S2 = 10.75’
Short Wall,
Short Wall,
12.75’
29.50’
Short Wall, S2 = 12.75-2 = 10.75
24”=2’
Short Wall,
Short Wall,
S3 = 8.75’
S3 = 8.75’
10.75’ Short Wall, S3 = 10.75-2 = 8.75
12.75’ 29.50’
24”=2’
10.75’
10/01/2018
Estimation- Develop excavation plan:
9 in = 0.75 ft
9/12 = 0.75
1 ft = 12 in Centre
Line ,CL
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
Long Wall
Short Wall
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
10/01/2018
10/01/2018
Long Wall, L1 = 18.75’
S1 = 4.5’
S1 = 4.5’
S1 =4.5’
6.0’
Short
Short
Short
Wall,
Wall,
Wall,
8.25’ 9.0’
Long Wall, L1 = 17.25+1.5 = 18.75
S2 = 11.25’
S2 = 11.25’
Short Wall,
Short Wall,
12.75’
29.50’
Short Wall, S2 = 12.75-1.5 = 11.25
18”=1.5’
Short Wall,
Short Wall,
S3 = 9.25’
S3 = 9.25’
10.75’ Short Wall, S3 = 10.75-1.5 = 9.25
12.75’ 29.50’
18”=1.5’
10.75’
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
Long Wall
Short Wall
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
10/01/2018
10/01/2018
Long Wall, L1 = 18.38’
S1 =4.87’
S1 = 4.87
S1 = 4.87
6.0’
Short
Short
Short
Wall,
Wall,
Wall,
8.25’ 9.0’
Long Wall, L1 = 17.25+1.13 = 18.38
S2 = 11.62’
S2 = 11.62’
Short Wall,
Short Wall,
12.75’
29.50’
Short Wall, S2 = 12.75-1.13 = 11.62
Short Wall,
S3 = 9.62’
S3 = 9.62’
13-1/2”=1.13’ 10.75’ Short Wall, S3 = 10.75-1.13 = 9.62
12.75’ 29.50’
13-1/2”=1.13’
10.75’
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
Short Wall
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
10/01/2018
10/01/2018
Long Wall, L1 = 18.00’
S1 =5.25’
S1 = 5.25
S1 = 5.25
6.0’
Short
Short
Short
Wall,
Wall,
Wall,
8.25’ 9.0’
Long Wall, L1 = 17.25+0.75 = 18
Short Wall,
Short Wall,
S2 = 12’
S2 = 12’
12.75’
29.50’
Short Wall, S2 = 12.75-0.75 = 12
Short Wall,
S3 = 10’
S3 = 10’
9”= 0.75’ 10.75’ Short Wall, S3 = 10.75-0.75 = 10
12.75’ 29.50’
9”=0.75’
10.75’
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
Long Wall
L1 cft 4 18 0.75 1 54
Short Wall
S3 cft 2 10 0.75 1 15
10/01/2018
Methods of Estimation- Measurement Sheet:
Item Description of Item Unit No. Length Breadth Height/ Total
No. Depth Quantity Remarks
10/01/2018
10/01/2018