AUVA UPGRADE ELECTRICAL SYSTEMS AT ABQAIQ PLANTS Document No: AUVA-MS-Civil-000
DATAILED LIST OF CIVIL WORKS METHOD STATEMENTS &
SUBMISSION DATES
00 11-04-2018 Issued for Review QA/QC Manager
Rev Date Description Prepared By
Document No: AUVA-MS-Civil-000
Upgrade Electrical Systems At Abqaia Plants/6600041340
DATAILED LIST OF CIVIL WORKS METHOD STATEMENTS & SUBMISSION DATES
S/No Description of Method Statement Document Tentative Date
Number of Submission 1) METHOD OF STATEMENT FOR FIELD CHANGE CONTROL AUVA-MS-Civil- 12-11-2018 SA-001 2) METHOD OF STATEMENT FOR ASPHLAT WORK AUVA-MS-Civil- 12-11-2018 DEMOLIATION SA-002 3) METHOD OF STATEMENT FOR EXCAVATION AND AUVA-MS-Civil- 12-11-2018 BACKFILLING SA-003 4) METHOD OF STATEMENT FOR LEAN CONCRETE AUVA-MS-Civil- 12-11-2018 SA-004 5) METHOD STATEMENT FOR INSTALLATION OF FORMWORK AUVA-MS-Civil- SA-005 6) METHOD OF STATEMENT FOR REBAR INSTALLATION AUVA-MS-Civil- SA-006 7) METHOD OF STATEMENT FOR STRUCTURAL CONCRETE AUVA-MS-Civil- FOUNDATION FOR THE PLANT BUILDING SA-007 8) METHOD OF STATEMENT FOR THE R.C CONCRETE FOR AUVA-MS-Civil- THE GARDE SLAB SA-008 9) METHOD OF STATEMENT FOR THE TANSFORMER PAD AUVA-MS-Civil- FOOTING INSTALLATON SA-009 10) METHOD OF STATEMNT FOR PACKAGE UNIT AUVA-MS-Civil- FOUNDATION SA-010 11) METHOD OF STATEMENT FOR THEB CAST IN SITU SEWAGE AUVA-MS-Civil- MANHOLE SA-011 12) METHOD OF STATEMENT FOR AIR INTAKE FOUNDATION AUVA-MS-Civil- SA-012 13) METHOD OF STATEMENT FOR THE CONCRETE REPAIR AUVA-MS-Civil- WORK SA-013 14) METHOD OF STATEMENT FOR DOUBLE ARM FENCE AUVA-MS-Civil- INSATLLATION SA-014 15) METHOD OF STATEMENT FOR ERECTION OF PRECAST AUVA-MS-Civil- WALL PANNEL (300MM,200MM) SA-015 16) METHOD OF STATEMENT FOR PLASTERING THE INTERNAL AUVA-MS-Civil- JOINTS SA-016 17) METHOD OF STATEMENT FOR NON SHRINK CEMENT AUVA-MS-Civil- BASED GROUTING SA-017 18) METHOD OF STATEMNT FOR THE ERECTION OF ROOF AUVA-MS-Civil- DOUBLE T SLAB INSTALLATION SA-018 19) METHOD OF STATEMENT FOR ROOF LEAK TEST AUVA-MS-Civil- SA-019
1|Page Upgrade Electrical Systems At Abqaia Plants/6600041340
DATAILED LIST OF CIVIL WORKS METHOD STATEMENTS & SUBMISSION DATES
20) METHOD OF STATEMNT FOR THE GYPSUM BOARD AUVA-MS-Civil-
ASSYMBLIES INSTALLATION SA-020 21) METHOD OF STATEMENT FOR THE DOORS INSTALLATION AUVA-MS-Civil- SA-021 22) METHOD OF STATEMENT FOR THE BETTRY ROOM TILE’S AUVA-MS-Civil- INSTALLATION SA-022 23) METHOD STATEMENT FOR LIGH SAND BLASTING AUVA-MS-Civil- SA-023 24) SEALENT METHOD STATEMENT. AUVA-MS-Civil- SA-024 25) METHOD OF STATEMENT OF CONDUIT AND DUCT BANK AUVA-MS-Civil- SA-025 26) METHOD STATEMENT FOR CONCRETE CORING AUVA-MS-Civil- SA-026 27) METHOD STATEMENT OF ROOF WATER PROOFING AUVA-MS-Civil- SA-027 28) METHOD OF STATEMENT FOR ROOF LEAK TEST AUVA-MS-Civil- SA-028 29) METHOD OF STATEMENT FOR ASPHALT PAVING AUVA-MS-Civil- SA-029