Professional Documents
Culture Documents
PMT OPRNS
SFR
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 15411
NMM ZAA
ENGG CERT
SUBSECTION INDEX
Part 1 - General
ISSUED FOR CONSTRUCTION
1.01 Description
DESCRIPTION
Part 2 - Products
10-00965
Part 3 - Execution
06/20/22
DATE
3.01 Installation
NO.
REV
00
DISCIPLINE
ENGINEER PART 1 - GENERAL
SCEC
06/20/22
DATE:
1.01 Description
PROJECT
ENGINEER
FOA
A. This Section covers providing drainage piping systems inside buildings as shown on
06/20/22
DATE: the Drawings and specified herein, including all accessories required to complete the
CERTIFIED
NMM Work acceptable to Saudi Aramco Representative.
06/20/22
DATE:
CONSTRUCTION
1.02 Quality Assurance
AGENCY
ZAA
06/20/22
A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards,
DATE:
Codes and Standards as specified herein and listed in Section-15001.
OPERATIONS
SFR
B. Tests: Hydrostatic test at column of water equivalent to the rim elevation of the
06/20/22
DATE: upstream manhole as per IPC and SAES-S-070, Section 18.
CONTROL NUMBER
VERIFICATION
1.03 Submittals
EDSD
DATE:
A. Submit three (3) copies to Saudi Aramco Representative Shop Drawings and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-00965-0001-001
(DCC) NO. _____________________
Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
SFR
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.04 Product Delivery, Storage and Handling
NMM ZAA
ENGG CERT
PART 2 - PRODUCTS
A. All sanitary drainage lines , storm water, vents lines and condensate drains and up to
1.5 meters outside the building shall be as follows :
DESCRIPTION
2. Fittings: PVC, Schedule 40, ASTM D2665 or ASTM D3311 for solvent cement
joints.
10-00965
6. ASTM D 1785 Standard Specification for Poly Vinyl Chloride (PVC) plastic
pipe, Schedule 40, 80 and 120.
NO.
REV
00
DISCIPLINE
ENGINEER 7. All PVC pipes exposed to return air plenum shall be fire proofed to comply
SCEC
with NFPA-90A
06/20/22
DATE:
PROJECT
ENGINEER 2.02 Above Ground Storm Water (Pipe Exposed to Outdoor)
FOA
06/20/22
DATE: Same pipe material of drainage pipe & fittings. All PVC pipes and fittings exposed to sunlight
CERTIFIED
NMM shall be protected from ultraviolet light by painting with exterior-grade water-based emulsion
06/20/22 as per SAES-L-610.
DATE:
CONSTRUCTION
AGENCY
ZAA
All storm water pipes exposed to return air plenum shall be fire proofed to comply with NFPA-
06/20/22
90A
DATE:
OPERATIONS
2.03 Vent Cowls
SFR
06/20/22
DATE: A. Supply and install vent cowls on all vent pipe termination roof and/or wherever shown
CONTROL NUMBER
on the Drawings. Each vent cowl shall have open slots all around cowl and shall be
VERIFICATION
cemented on to the vent pipe. Material of construction shall be PVC for normal drain.
EDSD
DATE:
2.04 Drainage Pipes (Drain, Waste and Vent) and Fittings (Battery Rooms)
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
A. All drainage pipes, fittings, floor drains and floor cleanouts serving battery room shall
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-00965-0001-001
be acid resistant materials. PVC Sch. 40 DWV Pipe to ASTM D66S or approved other
(DCC) NO. _____________________
Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
SFR
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
acid resistance pipes, fittings and fixtures are also permitted for drain, waste and vent
NMM ZAA
lines.
ENGG CERT
FOA
PART 3 - EXECUTION
3.01 Installation
A. Vents, clean outs and line slopes whether indicated on drawings or not shall be
ISSUED FOR CONSTRUCTION
C. Cleaning: Clean piping system per applicable Saudi Aramco Standards and IPC
requirements.
10-00965
- END OF SECTION -
06/20/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
SCEC
06/20/22
DATE:
PROJECT
ENGINEER
FOA
06/20/22
DATE:
CERTIFIED
NMM
06/20/22
DATE:
CONSTRUCTION
AGENCY
ZAA
06/20/22
DATE:
OPERATIONS
SFR
06/20/22
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-00965-0001-001
(DCC) NO. _____________________
Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
SFR
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 15411
NMM ZAA
ENGG CERT
SUBSECTION INDEX
Part 1 - General
ISSUED FOR CONSTRUCTION
1.01 Description
DESCRIPTION
Part 2 - Products
10-00965
Part 3 - Execution
06/20/22
DATE
3.01 Installation
NO.
REV
00
DISCIPLINE
ENGINEER PART 1 - GENERAL
SCEC
06/20/22
DATE:
1.01 Description
PROJECT
ENGINEER
FOA
A. This Section covers providing drainage piping systems inside buildings as shown on
06/20/22
DATE: the Drawings and specified herein, including all accessories required to complete the
CERTIFIED
NMM Work acceptable to Saudi Aramco Representative.
06/20/22
DATE:
CONSTRUCTION
1.02 Quality Assurance
AGENCY
ZAA
06/20/22
A. Reference Codes and Standards: Comply with applicable Saudi Aramco Standards,
DATE:
Codes and Standards as specified herein and listed in Section-15001.
OPERATIONS
SFR
B. Tests: Hydrostatic test at column of water equivalent to the rim elevation of the
06/20/22
DATE: upstream manhole as per IPC and SAES-S-070, Section 18.
CONTROL NUMBER
VERIFICATION
1.03 Submittals
EDSD
DATE:
A. Submit three (3) copies to Saudi Aramco Representative Shop Drawings and
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-00965-0001-001
(DCC) NO. _____________________
Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
SFR
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
acid resistance pipes, fittings and fixtures are also permitted for drain, waste and vent
NMM ZAA
lines.
ENGG CERT
FOA
PART 3 - EXECUTION
3.01 Installation
A. Vents, clean outs and line slopes whether indicated on drawings or not shall be
ISSUED FOR CONSTRUCTION
C. Cleaning: Clean piping system per applicable Saudi Aramco Standards and IPC
requirements.
10-00965
- END OF SECTION -
06/20/22
NO. DATE
REV
00
DISCIPLINE
ENGINEER
SCEC
06/20/22
DATE:
PROJECT
ENGINEER
FOA
06/20/22
DATE:
CERTIFIED
NMM
06/20/22
DATE:
CONSTRUCTION
AGENCY
ZAA
06/20/22
DATE:
OPERATIONS
SFR
06/20/22
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
10-00965-0001-001
(DCC) NO. _____________________
Section 15411
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION