Construction Specification 45—Plastic Pipe

1. Scope
The work consists of furnishing and installing plastic pipe (except corrugated polyethylene pipe) and the necessary
fittings and appurtenances as shown on the drawings or as specified herein.

2. Material
Pipe, fittings, and gaskets shall conform to the requirements of Material Specification 547, Plastic Pipe, and as
specified in section 14 of this specification or as shown on the drawings.

Perforated pipe shall conform to the requirements of Material Specification 547, Plastic Pipe, and as specified in
section 14 of this specification or as shown on the drawings.

Unless otherwise specified, concrete shall conform to the requirements of Construction Specification 32, Structure
Concrete, and section 8 of this specification.

Unless otherwise specified, earth backfill shall conform to the requirements of Construction Specification 23,
Earthfill.

Unless otherwise specified, drainfill shall conform to the requirements of Construction Specification 24, Drainfill.

3. Handling and storage


Pipe shall be delivered to the job site and handled by means that provide adequate support to the pipe and do not
subject it to undue stresses or damage. When handling and placing plastic pipe, care shall be taken to prevent im-
pact blows, abrasion damage, and gouging or cutting (by metal edges and/or surface or rocks). The manufacturer's
special handling requirements shall be strictly observed. Special care shall be taken to avoid impact when the pipe
must be handled at a temperature of 40 degrees Fahrenheit or less.

Pipe shall be stored on a relatively flat surface so that the barrels are evenly supported. Unless the pipe is specifi-
cally manufactured to withstand exposure to ultraviolet radiation, it shall be covered with an opaque material
when stored outdoors for 15 days or longer.

4. Excavation
Excavation shall be in accordance with Construction Specification 21, Excavation, and section 14 of this specifica-
tion or as shown on the drawings.

The pipe foundation shall be excavated a minimum of 4 inches lower than the pipe grade shown on the drawings or
staked in the field whenever bedrock, boulders, cobbles, or other material that may cause pipe damage is encoun-
tered at planned pipe grade.

5. Laying the pipe


Plastic pipe conduits complete with fittings and other related appurtenances shall be installed to the lines and
grades shown on the drawings or specified in section 14 of this specification. The pipe shall be installed so that
there is no reversal of grade between joints unless otherwise shown on the drawings. The pipe shall not be dropped
or dumped on the bedding or into the pipe trench. The ground surface near the pipe trench shall be free of loose
rocks and stones greater than 1 inch in diameter. This ensures that rock will not be displaced and impact the pipe.

(210-VI-NEH, January 2009) 45–1


Just before placement, each pipe section shall be inspected to ensure that all foreign material is removed from in-
side the pipe. The pipe ends and the couplings shall be free of foreign material when assembled. At the completion
of a work shift, all open ends of the pipeline shall be temporarily closed off using a suitable cover or plug.

Care shall be taken to prevent distortion and damage during hot or cold weather. During unusually hot weather
(daytime high temperature of more than 90 °F), the pipe assembled in the trench shall be lightly backfilled or
shaded to keep it as near to ground temperature as possible until final backfill is placed. Backfill operations should
be performed during daily construction periods when the ground temperature and the temperature of the pipe do
not vary more than 40 degrees Fahrenheit.

Perforated pipe shall be installed with the perforations down and oriented symmetrically about the vertical center-
line. Perforations shall be clear of any obstructions on the inside and outside of the pipe when the pipe is approved
by the engineer for backfill.

During installation, the pipe shall be firmly and uniformly bedded throughout its entire length, to the depth and in
the manner specified in section 14 of this specification or as shown on the drawings. Bell-holes shall be placed in
bedding material under bells, couplings, and other fittings to assure the pipe is uniformly supported throughout its
entire length. Blocking or mounding beneath the pipe to bring the pipe to final grade is not permitted.

6. Pipe embedment
Earth bedding—The pipe shall be firmly and uniformly placed on compacted earthfill bedding or an inplace earth
material bedding of ample bearing strength to support the pipe without noticeable settlement. The earth material
on which the pipe is placed shall be of uniform density to prevent differential settlement.

Unless otherwise specified, a groove that closely conforms to the outside surface of the pipe shall be formed in the
bedding. The depth of the groove shall be equal to or greater than 0.3 of the pipe diameter.

