SUMMARY OF FIE LD DENSII rY(SAND . TEST REPORT


Client M.l.A. Arabia Co. 1 56589
Hawiyah Gas Plant Expansion Date 28 Jul.2021
Hawiyah Gas Plant
Test
ASTM D-6938 Di recUback scatter depth 200 mm. Density S.G. 1648
Method
Unit No. 281 B0 60 Sec. 642
GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac

ln-Situ ln-Situ
Test Dry Wet
No.
Location
Density Density
ko/m3 ko/m3
01 For B00-H46-PF-46552, B00-H46-PF- 3'd Layer Sand 1 696 1 799 61 75.2
46558, B00-H46-PF-4655 1,, B00-H46-
02 -do- -do- 693 1815 72 74.2
PF-46553,,800-H46-PF-46568 prior to 1

Pre cast Alignment

Lab. Min lndex 0/


1769 1507 70
Densitv Ko/m3

The tested area meets with the required Project Specification.


RFI # HGP-CIV-MA-03765
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAl H (Abqatq Lab. '


. Lab
c. H, ao50oo4 CTTA #
CTTA # 0060 tl!:rnp.villE.onty tor ubir;t icpofi4

Form No. MAT.3.06 llssue.01 I Rev.04 Date: 01 May 202'l


This document is uncontrolled once printed or downloaded and mav not reflecl the latest version.
Gonstruction M
Abqaiq Branch
--'Fl;l?Jilf33Jiff,
Certificate # 3512.02
J;3.'#
Saudi
3ii3,'
Arabia - E-mail.:
frcno
rhaimi.com!
- Suhaimi
SUMMARY O F FIELD DENSI rY(SAND . TEST REPORT
Client M.l.A. Arabia Co. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Hawiyah Gas Plant !nspector
Test
ASTM D-6938 Di rect/back scatter depth 200 mm. Density S.C. 648
Method 1

Unit No. 28180 Duration of tests 60 Sec. 642


GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac

ln-Situ ln-Situ
Test Depth/ Relative
Location Dry Wet
No. Elevation Density Density
Density ot
ko/m3 ko/m3
01 For B0'l -H89-STR-1 46A-4-1, B01 -H89- 3'd Layer Sand 1 693 1819 75 74.2
sTR-1 46A-4-2, B0 1 -H8g-STR-1 49F-A-
02 -do- -do- 1 691 1823 7.8 73.5
1, 801-H89-STR-149F-A-2 prior to
lnstallation @ Flare

Project
1769 1 507 70 o/o
Specification

The tested area meets with the required Project Specification.


RFI # HGP-CIV-MA-03766
The result relate only to the items tested.

Tested by:.
CTTA #
lmtiaz Akhtar . : tJ ;,i*). f.:"I 16
i
1,
-1
0197
;I:i:g-S.*,t.o,Jr, i

Reviewed by: AliAl He (Abqaiq Lab.


c. B.20sooo4116
(Shmp Valid only for lab
CTTA # 0060 Tesl Reoo

Form No. MAT.3.06 llssue. 01 I Rev.04 Date:01 May 202'l


This document is unconlrolled once printed or downloaded and may not reflect the latest version
c o n s tru c'' n l-a bo ra th}g
"' Abqaiq
X8ltjf 'ili"til
Branch J./f-v - q&olrflJ
tlU-t'IJIII-JLI
--'f:;1?Jilf33Jfff,
ACCREbITED
Certificate # 3512.02
J;3,""#31f3,
Saudi Arabia - E-mail.: imi.coml
f.rcno - Suhaimi
SUMMARY OF FIELD DENSITY SAND . TEST RE ,ORT
Client M.!.A. Arabia Co. Job No. I 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant Inspector
Test
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.C. 648
Method 1

Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642


Gauge Serial# / Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac pandian.miaarabia@email.com

ln-Situ ln-Situ
Test Depth/ ln-Situ Relative
Location Soil Dry Wet
No. Elevation Moisture Density
Type Density Density ot ot
to
ko/m3 kq/m3
01 For B01 -H89-STR-1464-A-1, B01 -H89- 4th Layer Sand 1 695 1814 7.0 74.9
sTR-1 46A-A-2, B01 -H8g-STR-1 49F-A-
02 -do- -do- 1697 1823 74 75.6
1, 801-H89-STR-'149F-A-2 prior to
lnstallation @ Flare

