MANNAR WIND POWER PROJECT

AHEAD INSPECTION REQUEST LIST


Inspection Request List for 01-09-2019 Submitted to : Vestas Wind Sri Lanka Submitted On: 31-08-2019
Scheduled Date/Time
Involved Field Location
Contractor/ Responsible
S/N Ref/ no Sub Field Item description Remarks officer's name (contact)
Date 08.00-
Civil/Elec/Mech Zone Element 18.00 Hrs

QUALITY ASSUARANCE DISCIPLINE


MWPP-ACCSS-QUA- Access Eng/ Senthuran-
1 AE-RFI-QA-00407 Civil QA Site Laboratary ACC/MWPP/SOIL/SOURCE/SB/35 A, 35 B Inspection request for Soil Stockpile joint 01.09.2019 9.00 PLN-0001 Material Engineer
sampele testing. (077 257 98 95)

Inspection request for 7 Days cube MWPP-ACCSS-QUA- Access Eng/ Senthuran-


2 AE-RFI-QA-00408 Civil QA Batching Plant ACC/MWPP/CON/ACM/001 01.09.2019 10.00 PLN-0001 Material Engineer
compressive strength testing. (077 257 98 95)

MWPP-ACCSS-QUA- Access Eng/ Senthuran-


3 AE-RFI-QA-00409 Civil QA Batching Plant 30-37N/17.5/20/BS/MWPINS Inspection request for 21 Days cube 01.09.2019 16.00 PLN-0001 Material Engineer
(Trial Mix No. 18) compressive strength testing. (077 257 98 95)

MWPP-ACCSS-QUA-
4 AE-RFI-QA-00410 Civil QA WTG 20 - Soil Stockpile ACC/MWPP/SOIL/SOURCE/011 Inspection request for Soil Stockpile joint 01.09.2019 11.00 PLN-0001 Access Eng/ Ajith-SME
sample collection. (077 364 5823)