You are on page 1of 6

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS

SFR
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 15411
NMM ZAA
ENGG CERT

DRAINAGE PIPING SYSTEMS


FOA

SUBSECTION INDEX

Part 1 - General
ISSUED FOR CONSTRUCTION

1.01 Description
DESCRIPTION

1.02 Quality Assurance


1.03 Submittals
1.04 Product Delivery, Storage Handling

Part 2 - Products

2.01 Drainage Pipes and Fittings


2.02 Above Ground Storm Water (Pipe Exposed to Outdoor)
2.03 Vent Cowls
2.04 Drainage Pipes (Drain, Waste and Vent) and Fittings (Battery Rooms)
JO/EWO

10-00965

Part 3 - Execution
06/20/22
DATE

3.01 Installation
NO.
REV

00

DISCIPLINE
ENGINEER PART 1 - GENERAL
SCEC
06/20/22
DATE:
1.01 Description
PROJECT
ENGINEER
FOA
A. This Section covers providing drainage piping systems inside buildings as shown on
06/20/22
DATE: the Drawings and specified herein, including all accessories required to complete the
CERTIFIED
NMM Work acceptable to Saudi Aramco Representative.
06/20/22
DATE:
CONSTRUCTION
1.02 Quality Assurance
AGENCY
ZAA

06/20/22
A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards,
DATE:
Codes and Standards as specified herein and listed in Section-15001.
OPERATIONS
SFR
B. Tests: Hydrostatic test at column of water equivalent to the rim elevation of the
06/20/22
DATE: upstream manhole as per IPC and SAES-S-070, Section 18.
CONTROL NUMBER
VERIFICATION

1.03 Submittals
EDSD

DATE:

A. Submit three (3) copies to Saudi Aramco Representative Shop Drawings and
BY:

manufacturer’s certified data for approval


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

10-00965-0001-001
(DCC) NO. _____________________

Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 1


Upgrade Security Facilities - Dhahran & Northern Area
X27 A HE-036080
of 00
SAUDI ARABIA BI / JO:
Dhahran & Northern Area 10-00965 3
EDSD/2616-0399.doc
733A: KH2117 Spec IFC Sub
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SFR
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Product Delivery, Storage and Handling
NMM ZAA
ENGG CERT

A. Refer to Section-15050 - Basic Mechanical Material and Methods.


FOA

PART 2 - PRODUCTS

2.01 Drainage Pipes and Fittings


ISSUED FOR CONSTRUCTION

A. All sanitary drainage lines , storm water, vents lines and condensate drains and up to
1.5 meters outside the building shall be as follows :
DESCRIPTION

1. Pipe: PVC, Schedule 40, ASTM D 2665.

2. Fittings: PVC, Schedule 40, ASTM D2665 or ASTM D3311 for solvent cement
joints.

3. Elastomeric seal conforming to ASTM D 3212.

4. Use necessary adaptor coupling where necessary for imperial/metric pipe


conversion.
JO/EWO

10-00965

5. Solvent cement ASTM D 2564.


06/20/22
DATE

6. ASTM D 1785 Standard Specification for Poly Vinyl Chloride (PVC) plastic
pipe, Schedule 40, 80 and 120.
NO.
REV

00

DISCIPLINE
ENGINEER 7. All PVC pipes exposed to return air plenum shall be fire proofed to comply
SCEC
with NFPA-90A
06/20/22
DATE:
PROJECT
ENGINEER 2.02 Above Ground Storm Water (Pipe Exposed to Outdoor)
FOA
06/20/22
DATE: Same pipe material of drainage pipe & fittings. All PVC pipes and fittings exposed to sunlight
CERTIFIED
NMM shall be protected from ultraviolet light by painting with exterior-grade water-based emulsion
06/20/22 as per SAES-L-610.
DATE:
CONSTRUCTION
AGENCY
ZAA
All storm water pipes exposed to return air plenum shall be fire proofed to comply with NFPA-
06/20/22
90A
DATE:
OPERATIONS
2.03 Vent Cowls
SFR

06/20/22
DATE: A. Supply and install vent cowls on all vent pipe termination roof and/or wherever shown
CONTROL NUMBER

on the Drawings. Each vent cowl shall have open slots all around cowl and shall be
VERIFICATION

cemented on to the vent pipe. Material of construction shall be PVC for normal drain.
EDSD

DATE:

2.04 Drainage Pipes (Drain, Waste and Vent) and Fittings (Battery Rooms)
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

A. All drainage pipes, fittings, floor drains and floor cleanouts serving battery room shall
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

10-00965-0001-001

be acid resistant materials. PVC Sch. 40 DWV Pipe to ASTM D66S or approved other
(DCC) NO. _____________________

Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 2


Upgrade Security Facilities - Dhahran & Northern Area
X27 A HE-036080
of 00
SAUDI ARABIA BI / JO:
Dhahran & Northern Area 10-00965 3
EDSD/2616-0399.doc
733A: KH2117 Spec IFC Sub
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SFR
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
acid resistance pipes, fittings and fixtures are also permitted for drain, waste and vent
NMM ZAA

lines.
ENGG CERT

FOA

PART 3 - EXECUTION

3.01 Installation

A. Vents, clean outs and line slopes whether indicated on drawings or not shall be
ISSUED FOR CONSTRUCTION

provided and installed per IPC and Saudi Aramco Standards.