Lab. Max. lndex Density Lab. Min lndex Project


1 769 1507 70 o/o
Kq/m3 Densitv Ko/m3 Specification

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03767
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AIiAIH (Abqaiq Lab. 01) . Lab


c. R.2osoooqrr6 CTTA #
lShmp Valid only for taU f-esr Riportsl

This document is unconlrolled once printed or dow,nloaded and mav nol reflecl the latest version
s t ru cti o n
X 3lT,['; *""til
t t-a bo ratyh] - q1o1:-uJ I
J;fi,??lr'if3,
P.O. Box

Saudi Arabia -
2165
E-mail.
_E_ - SUhaimi
GRo e. ,1, ri-r-i

SUMMARY OF FIELD D ENSIIrY(SAND . TEST REPORT


Glient M.!.A. Arabia Co. 1 56589
Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant

ASTM D-6938 Di rect/back scatter depth 200 mm. Density S.C. 1648
Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642
GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac

ln-Situ ln-Situ
Test Dry Wet
Location Soil
No. Density Density
Type
kq/m3 ko/m3
01 8th Layer Sand 1 689 1811 72 72.8
For B02U-DP-8002,Prior to Pre
installation

Lab. Min lndex 0/


1769 1507 70
Density Kq/m3

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03768
The result relate only to the items tested.

Tested by: lmtiaz Akhtar ' a;',;,t).6f*:JlL5';


CTTA # 0197 -.i-lr=rrrr - Suxarrr
=l
Material Divlsion
(Abqaiq Lab. 01)
Reviewed by: AliAlH c. R. 20500041 10 1 Lao
(Sbmp Valid only tor Lab lesi
CTTA # 0060

Form No. MAT.3.06 I lssue. 01 I Rev.04 Date: 01 May 2021


This doctrment is uncontrolled once printed or dov,nloaded and may nol reflect the latesl version
Gonstruc t'
"' X th!:l n t- a b o ra
- q1n1:ul I
3 l"rt';'B r:"n="'il
1586 ..,1f.---
,';3,"#.'1ff --'fl;l?Jili33,'3ff,
- Q I rln -rirrri
2165
P.O. Box

-
Saudi Arabia E-mail.:
frcno
Tel.: (013)566
- Suhaimi
SUMMARY OF FIELD DENSI]IY(SAND . TEST RE ,ORT
Client M.l.A. Arabia Co. Job No. 1 56s89
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant
Test
ASTM D.6938 DirecUback scatter depth 200 mm. Density S.C. 1648
Method
28'180 Duration of tests 60 Sec. Moisture S.C. 642
GaugeSerial#/Model. 3430 20 Dec.2020
Client Contac

ln-Situ ln-Situ
Test Relative
Depth/ Soi! Dry Wet
Location Density
No. Elevation Type Density Density ot
lo
kq/m3 ko/m3
01 9th Layer Sand 1 693 1 808 7.0 74.2
For B01U-OMH-9010 as per drawing
@ flare

Lab. Max. lndex Density 0h


1769 1507 70
Kq/m3

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03769
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAl Flen


. Lab
CTTA #
CTTA # 0060

Form No. MAT.3.06 I lssue.01 I Rev.04 Date: 01 May 2021


This documenl is uncontrolled once printed or downloaded and may nol reflecl the latesl ver.tion
Abqaiq Branch
P.O. Box 2165 - Te!.: (013)566 1586
Dammam 31451
Saudi Arabia - E-mail.:
- Fax.i(01i]) 565 3412 - Suhaimi
SUMMARY OF FIEL D DENSI]rY(SAND . TEST REPORT
Client M.!.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Test
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.C.
Method 1 648
Unit No. 28180 Duration of tests 60 Sec. Moisture S.C. 642
GaugeSerial#/Mode!. 3430 Date of Last Galibration 20 Dec.202O
Client Contac pandian.miaarabia@qmail.com

!n-Situ ln-Situ
Test Depth/ Dry
ln-Situ Relative
Location Soil Wet
No. Elevation Density Density Moisture Density
Type ot
to ot
lo
kq/m3 ko/m3
01 For BO2U-OMH-8002 @ STG 3'd Layer Sand 1 691 1 803 66 73.5

Lab. Max. lndex Density Lab. Min Index Project


1769 1 507 70
Kq/m3 Densitv Ko/m3 Specification Yo

Remarks The tested area meets with the required Project Specification.
The result relate only to the items tested. RFI # HGP-CIV-MA-03770

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: Ali Al Herz


Sr. Lab Supervisor . Lab
CTTA # 0060
t
Form No. MAT.3.06 I lssue. 01 I Rev.04 Date: 01 May 2021
This doument is unconlrolled once printecl or downloaded ond may not reflect lhe lotesl yersion
Materials Testing La
Abqaiq Branch
,i;H-"#ilf3,
P.O. Box 2165
Dammam 31451
Saudi Arabia - E-mail.
GRo - Suhaimi
SUMMARY O F FIELD DENSI]rY(SAND . TEST REPORT
Client M.l.A. Arabia Co. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Jul.2021
Location Hawiyah Gas Plant