Earth bedding shall be compacted to a density not less than adjacent undisturbed inplace earth material or be com-
pacted earth backfill. Earthfill material used for compacted earth bedding shall be free of rocks or stones greater
than 1 inch in diameter and earth clods greater than 2 inches in diameter. The pipe shall be loaded sufficiently dur-
ing the compaction of bedding under the haunches and around the sides of the pipe to prevent displacement from
its final approved placement.

Sand, gravel, or crushed rock bedding—When sand, gravel, or crushed rock bedding is specified, the pipe shall
be firmly and uniformly placed on the bedding material. Material for bedding shall not exceed 1 inch in diameter.
Unless otherwise specified in section 14 of this specification or shown on the drawings, the coarse-grained bedding
material shall be carefully placed and compacted to a depth equal to or greater than 0.3 of the diameter of the pipe
above the bottom of the pipe. The pipe shall be loaded sufficiently during backfilling and compaction around the
sides to prevent displacement of the pipe from its final approved placement.

Pipe encased in drainfill—The pipe shall be firmly and uniformly placed on bedding of specified drainfill. Drain-
fill shall be placed and compacted as specified in section 14 of this specification or as shown on the drawings to
form a continuous uniform support around the entire circumference of the pipe. The pipe shall be loaded sufficient-
ly during backfilling around the sides and during compaction to prevent displacement of the pipe.

45–2 (210-VI-NEH, January 2009)


7. Backfill
Initial backfill—Unless otherwise specified, initial backfill to 6 inches above the top of the conduit is required.
Earth haunching and initial backfill material shall consist of soil material that is free of rocks, stones, or hard clods
more than 1 inch in diameter. Coarse backfill material shall be the specified sand, gravel, crushed rock, or drainfill
material.

Initial backfill shall be placed in two stages. In the first stage (haunching), backfill is placed to the pipe spring line
(center of pipe). In the second stage, it is placed to 6 inches above the top of the pipe.

The first stage material shall be worked carefully under the haunches of the pipe to provide continuous support
throughout the entire pipe length. The haunching backfill material shall be placed in layers that have a maximum
thickness of about 6 inches and are compacted as specified in section 14 of this specification or as shown on the
drawings. During compaction operations, care shall be taken to ensure that the tamping or vibratory equipment
does not come in contact with the pipe and the pipe is not deformed or displaced.

When pressure testing is not specified, the pipe shall be covered with a minimum of 6 inches of backfill material as
soon as possible following assembling of the pipe in the trench, but not later than within the same day that place-
ment has occurred. When pressure testing is specified, sufficient backfill material shall be placed over the pipe to
anchor the conduit against movement during pressure testing activities.

Final backfill—Final backfill shall consist of placing the remaining material required to complete the backfill from
the top of the initial backfill to the ground surface, including mounding at the top of the trench. Final backfill mate-
rial within 2 feet of the top of the pipe shall be free of debris or rocks larger than 3 inches nominal diameter. Coarse
backfill material shall be the specified sand, gravel, crushed rock, or drainfill. Final backfill shall be placed in ap-
proximately uniform, compacted layers. Final backfill compaction requirements shall be as specified in section 14
of this specification or as shown on the drawings.

Vehicles or construction equipment shall not be allowed to cross the pipe until the minimum earth cover and re-
quired density as specified in section 14 of this specification has been obtained.

8. Pipe encasement in concrete


Concrete encasement shall be carefully placed to form a continuous uniform support around the entire circum-
ference of the pipe as specified in section 14 of this specification or as shown on the drawings. Pipes encased in
concrete shall be securely anchored to prevent movement of the pipe during concrete placement. A clear distance
of 1.5 inch shall be maintained between the pipe and the reinforcing steel.

The concrete for the encasement shall conform to the requirements of Construction Specification 32, Structure
Concrete, for Class 3000M concrete unless otherwise specified.

9. Joints
Unless otherwise specified in section 14 of this specification or shown on the drawings, joints shall be either bell
and spigot type with elastomeric gaskets, coupling type, solvent cement bell and spigot, or jointed by butt heat fu-
sion. When a lubricant is required to facilitate joint assembly, it shall be a type having no deleterious affect on the
gasket or pipe material.

Pipe joints shall be watertight at the pressures specified except where unsealed joints are indicated.

Pipe shall be installed and joined in accordance with the manufacturer's recommendations. Laying deflections and
joint fitting or stab depths shall be within the manufacturer's recommended tolerances.

(210–VI–NEH, January 2009) 45–3


When solvent cement joints are specified for PVC or ABS pipe and fittings, they shall be made in accordance with
the following ASTMs and the related appendix of each ASTM; D 2855 for PVC pipe and fittings and D 2235 for ABS
pipe and fittings.