DESCRIPTION

B. Comply with related section requirements and IPC and SAES-S-070.

C. Cleaning: Clean piping system per applicable Saudi Aramco Standards and IPC
requirements.

D. Replace or repair damage, materials, equipment and defective Work as directed by


Saudi Aramco Representative at no additional cost to Saudi Aramco.
JO/EWO

10-00965

- END OF SECTION -
06/20/22
NO. DATE
REV

00

DISCIPLINE
ENGINEER
SCEC
06/20/22
DATE:
PROJECT
ENGINEER
FOA
06/20/22
DATE:
CERTIFIED
NMM

06/20/22
DATE:
CONSTRUCTION
AGENCY
ZAA

06/20/22
DATE:
OPERATIONS
SFR

06/20/22
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

10-00965-0001-001
(DCC) NO. _____________________

Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 3


Upgrade Security Facilities - Dhahran & Northern Area
X27 A HE-036080
of 00
SAUDI ARABIA BI / JO:
Dhahran & Northern Area 10-00965 3
EDSD/2616-0399.doc
733A: KH2117 Spec IFC Sub
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SFR
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 15411
NMM ZAA
ENGG CERT

DRAINAGE PIPING SYSTEMS


FOA

SUBSECTION INDEX

Part 1 - General
ISSUED FOR CONSTRUCTION

1.01 Description
DESCRIPTION

1.02 Quality Assurance


1.03 Submittals
1.04 Product Delivery, Storage Handling

Part 2 - Products

2.01 Drainage Pipes and Fittings


2.02 Above Ground Storm Water (Pipe Exposed to Outdoor)
2.03 Vent Cowls
2.04 Drainage Pipes (Drain, Waste and Vent) and Fittings (Battery Rooms)
JO/EWO

10-00965

Part 3 - Execution
06/20/22
DATE

3.01 Installation
NO.
REV

00

DISCIPLINE
ENGINEER PART 1 - GENERAL
SCEC
06/20/22
DATE:
1.01 Description
PROJECT
ENGINEER
FOA
A. This Section covers providing drainage piping systems inside buildings as shown on
06/20/22
DATE: the Drawings and specified herein, including all accessories required to complete the
CERTIFIED
NMM Work acceptable to Saudi Aramco Representative.
06/20/22
DATE:
CONSTRUCTION
1.02 Quality Assurance
AGENCY
ZAA

06/20/22
A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards,
DATE:
Codes and Standards as specified herein and listed in Section-15001.
OPERATIONS
SFR
B. Tests: Hydrostatic test at column of water equivalent to the rim elevation of the
06/20/22
DATE: upstream manhole as per IPC and SAES-S-070, Section 18.
CONTROL NUMBER
VERIFICATION

1.03 Submittals
EDSD

DATE:

A. Submit three (3) copies to Saudi Aramco Representative Shop Drawings and
BY:

manufacturer’s certified data for approval


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

10-00965-0001-001
(DCC) NO. _____________________

Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 1


Upgrade Security Facilities - Dhahran & Northern Area
X27 A HE-036080
of 00
SAUDI ARABIA BI / JO:
Dhahran & Northern Area 10-00965 3
EDSD/2616-0399.doc
733A: KH2117 Spec IFC Sub
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SFR
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
acid resistance pipes, fittings and fixtures are also permitted for drain, waste and vent
NMM ZAA

lines.
ENGG CERT

FOA

PART 3 - EXECUTION

3.01 Installation

A. Vents, clean outs and line slopes whether indicated on drawings or not shall be
ISSUED FOR CONSTRUCTION

provided and installed per IPC and Saudi Aramco Standards.


DESCRIPTION

B. Comply with related section requirements and IPC and SAES-S-070.

C. Cleaning: Clean piping system per applicable Saudi Aramco Standards and IPC
requirements.

D. Replace or repair damage, materials, equipment and defective Work as directed by


Saudi Aramco Representative at no additional cost to Saudi Aramco.
JO/EWO

10-00965

- END OF SECTION -
06/20/22
NO. DATE
REV

00

DISCIPLINE
ENGINEER
SCEC
06/20/22
DATE:
PROJECT
ENGINEER
FOA
06/20/22
DATE:
CERTIFIED
NMM

06/20/22
DATE:
CONSTRUCTION
AGENCY
ZAA

06/20/22
DATE:
OPERATIONS
SFR

06/20/22
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


00

10-00965-0001-001
(DCC) NO. _____________________

Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Construction Specifications DOC 3


Upgrade Security Facilities - Dhahran & Northern Area
X27 A HE-036080
of 00
SAUDI ARABIA BI / JO:
Dhahran & Northern Area 10-00965 3
EDSD/2616-0399.doc
733A: KH2117 Spec IFC Sub

You might also like