ASTM D-6938 Di rect/back scatter depth 200 mm. 1648

28180 60 Sec. Moisture S.C. 642


Gauge Serial# / Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac

In-Situ ln-Situ
Test Relative
Location Soil Dry Wet
No. Density Density Density
Type lo
ko/m3 ko/m3
01 For BO2U-OMH-8002 @ STG 4th Layer Sand 1 695 1810 68 74.9

Lab. Max. lndex Density Project 0h


1769 1507 70
Kq/m3 Specification

The tested area meets with the required Project Specification.


The result relate only to the items tested.
RF# HGP-CIV-MA-03771

Tested by: lmtiaz Akhtar


CTTA # 01 97

proved
Reviewed by: AliAl-H (Abqais Lab.-il'i . Lab
c_ B. 2os0o0ar r[r
CTTA # 0060 (Slam,o
Validpnly for Lab

Form No. MAT.3.06 I lssue.01 I Rev.04 Date: 01 May 2021


This document i.s unconlrolled once printed or downloaded and mav not re/lecl the latest version.
nstructionX3l"r',8'B;?t"t;''tLaborat$p!-qnfl
:tttJl
--'Fl;1?Jili33,'ilf,
Certificate # 3512.02
J;fl'"'.H.'1f3,
Saudi Arabia - E.mail.:
frcno
imi.coml
- Suhaimi
SUMMARY OF FIELD DENS ITY(SAND - TEST REPORT
GIient M.l.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas PIant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Test
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.G. 648
Method 1

Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642


GaugeSerial#/Mode!. 3430 Date of Last Calibration 20 Dec.2020
Client Contac pandian.miaarabia@email. com

ln-Situ ln-Situ
Test Depth/ In-Situ Relative
Location Soil Dry Wet
No. Elevation Moisture Density
Type Density Density ot o,
to to
kq/m3 kq/m3
F or 20-4" -FW-1 1 823/800U_A (20mtr)
01 Final Layer Sand 690 1812 7.2 731
prior to pipe installinq 1

Lab. Max. lndex Density Lab. Min lndex Project


1 769 1 507 70 o/o
Kq/m3 Densitv Ko/m3 Specification

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03773
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAi H (Abqaiq Lab. oi r . Lab


c. 8.2050004110
CTTA # 0060 (Stamp Valid
only for Lab Test Beiorts)

Form No. MAT.3.06 llssue.01 I Rev.04 Date:


This document is uncontrolled once printed or downloaded and mav not reflecl the latest version
X'1T,E'; r:""""til
Abqaiq
n La bo rathl.j.9 - qJLorrd I
Certificate # 3512.02
J;3,',,Hi1f3,,
P.O. Box 2165
Dammam 31451
Saudi Arabia - E-mail.
trRo - Suhaimi
SUMM ARY OF FIELD DENSI] rY(SAND . TEST REF,ORT
Client M.l.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Test
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.C. 648
Method 1

Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642


GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac pandian.miaarabia@email. com

ln-Situ ln-Situ
Test !n-Situ Relative
Depth/ Soil Dry Wet
Location Moisture Density
No. Elevation Type Density Density ot ot
to lo
kq/m3 kq/m3
01 For 80-12'-OWS-'l 1255/802U A Final Layer Sand 1 689 1 800 66 72.8
(33mtr), 80-8"-CSW-1 1475-IFEOU-N,
02 -do- -do- 1 693 1797 62 74.2
80-8"-CSW-1 1 476-IFEOU-N prior to
pipe laying
03 -do- -do- 1 691 1 804 67 73.5

Lab. Max. lndex Density Lab. Min lndex '1507 Project


1 769 70 Yo
Kq/m3 Densitv Ko/m3 Soecification

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03776
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

lyrarerial Dlvlrlan
Reviewed by: (Abqaiq Lab. 01)
Sr. Lab Supervisor c. R. 20so0041 10 Sr. Lab
CTTA #
CTTA # 0060

Form No. MAT.3.06 I lssue.01 I Rev.04 Date: 01 May 202'l


This document is uncontrolled once prinled or downloadecl and mav not re/lect the latest version.
c o n s t r u c t'
" il?t"til
X 3 1""',';'
n La b o ra th:J - qt.orrilJ I
--';l;
J;3,'# 31ii,,'
Saudi Arabia -
1?;ili33,';ff,
E-mail.:
fircno - Suhaimi
SUMMARY OF FIELD DENSI.I rY(SAND . TEST RE )ORT
Client M.l.A. Arabia Co. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Hawiyah Gas Plant