Flanged, banded, heat-fusion, or elastomeric-sealed mechanical joints shall be used when joining polyethylene (PE)
and high density polyethylene (HDPE) pipe and fittings unless otherwise specified in section 14 of this specification
or as shown on the drawings.

Pipe ends shall be cut square and be deburred to provide a uniform, smooth surface for the jointing process.
Reference marks shall be placed on the spigot ends to assist in determining when proper seating depth has been
achieved within the joint.

10. Fittings
Unless otherwise specified, steel fittings, valves, and bolted connections shall be painted or coated as recommend-
ed by the manufacturer.

Fittings for nonpressure pipe shall be of the same or similar material as the pipe and shall provide the same dura-
bility, watertightness, and strength as the pipe unless otherwise specified.

11. Thrust blocks and anchors


When specified, concrete thrust blocks and anchors shall be installed as shown on the drawings or specified in sec-
tion 14 of this specification.

The concrete for the thrust blocks and anchors shall conform to the requirements of Construction Specification 32,
Structure Concrete, for Class 3000M concrete unless otherwise specified in section 14 of this specification.

The thrust block cavity shall be hand dug into undisturbed soil or previously placed compacted backfill. The cavity
shall be formed with soil or wood to hold the freshly placed concrete without displacement until an initial set has
occurred.

When excavation beyond the designated trench widths and depths as shown on the drawings or specified in section
14 of this specification occurs at locations where installation of concrete thrust blocks is required, the contrac-
tor shall install an alternative thrust block provision. The concrete thrust block shall have a thickness of one pipe
diameter and a contact face area that shall be formed against the pipe as shown on the drawings or specified in
section 14 of this specification. Backfill shall be placed on all sides of the thrust block and to the sides of the exca-
vation. It shall be compacted as specified for initial backfill.

12. Pressure testing


Method 1—Pressure testing of the completed conduit is not required.

Method 2—The conduit shall be tested for leaks in the following manner:
a. Before pressure testing:
(1) Joints of the assembled pipeline shall be allowed to cure as recommended by the manufacturer.
(2) Pipeline shall be flushed and cleaned.
(3) All concrete anchors and thrust blocks shall be in place and allowed to cure for a minimum of 3 days.
(4) Earth backfill shall be sufficient to anchor the conduit against movement during the pressure testing
and shall be compacted as specified in Section 14 of this specification or as shown on the drawings.

45–4 (210–VI–NEH, January 2009)


(5) The conduit shall be braced, anchored, or both, at each end to restrict all potential pipe movement.
(6) The ends of the conduit shall be plugged. The upstream plug shall have a standpipe installed vertically
having a minimum diameter of 2 inches and shall be equipped with a shutoff valve. All high points in
the line shall be vented to evacuate air pockets. The conduit and the standpipe shall be slowly filled
with water such that no air is entrapped during the filling operation. After filling is complete, all vents
shall be closed.
b. During pressure testing, the water level in the standpipe shall be continuously maintained at a minimum of
10 feet above the highest invert elevation of the conduit for no less than 2 hours unless otherwise specified
in section 14 of this specification or as shown on the drawings.
The volume of water leakage in the 2-hour test period shall be recorded. The maximum allowable leakage
(L) in gallons per hour shall not exceed 0.02 times the nominal pipe diameter (D) in inches for each 1,000
feet of pipe line, which is about 50 pipe joints (L = 0.02 x D).
c. When observed leakage exceeds the allowable, leaks shall be sealed by replacement of pipe and fittings
as necessary. The conduit shall be retested as described above. This procedure shall be repeated until the
conduit leakage does not exceed the allowable specified above.
The contractor shall be fully responsible for any and all work required to correct leakage exceeding the
amount specified.

Method 3—The conduit shall be tested for leaks in the following manner:
a. Before pressure testing:
(1) Joints of the assembled pipeline shall be allowed to cure as recommended by the manufacturer.
(2) Pipeline shall be flushed and cleaned.
(3) All concrete anchor and thrust blocks shall be in place and allowed to cure for at least 3 days.
(4) Earth backfill shall be sufficient to anchor the conduit against movement during the pressure testing
and compacted as specified in section 14 of this specification or as shown on the drawings.
(5) The conduit shall be braced and/or anchored at each end to prevent all potential pipe movement.
(6) The ends of the conduit shall be plugged, and a pressure gauge shall be attached to the upstream and
downstream ends. All high points along the pipeline shall be vented to permit the complete removal
of all air within the pipeline. The conduit shall be slowly filled with water such that no air is entrapped
during the filling operations.
b. The testing pressure specified in section 14 of this specification shall be continuously maintained at the
upstream gauge for a minimum of 2 hours. The pressure at the downstream gauge shall not exceed the pres-
sure rating of the pipe.
c. The volume of water leakage for the 2-hour test period shall be recorded. Maximum allowable leakage shall
be in accordance with the following:

