HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT

Material Approval Request for 75mm THK INSULATION BOARD,


EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00xx
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

MATERIAL APPROVAL REQUEST (M.A.R) FOR 75mm THK INSULATION BOARD,


EXPANDED POLYSTYRENE
9COM # 6000000520

CONTRACT NO.: 6600041164 (IK)


BI/JO NO.: 10-02145
CONSTRUCTION CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM)

Material Approval Request (M.A.R) For FOR 75mm THK INSULATION


BOARD, EXPANDED POLYSTYRENE
9 COM # 6000000520

A IFA 04-Nov-2021 Issued for Review

Technical Construction Construction


Designation
Discipline Engineer Manager

Rev. Status Date Revision Memo Issued By Checked By Approved by


(SAIPEM) (SAIPEM) (SAIPEM)
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00xx
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

Item No. Table of Contents Section


No.

1 GENAERAL INFORMATION 1

2 MATERIAL APPROVAL REQUEST FORM 2

3 PREQUALIFICATION DOCUMENT-HEET ESTABLISHMENT FOR INDUSTRIES 3

4 DRAWING 4
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00xx
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

SECTION 1

GENERAL INFORMATION
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00xx
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

1. GENERAL INFORMATION

1.1 PURPOSE OF THE DOCUMENT

The aim of this document is to request approval for 75mm THK INSULATION BOARD, EXPANDED
POLYSTYRENE as per the IFC Drawings.

- VENDORS:
1- SAPPCO (SAPTEX INSULATION PRODUCT FACTORY) V.ID # 10013820 , 9COM-6000000520

- MATERIAL: 9COM 6000000520

- PRODUCT LONG DESCRIPTION:


INSULATION; BUILDING;
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00XX
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

SECTION 2

MATERIAL APPROVAL REQUEST FORM


(MAR)
MATERIAL APPROVAL REQUEST
To: Mr. Contract No.: 6600041164 (IK) No. of Copies: SUBMITTAL CODE
Company Site Representative / Construction Manager B.I. No. BI - 10 - 02145 A ARCHITECTURAL

SAUDI ARABIAN OIL COMPANY Project Title HAWIYAH GAS PLANT (HGP) EXPANSION PROJECT C CIVIL
To Line
LOCATION: HAWIYAH, Saudi Arabia Item No.: S STRUCTURAL
REFERENCE SUBMITTAL No.
SD-SP-MAR-M00XX NEW SUBMITTAL M MECHANICAL
9 COM NUMBER
ATTN: Mr.
6000000520
Company Site Representative RE SUBMITTAL DIVISION NO.: E ELECTRICAL

INSPECTION LEVEL : 0 Yes No


ARAMCO APPROVAL REQUIRED SPECS. SECTION O OTHERS

IAP REQUIRED

ITEM
DESCRIPTION MANUFACTURER / VENDOR FOR SAUDI ARAMCO USE ONLY COMMENTS
NO.

75mm THK INSULATION BOARD, EXPANDED POLYSTYRENE ATTACHMENTS:


1 SAPPCO 1- GENERAL INFORMATION
(SAPTEX INSULATION PRODUCT FACTORY) 2-MATERIAL APPROVAL REQUEST FORM
VENDOR ID:10013820 3-PREQUALIFICATION DOCUMENT
4-DRAWING

REVIEWED BY: SUBMITTED BY: APPROVED BY:

NO OBJECTION
SPSA Quality Supervisor CONSTRUCTION CONTRACTOR Mr.
These document have been reviewed for general conformance NO OBJECTION AS NOTED
Sign: Sign: with the contract. Such review does not relieve the contractor Company Site Representative
of his responsibilities under the terms of the contractor
Date: Date: OBJECTION HAWIYAH GAS PLANT (HGP) EXPANSION PROJECT
authorized additional compensation.
Name and Signature of Snamprogetti Representative
Date:
Sign: CORRECT AND RE SUBMIT
Date:
Document No.: SPKF-001 rev 0
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00XX
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

SECTION 3
PRE QUALIFICATION DOCUMENTS
AND PRODUCT CATALOGUE
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
Blue Guard
HAWIYAH GAS PLAN (HGP) EXPANSION PROJECT
Material Approval Request for 75mm THK INSULATION
BOARD, EXPANDED POLYSTYRENE

CONTRACTOR: SNAMPROGETTI SAUDI ARABIA CO. LTD. (SAIPEM) JOB H02755 UNIT 00
CUSTOMER: SAUDI ARAMCO OIL COMPANY – SAUDI ARAMCO (IK) DOC NO. SD-SP-MAR-M00XX
PLANT LOCATION: HAWIYAH – SAUDI ARABIA REV. A

SECTION 4

REFERENCE DRAWING
SAUDIARAMCO.
NOTES:
C OF PIPE
L
00

1 - ALL DIMENSIONS ARE IN MILLIMETERS


UNLESS NOTED OTHERWISE.
SERVICE: OWS,FW,DW,UW,CSW & SWS
2 - THE POLYSTYRENE INSULATION BOARD
PIPES MAY BE INSTALLED WITHOUT ANY CONCRETE PROTECTION SLAB PROVDED THAT THE HEIGHT H IS GREATER THAN OR EQUAL TO THE FOLLOWING SHALL NOT BE REPLACED BY ANY OTHER
MATERIAL WITHOUT ENGINEER'S APPROVAL.

