MSIS BIS 688 WEEKLY JOURNAL

NAME: Snehasree Gorrepati MONTH: June YEAR: 2021


F
MO TUE WE THUR RI
N: 28 S: 29 D: 30 S: 01 : 02
Exercise 51: Create Exercise 56: Create Exercise 61: Create Vendor Exercise 66: Display Vendors Exercise 71: Create Work
Production Scheduler Confirmation Parameters Invoice (Gross) Document
SUBJECT 1

Master Records Centrally Center Location


In this case we will assign it to In this exercise, will define This exercise demonstrates This exercise will assist to find This will register the physical
an individual who will be whether the system proposes creating both purchasing and a document number from the locations for the work centers
responsible for the a partial confirmation, a final accounting specific vendor previous exercise’s recording to be assigned. This work
production of the finished confirmation or a final partner data at once. the invoice document center will be assigned to the
Exercise 52: Control Exercise 57: Define Valuation Exercise 62: Create Purchase Exercise 67: Post Payment to Exercise 72: Review Work
Parameters for Material for Goods Received Order Vendors
SUBJECT 2

Center Control Keys


Requirements Planning (MRP) This exercise will have to Create a purchase order for If the receipt of the goods, Control keys determine what
The Control parameters for define which valuation initial supply of raw material the vendors invoice and the set of control parameters will
MRP define how the MRP variant will be used for goods used in production. The purchase order are within be conducted at a work
planning system will run. received from production. In quantities purchased are in tolerance the vendor will be center. This will be linked to
Exercise 53: Assign Exercise 58: Create Material Exercise 63: Create Goods Exercise 68: Create Semi Exercise 73: Create Capacity
SUBJECT 3

Availability Check to Order Master for Raw Materials Receipt finished Goods Bill of Material Capacity is the ability to
Type The purpose of this exercise is Receive the raw material into This exercise will have you perform a specific task, such
Specify what stock situations to create the raw materials inventory. This is the second create a Bill of Material as labor or machines. We can
are to be considered as necessary to produce the part of the 3 way match (BOM). The BOM is a list of define individual capacities
“available”. new pens. Each specific view process – quantities against components needed to for each capacity, for instance
Exercise 54: Define Exercise 59: Create Material Exercise 64: Maintain Exercise 69: Create Bill of Exercise 74: Create Activity
Automatic Account Type Labor (Labor Hours)
SUBJECT 4

Scheduling Parameters for Master for Semi finished Material for a Finished Good
Operations Products Assignments This exercise will have to Activity type: is a unit of
In this step you define for This exercise will have you In this exercise the system create a Bill of Material measure for allocating
each plant, order type and create your semi-finished settings for controlling (BOM). The BOM is a list of internal activities according to
production scheduler the products. Each specific view automatic postings to G/L components needed to usage. The activity type is
Exercise 55: Define Control Exercise 60: Create Material Exercise 65: Post Invoice Exercise 70: Create Person Exercise 75: Set Activity
Receipt from Vendor Prices
SUBJECT 5

Parameters for Order Type Master for Finished Products Responsible for Work Center
In this exercise, will define In this exercise will have to The vendor will send a bill – Each work center must have These costs define the
the parameters that are valid create your finished products. invoice. In this exercise the someone designated as the planned operating costs for
for each order type and plant. Each specific view contains invoice for the raw materials responsible party. Without production. In addition, we
relevant data. from the vendor is entered the HR module, “people” do can define the planned
Menu Path: Tools →
Follow the above path and Follow the above path and Follow the above path and Follow the above path and Follow the above path and
maintain entries for 100 users maintain entries for 100 users maintain entries for 100 users maintain entries for 100 users maintain entries for 100 users
NOTES

as per the manual using UFT as per the manual using UFT as per the manual using UFT as per the manual using UFT as per the manual using UFT
scripting. scripting. scripting. scripting. scripting.