(210–VI–NEH, January 2009) 45–5


                    Allowable leakage for plastic pipe
                 (gal/hr/1,000 feet, or 50 pipe joints) 1/

Nominal Test pressure in the pipeline (lb/in2)


pipe size 50 100 150 200
   (in) - - - - - - - - Allowable leakage - - - - - - -

4 .19 .27 .33 .38


6 .29 .41 .50 .57
8 .38 .54 .66 .76
10 .48 .68 .83 .96
12 .57 .81 .99 1.15
14 .67 .95 1.16 1.34
15 .72 1.02 1.25 1.44
16 .76 1.07 1.32 1.52
18 .86 1.22 1.49 1.72
1/ Computation basis
ND P
L=
7, 400

where:
L = allowable leakage in gallons per hour
N = number of joints (pipe and fittings)
D = nominal diameter of pipe in inches
P = test pressure in pounds per square inch

d. When observed leakage exceeds the allowable, leaks shall be sealed by replacement of pipe and fittings as
necessary. The conduit shall be retested as described in this section. The procedure shall be repeated until
the conduit leakage does not exceed the allowable specified above.
The contractor shall be fully responsible for any and all work required to correct leakage exceeding the
amount specified.

13. Measurement and payment


Method 1—For items of work for which specific unit prices are established in the contract, the quantity of each
kind, size, and class of pipe is determined to the nearest foot by measurement of the laid length along the crown
centerline of the conduit. Payment for each kind, size, and class of pipe is made at the contract unit price for that
kind, size, and class. Such payment constitutes full compensation for furnishing, transporting, and installing the
pipe including excavation, shoring, backfill, bedding, thrust blocks, and all fittings, appurtenances, and other items
necessary and incidental to the completion of the work. Payment for appurtenances listed separately in the bid
schedule is made at the contract prices for those items.

Method 2—For items of work for which specific unit prices are established in the contract, the quantity of each
kind, size, and class of pipe is determined as the sum of the nominal laying lengths of the sections used. Payment
for each kind, size, and class of pipe is made at the contract unit price for the kind, size, and class. Such payment
constitutes full compensation for furnishing, transporting, and installing the pipe including excavation, shoring,
backfill, bedding, thrust blocks, and all fittings, appurtenances, and other items necessary and incidental to the
completion of the work. Payment for appurtenances listed separately in the bid schedule is made at the contract
prices for those items.

45–6 (210–VI–NEH, January 2009)


Method 3—For items of work for which specific unit prices are established in the contract, the quantity of each
kind, size, and class of pipe is determined to the nearest foot by measurement of the laid length along the crown
centerline of the conduit. Payment for each kind, size, and class of pipe is made at the contract unit price for the
kind, size, and class. Such payment constitutes full compensation for furnishing, transporting, and installing the
pipe including shoring, all fittings, thrust blocks, appurtenances, and other items necessary and incidental to the
completion of the work. Payment for appurtenances listed separately in the bid schedule is made at the contract
prices for those items.

Method 4—For items of work for which specific unit prices are established in the contract, the quantity of each
kind, size, and class of pipe is determined as the sum of the nominal laying lengths of the pipe sections used. Pay-
ment for each kind, size, and class of pipe is made at the contract unit price for that kind, size, and class. Such
payment constitutes full compensation for furnishing, transporting, and installing the pipe including shoring, all
fittings, thrust blocks, appurtenances, and other items necessary and incidental to the completion of the work. Pay-
ment for appurtenances listed separately in the bid schedule is made at the contract prices for those items.

Methods 3 and 4—Excavation, backfill, and bedding is paid separately under their respective bid items.

All measurement and payment methods—Compensation for any items of work described in the contract, but
not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such
items and items to which they are made subsidiary are identified in section 14 of this specification.

14. Items of work and construction details

(210–VI–NEH, January 2009) 45–7


Chapter 2 National Standard Construction Part 642
Specifications National Engineering Handbook

45–8 (210-VI-NEH, January 2009)