ASTM D-6938 Direct/back scatter depth 200 mm. Density S.C. 1 648
Unit No. 281 80 Duration of tests 60 Sec. 642
Gauge Serial# / Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac

In-Situ
Dry Relative
Location Soil Density
Type Density ot
lo
ko/m3
01 For A09U-OMH-9132 @ MS # 5 2nd Layer Sand 1694 1 805 66 74.5

Lab. Max. lndex Density


1769 1507 70 o/o
Kq/m3

Remarks The tested area meets with the required Project Specification.
The result relate only to the items tested.
RF# HGP-CrV-MA-03758

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAfH MetBriHl


'.
Lab
Sr. Lab'Supervisor (oloqig CTTA #
CTTA # 0060

Form No. MAT.3.06 Ilssue.01 I Rev.04 Date:


This document is uncontrolled once printed or downloaded and mav not reflect lhe latest version
onstruction Materials Testing
Abqaiq Branch
P.O. Box 2165 - Tel.: (013)566 1586
Certificate # 3512.02
Dammam 31451
Saudi Arabia - E-mail.:
- Fax.:(013)565 3412 - Suhaimi
SUMMARY OF FIELD DENSI.I rY(SAND . TEST REPORT
Client M.l.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Test
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.C. '1648
Method
Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642
GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contac pandian.miaarabia(@ gmail. com

ln-Situ ln-Situ
Test Relative
Depth/ Soi! Dry Wet
Location Density
No. Elevation Type Density Density o,
kq/m3 kq/m3
01 For A09U-OMH-9132 @ MS # 5 lstLayer Sand 1692 1812 7.1 73.8

Lab. Max. lndex Density Lab. Min lndex Project


1769 1507 70 Yo
Kq/m3 Densitv Kq/m3 Specification

Remarks The tested area meets with the required Project Specification.
RFI # HGP-CIV-MA-03757
The result relate onlv to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAl Hen


. Lab
Sr. Lab Supervisor
CTTA # 0060

Form No. MAT.3.06 I lssue.01 I Rev.04 Date:01 May 2021


This doument is uncontrolled once printed or dottnloaded ond mav not reflect lhe latest version
Construc
Abqaiq Branch
2165 - Tel.: (013)5661586
P.O. Box

Certificate # 3512.02
Dammam 31451 - Fax.:(013) 565 3412 o - Suhaimi
Saudi Arabia - E-mail.:

SUMMARY OF FIELD DENSITY . TEST REPORT


Client M.l.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Sampling
ASTM D-6938 Di recUback scatter depth 200 mm. Density S.C. 1648
Plan/Method
Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642
GaugeSerial#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contact pandian.m iaarabia@qmail.com

ln-Situ ln-Situ
Test Depth/
ln-Situ
Soil Dry Wet Compaction
Location Moisture ot
No. Elevation Type Density Density ol lo
to
kq/m3 kq/m3
01
F or 204" -FW-l 1 823/B00U_A (20mk) prior Final Layer S/G 1870 2003 71 96.1
to sand bedding

Max. Dry Density Optimum Moisture Project


(Control). Ko/m3 1 946 73 90%
Content% Specification

The tested area meets with the required Project Specification.


Remarks RFI # HGP-CIV-MA-03772
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: AliAl


. Lab
CTTA # 0060

Form No. MAT.3.06 I lssue.01 I Rev. 04 Date: 01 May 2021


This document is uncontrolled once printed or downloaded and mav nol reflecl lhe lalest version
construct'"'X;1".18';r*".'ilnl-aborath!!-qJu+rtill
--'fkl?Jilf33J3lf,
Certificate # 3512.02
J;3,"'#31f3,
Saudi Arabia - E-mail.:
frcno
rhaimi.coml
- Suhaimi
SUMMARY OF FIELD DENSITY . TEST REPORT
Client M.l.A. Arabia Co. Job No. 1 56589
Project Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant lnspector
Sampling
ASTM D-6938 DirecUback scatter depth 200 mm. Density S.C. 648
Plan/Method 1

Unit No. 281 80 Duration of tests 60 Sec. Moisture S.C. 642


GaugeSeria!#/Model. 3430 Date of Last Calibration 20 Dec.2020
Client Contact oandian.miaarabia@omail.com

ln-Situ ln-Situ
Test ln-Situ
Depth/ Soil Dry Wet Compaction
Location Moisture ot
No. Elevation Type Density Density ol
lo
ko/m3 kq/m3
01 st Layer s.
For Road crossing 801-H89-lDB-1 X 4-680 1 Fiil 1837 1 966 70 95.0
( 8 MTR ) as per drawing @ flare

Max. Dry Density Optimum Moisture Project


(Control). Ko/m3 1934 74 90%
Content% Specification

The tested area meets with the required Project Specification.