OF
MINIMUM VALUE (BASED ON DIFFERENT LOADING CONDITION). IN CASE THE MINIMUM VALUE IS NOT MET, FOLLOWING SOLUTIONS MAY BE PURSUED (DURING
3 - AS PER CONCRETE GENERAL NOTES THE MATERIAL
CONSTRUCTION PHASE):

CONSENT
FOR PRECASTED COVER SLAB
SHALL BE fc=35 MPa.

-TO PLAN THE INSTALLATION OF PIPES AFTER THE COMPLETION OF THE LOADING CONDITION

SL
-TO PROTECT THE PIPE WITH TEMPORARY/PERMANENT CONCRETE SLAB
-TO MODIFY THE GRADE LEVEL UP TO REACH THE H VALUE ABOVE TOP OF PIPE

TTEN
WRI
THE
H

THOUT
OPERATING PHASE CONSTRUCTION PHASE LOADING CONDITION REMARK

SL
DIA HS-20 TRUCK SPMT SPREADER MAT CRAWLER CRANE CRAWLER CRANE

WI
2 2 2
14 TON AXLE 31 TON/AXLE P<11.5 TON/M 11.5<P<20.0 TON/M 20.0<P<30.0 TON/M
- - -

NG
INCH mm mm mm mm mm

DRAWI
2 600 600 600 NA NA

4 600 600 600 600 2200

S
THI
SLAB

6 600 600 600 1000 3600

SL

FROM
8 900 600 600 1000 3400

10 900 600 600 900 3300

NED
12 900 900 600 900 2800

OBTAI
14 900 900 600 900 2500

16 900 900 600 900 2500

BE
TSW/2 TSW/2 18 900 900 600 900 2400

PART,SHALL
TSW 20 900 900 600 900 2400 LEGEND:
EL. - ELEVATION
24 900 900 600 900 2300
P - PRESSURE TRANSMITTED BY CRANE TO THE SOIL
PLAN - BRIDGE SLAB D - PIPE DIAMETER
28 900 900 600 1000 2600 APPLICABLE FOR CSW ONLY
SCALE NTS 00
30 900 900 600 1000 2200

N
B

I
32 900 900 600 1000 2600 APPLICABLE FOR CSW ONLY

FULL,OR
36 900 900 600 900 2200
REFERENCE DRAWINGS
C OF PIPE & CONC. SLAB
L
LEGEND AND ABBREVIATION BA-736080-001
GRADE LEVEL CONCRETE GENERAL NOTES-1 BA-617401-001

CONCRETE GENERAL NOTES-2 BA-617401-002

N
I
N.150
ASTL
ASTT COVER

ON
TSW

REPRODUCTI
LIFTING LUG MI
00
(

75
+ 75

SAUDIARAMCO.NO
ST

75
ST
)
TYP.
75

300

ASTB

OF
A SW/2 SW/2 A

PROPERTY
TOP OF PIPE

2
"SAPPCO" 75mm
POLYSTYRENE INSULATION BOARD PRESSURE P<30 TON/M
(SEE NOTE-2) -

SOLE
TABLE - BRIDGE SLAB DESIGN

SLAB DIMENSIONS REBARS

THE
PIPE 'D' PIPE
ASTB / ASTT ASTL

ARE
DIAMETER 'D' A ST SL SW TSW
A SECTION (inch.) (mm) (mm) (mm) (mm) (mm)
DIA. Nos. DIA. SPACING

N
SCALE NTS

HEREI
00 2 450 1650

LIFTING LUG 4 550 1750


350 16 7 12 100

NED
SHALL BE GROUTED
SCALE: N.T.S
ONCE SLAB IN POSITION 6 650 1850

CONTAI
ONLY IF THE SLAB IS INSTALLED
PERMANENTLY UNDER GROUND 8 750 1950
REVISION VALIDATION

SW 10 800 2000 THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
12 900 2100
60

10-02145-0002
ASTT ASTL

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
14 600 400 1000 1000 2200 20 7 12 150 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

GSA ASP
16 1100 2300 03/18/19 03/18/19

60 REV.NO. DATE REVISION DESCRIPTION


+ 75

18 1200 2400

I
00 03/18/19 ISSUE FOR CONSTRUCTION

THE
JOB ORDER/EWO NO.
20 1250 2450 THIS REVISION IS NOT TO BE USED FOR
10-02145-0002
ST

CONSTRUCTION UNTIL CERTIFIED AND DATED

24 1450 2650
SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE
28 1600 2800 FOUNDATION PLN/LAYOUT/SECT/DET FDN
00

NG
500
30 1700 2900 CONCRETE SLABS FOR ROAD CROSSING

DRAWI
25 7 12 150
ASTL ASTB COMMON DRAWINGS, HAWIYAH GAS PLANT
32 1800 3000
16 DIA.

B HAWIYAH SAUDI ARABIA


SECTION 36 2000 3200

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
SCALE NTS
H99 Q BA-737424 001 00
JOB 032209 SP No. H99-CE-A-0012110 Saudi Aramco 2615 ENG. (05/05)

RESTRICTED VECTOR CADD-01

You might also like