PART 1 – GENERAL
1.2 SUMMARY
1. Submittals.
2. Samples.
3. Record documents.
4. Maintenance manuals
5. Shop Drawings
6. Mechanical installations.
1.3 SUBMITTALS
A. General: The Contractor shall submit the submittals for all the
equipment and material to be installed at site in triplicate. After review
one copy shall be returned to the Contractor and 02 copies shall be
retained by the Consultants. The Contractor shall provide all the
informations in these submittals as required by the Consultants and
found necessary to review the product. No additional payment shall
be made for these submittals.
1.4 SAMPLES
A. General: The Contractor shall submit the samples for all the material
to be installed at site. After review rejected samples shall be returned
A. The Contractor shall prepare and furnish record documents of all the
equipment and material. These documents shall include installation
manual, operational instructions, technical literature, engineering data
and other informations related to the product being installed at site.
1. Ductwork mains and branches, size and location, for both exterior and
interior; locations of dampers and other control devices; filters, boxes,
and terminal units requiring periodic maintenance or repair.
10. Install access panel or doors where units are concealed behind
finished surfaces.