Remarks RFI # HGP-CIV-MA-03777
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by:
Sr. Lab Supervisor (Abq6lq t-ab. oi
. Lab
CTTA # 0060
CTTA #

Form No. MAT.3.06 I Issue.01 ! Rev.04 Date: 01 May 2021


This document is unconlrolled once prinled or downloqded and mav not re/lect lhe ldlesl version.
Gonstruction Materials Testing Laboral
Abqaiq Branch
P.O. Box 2165 - Tel.: (013)
(013)566 1586
Dammam 31451
Saudi Arabia - E-mail.:
- Fax.:(013) 565 341: o - Suhaimi
SUMMARY OF FIELD DENSITY. TEST REPORT
Client M.l.A. Arabia Co. Job No. 1 56589
Hawiyah Gas Plant Expansion Date 28 Ju|.2021
Location Hawiyah Gas Plant
Sampling
ASTM D-6938 Di recUback scatter depth 200 mm. Density S.G. 648
Plan/Method 1

281 80 Duration of tests 60 Sec 642


GaugeSerial#/Model. 3430 Date of Last Galibration 20 Dec.2020
Client Contact

ln-Situ ln-Situ
Location Soil Dry Wet
Type Density Density
ko/m3 kq/m3
01
For Road crossing B0'l-H89-lDB -1 X 4- 2nd Layer s. Fiil 1 801 1919 66 93.1
680 (8 MTR) as per drawing @ flare

Optimum Moisture Project


1934
Content%
74 90%
Specification
The tested area meets with the required Prolect Specification.
Remarks RFI # HGP-CIV-MA-03778
The result relate only to the items tested.

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by: Material Divl


(Abqaiq Lab. b . Lab
CTTA # 0060
CTTA #

Form No. MAT.3.06 I Issue.01 I Rev.04 Date: 01 May 2021


This document is uncontrolled once printed or downloaded and may not rellect the latest version
FUGRO.SUHAIMI LTD.

F""o-Suhaimi
TACK COAT APPLICATION SPRAY RATE DETERMINATION - TEST DATA
Client M.l.A. Arabia Go. Job No. 1 56589

Project Hawiyah Gas Plant Expansion Testing Date 28 Ju|.2021


Location Hawiyah Gas Plant RFI No # HGP-CIV-MA-03757
For B06U-CBH-901 05,B06U-CBH-901 06,B06U-CBH-
90103,B06U-CBH-90't04, B06U-CBH-901 15,B06U- Supplier
Spray Location CBH-901 1 6,B06U-CBH-901 1 3,B06U-CBH-901 1 4 prior Al Samah
to Wearing course coat installation as per attached
Layout Drawing @PR-027 area
Sampling Plan /
Material Cutback Asphalt (Grade : RC - 70) Method ASTM D2995-

CIient Contact oandian.miaarabia@omail.com

SaudiAramco
S. No. Description Unit Measured Values Specification
SAES.Q.OO6
1 Weight of Test Strip without RC - 70 gm 392

2 Weight of Test Strip with RC - 70 gm 449

3 Weight of RC - 70 (2\ - (1) gm 57

4 Area of Test Strip Used cm2 2500

5 Rate of Spray, (3)/ (4). glcmz 0.023

6 Rate of Spray, (5)/ 0.10 kglm2 0.23

7
*Rate of Spray (Corrected)
Its/m2 0.24

8 Range of Application Rate liters / m2 0.24 0.25 Max.

9 Range of Application Temperature: oc 80 55 "C to 80 "C

*Rate
of spray is converted into lts/m2 based on the specific gravity of RC-70 which is 0.95 at 80 'C.

Equipment used:

The test result indicated that the measured rate of spray is litre / and it is within the project
Remarks:
ranoe.

Test Witnessed by representatives of CLIENT QA / QC Engineers.


.__._."..c'r!

Tested by: lmtiaz Akhtar


CTTA # 0197

Reviewed by:

CTTA # 0060

Form No. MAT.5.14 A I lssue. 01 I Rev. 04 Date: 01 May 2021


Page I of I This document is uncontrolled once prinled or downloaded and may not reflect lhe latest version

You might also like