You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

PROVINCE OF BATANGAS
MUNICIPALITY OF SAN LUIS
OFFICE OF THE BUILDING OFFICIAL
AREA CODE____________

CERTIFICATE OF COMPLETION

THIS IS TO CERTIFY THAT THE CONSTRUCTION OF THE BUILDING COVERED BY BUILDING


PERMIT NO. ________________ ISSUED ON_________________________ HAS BEEN COMPLETED
IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATION ON FILE WITH THE OFFICE OF
THE BUILDING OFFICIAL OF THE “NATIONAL BUILDING CODE” (P.D. 1096).

THAT THE SAID BUILDING AND/OR STRUCTURE IS READY FOR FINAL INSPECTION FOR
THE ISSUANCE OF THE “ CERTIFICATE OF OCCUPANCY”.

NAME OF OWNER ______________________ __________________ _____________________


(LAST NAME) (GIVEN) (MIDDLE)
ADDRESS OF OWNER _________________________________________________________________
LOCATION OF CONSTRUCTION ________________________________________________________
USE OR TYPE OF OCCUPANCY _________________________________________________________
DATE OF START OF CONSTRUCTION:
PROPOSED _________________ ACTUAL _____________
DATE OF COMPLETION:
EXPECTED ________________________ ACTUAL ___________________
NO. OF STORIES ___________________________________ ACTUAL HEIGHT _________________
ESTIMATED COST ____________________________________________________________________
ACTUAL COST ________________________________ (FOR STATISTICAL PURPOSES ONLY)

a.) MATERIALS (TOTAL COST) _____________________________________________


1. CEMENT bags ____________________________
2. LUMBER ( cubic meter) ____________________________
3. REINFORCING BARS (kg) ____________________________
4. NO. OF G.I. SHEETS ____________________________
5 5. PRE-FAB STRUCTURAL STEEL (kg) ____________________________
6
7 b.) DIRECT LABOR ( TOTAL COST) __________________________________________
THIS INCLUDES CONPENSATION WHETHER BY SALARY OR CONTRACT FOR PROJECT
ARCHITECT/ENGINEER DOWN TO LABORERS.

c.) RENTAL OF EQUIPMENT (IF ANY) _____________________________________________

d) OTHER COSTS_____________________________________________________________________
THIS INCLUDES PROFESSIONAL SERVICE FEES, PERMITS AND OTHER FEES.

IF CONSTRUCTION IS UNDERTAKEN

________________________________________ ____________________________________
ARCHITECT/ CIVIL ENGINEER CONTRACTOR
(IN-CHARGE OF CONSTRUCTION) PRC REG. NO. _____________ CLASS ___________
TAN ________________ RES. CERT. _____________
CONFORME: ADDRESS ___________________________________
_____________________________________________

_____________________________________________________
OWNER/APPLICANT

You might also like