MEDIDAS

No. PARTIDA UND No. Caras No. Veces Parc. TOTAL


LARGO ANCHO ALTURA

1.00 CONCRETO ARMADO


Concreto f'c = 28 Mpa 5.52
Buzones
BZ1 M3 1.00 1.00 AREA = 1.8225 1.37 2.50
M3 1.00 1.00 AREA = -1.1025 1.22 -1.35

BZ2 M3 1.00 1.00 AREA = 1.95 1.36 2.65


M3 1.00 1.00 AREA = -1.2 1.21 -1.45

BZ3 M3 1.00 1.00 AREA = 1.69 1 1.69


M3 1.00 1.00 AREA = -1 0.85 -0.85

BZ4 M3 1.00 1.00 AREA = 1.69 1 1.69


M3 1.00 1.00 AREA = -1 0.85 -0.85

BZ5 M3 1.00 1.00 AREA = 0.81 0.9 0.73


M3 1.00 1.00 AREA = -0.36 0.75 -0.27

BZ6 M3 1.00 1.00 AREA = 1.08 0.9 0.97


M3 1.00 1.00 AREA = -0.54 0.75 -0.41

BZ7 M3 1.00 1.00 AREA = 0.81 0.9 0.73


M3 1.00 1.00 AREA = -0.36 0.75 -0.27

Buzón de recuperacion de Aceite 0.82


Concreto f'c = 28 Mpa (Base 0.50)
Eje B-1 M3 1.00 1.00 AREA = 1.00 1.35 1.35
M3 1.00 1.00 AREA = -0.49 1.20 -0.59
Tapa M3 1.00 1.00 AREA = 0.72 0.08 0.06

Losa de Aproximación 4.07


Concreto f'c = 28 Mpa M3 1.00 1.00 AREA = 11.93 0.30 3.58
M3 1.00 1.00 AREA = 1.24 0.40 0.49

EJE DEL TRANSFORMADOR 25.52


Concreto f'c = 28 Mpa (Base 0.50) M3 1.00 1.00 AREA = 51.03 0.50 25.52

Muro Cortafuego 10.94


Concreto f'c = 28 Mpa (Base 0.50) M3 1.00 1.00 AREA = 1.35 7.60 10.26
M3 1.00 1.00 AREA = 0.13 5.40 0.68

Concreto f'c = 28 Mpa 13.72


Eje 1 entre C-F M3 1.00 1.00 AREA = 1.23 1.40 1.72
Eje C entre 1-3 M3 1.00 1.00 AREA = 0.76 1.40 1.07
Eje 3-C M3 1.00 1.00 AREA = 0.36 1.40 0.51
Eje 3-D M3 1.00 1.00 AREA = 4.53 1.75 7.94
Eje 3 entre E-F M3 1.00 1.00 AREA = 0.61 1.40 0.85
Eje F entre 1-3 M3 1.00 1.00 AREA = 0.69 1.40 0.97
Eje F entre 1-3' (medio) M3 1.00 1.00 AREA = 0.48 1.40 0.67

Zona eje del Transformador Medio 17.58


Eje 3-C M3 1.00 1.00 AREA = 0.73 1.40 1.02
Eje 2-C M3 1.00 1.00 AREA = 0.73 1.40 1.02
Eje E-C entre 2-3 M3 1.00 1.00 AREA = 11.10 1.40 15.54

Concreto segunda fase f'c = 28 Mpa


0.99
Cajuela para pernos de anclaje M3 1.00 4.00 AREA = 0.25 1.00 0.99

Concreto f'c = 21 Mpa (Según planos) 4.04


Ductos de 4 vias Tipo A M3 1.00 1.00 AREA = 0.18 12.20 2.20
AREA = -0.02 12.20 -0.19
AREA = -0.04 12.20 -0.43

Ductos de 4 vias Tipo B M3 1.00 1.00 AREA = 0.12 13.77 1.69


AREA = -0.03 13.77 -0.43

Ductos de 3 vias M3 1.00 1.00 AREA = 0.10 9.89 0.99


AREA = -0.02 9.89 -0.23

Ducto irregular M3 1.00 1.00 AREA = 0.68 0.67 0.46

2.00 SOLADOS
f'c = 10 Mpa e= 10 cm
74.23
Buzones (7 Buzones) M2 1.00 1.00 AREA = 9.8525 9.85
Recuperacion de Aceite M2 1.00 1.00 AREA = 1.35 1.35
Losa de Aproximación M2 1.00 1.00 AREA = 10.65 10.65
Eje del Transformador M2 1.00 1.00 AREA = 52.38 52.38