You are on page 1of 4

MANNAR WIND POWER PROJECT

DAY AHEAD REQUEST FOR INSPECTION LIST


Inspection Request List for 03-07-2019
Submitted to : CEB Submitted On: 02-07-2019
Involved Scheduled Date/Time
Location (08.00-18.00 Hrs) BoP Contractor/
Vestas Field
S/N Sub Field Item description Contractor Remarks Responsible officer's
Reference Civil/Elec/ Reference name (contact)
Mech Zone Element Date Time

MWPP-
Inspection request for ACCSS-CIV- Access Eng./ Ajith-
1
MWPP-VES-
Civil GT WTG 22 Turbine Access temporary road 03.07.2019 8.30
AE-RFI-GT- PRD-0005 Technical Officer
CIV-RFI-741 Foundation Road construction for machine 00404 /MWPP-
mobilization. ACCSS-CIV- (0774117006)
PRD-0003

MWPP-
WTG 31 ACCSS-CIV- Access Eng/
2
MWPP-VES-
Civil GT WTG 31 Hardstand Area Inspection request for 03.07.2019 8.30
AE-RFI-GT- PRD-0005 Supervisor
CIV-RFI-742 Foundation Clearing and Grubbing 00405 /MWPP- Rathnaweera
ACCSS-CIV- (0764165176)
PRD-0003
MWPP-
ACCSS-CIV-
PRD-0005 Access Eng./ Ajith-
3
MWPP-VES-
Civil GT Main Access 08+520-8+440 Inspection request for Field 03.07.2019 15.00
AE-RFI-GT- /MWPP- Technical Officer
CIV-RFI-743 Road Density Test for Subgrade. 00406 ACCSS-CIV-
PRD-0002 (0774117006)

MWPP-
ACCSS-CIV-
PRD-0005 Access Eng./ Ajith-
MWPP-VES- Main Access Inspection request for Field AE-RFI-GT- /MWPP- Technical Officer
4
CIV-RFI-744 Civil GT Road 09+570-09+650 Density Test for Subgrade. 03.07.2019 14.00
00407 ACCSS-CIV-
PRD-0002 (0774117006)

MWPP- Access Eng/


WTG ACCSS-CIV-
5
MWPP-VES-
CIV-RFI-745 Civil GT Foundations WTG 12-1 Hard Inspection request for Earth 03.07.2019
stand areas Resistivity Test
8.30
AE-RFI-GT- PRD-0006
00408
Priyankara-QA/QC
Manager
12-1 (0769068213)
MANNAR WIND POWER PROJECT

DAY AHEAD REQUEST FOR INSPECTION LIST


Inspection Request List for 03-07-2019
Submitted to : CEB Submitted On: 02-07-2019
Involved Scheduled Date/Time
Location (08.00-18.00 Hrs) BoP Contractor/
Vestas Field
S/N Sub Field Item description Contractor Remarks Responsible officer's
Reference Civil/Elec/ Reference name (contact)
Mech Zone Element Date Time
MWPP-
ACCSS-CIV-
WTG PRD-0005 Access Eng/
WTG
6
MWPP-VES-
Civil GT Foundations 13,08,07,06 Inspection request for DCP 03.07.2019 11.00
AE-RFI-GT- /MWPP- Priyankara-QA/QC
CIV-RFI-746
13,08,07,06 Hard stand Test. 00409 ACCSS-CIV- Manager
areas PRD-0002 (0769068213)

MWPP-
ACCSS-CIV-
Inspection request for PRD-0005 Access Eng/ Nirmal-
7
MWPP-VES-
Civil GT Thoddaveli Accomodation accomodation area 03.07.2019 12.30
AE-RFI-GT- /MWPP- Site Engineer
CIV-RFI-747 Area demarcated tree removing. 00410 ACCSS-CIV- (0774999960)
PRD-0002

Inspection request for


Continuation of Contour MWPP- Access Eng./
MWPP-VES- WTG 12 WTG 12 Surveying WTG 12 AE-RFI-SU-
8
CIV-RFI-748 Civil SU Foundation Hardstand Area Hardstand Area and the 03.07.2019 8.30
00211 ACCSS-CIV- Kingston-Surveyor
nearby area upto the Main PRD-0003 (0760883025)
Access Road Frontage

Inspection request for


Commencement of contour
WTG 10 WTG 10 Surveying WTG 10 AE-RFI-SU- MWPP- Access Eng./
MWPP-VES-
9
CIV-RFI-749 Civil SU Foundation Hardstand Area Hardstand Area and the 03.07.2019 14.30
00212 ACCSS-CIV- Kingston-Surveyor
PRD-0003 (0760883025)
nearby area upto the Main
Access Road Frontage
MANNAR WIND POWER PROJECT

DAY AHEAD REQUEST FOR INSPECTION LIST


Inspection Request List for 03-07-2019
Submitted to : CEB Submitted On: 02-07-2019
Involved Scheduled Date/Time
Location (08.00-18.00 Hrs) BoP Contractor/
Vestas Field
S/N Sub Field Item description Contractor Remarks Responsible officer's
Reference Civil/Elec/ Reference name (contact)
Mech Zone Element Date Time
MWPP- Access Eng/
10
MWPP-VES-
Civil QA Pudukuduirup Batching Plant Inspection request for 21
Day Cube Crushing for Trial 03.07.2019 15.00
ACCSS-QUA-
AE-RFI-QA- PLN-0001 Chathuranga
CIV-RFI-750 pu MIX 4. 00137 Lab Incarge
(077 7410621)

Inspection request for


Stockpile joint Sample MWPP-
testing (Samples B,C & D) ACCSS-QUA- Access Eng/
MWPP-VES-
Civil QA Pudukuduirup Site Laboratory 1. AE-RFI-QA- PLN-0001 Senthuran-Material
ACC/MWPP/SOIL/SOURCE/ 03.07.2019
11 9.30
CIV-RFI-751 pu 00138 Engineer
011 (077 257 98 95)
2.ACC/MWPP/SOIL/SOURC
E/011-A

Inspection request for MWPP-


Specific gravity and water Access Eng/
Pudukuduirup absorption test AE-RFI-QA- ACCSS-QUA- Senthuran-Material
MWPP-VES-
12
CIV-RFI-752 Civil QA pu Site Laboratory 1. 03.07.2019 14.00
00139 PLN-0001 Engineer
ACC/MWPP/Source/QD/00 (077 257 98 95)
1
MWPP-
Access Eng/
MWPP-VES- Thoddaveli & Inspection request for soil AE-RFI-QA- ACCSS-QUA- Senthuran-Material
13
CIV-RFI-753 Civil QA N/A Naddukkuda stock pile joint 03.07.2019 9.00
00140 PLN-0001 Engineer
measurement. (077 257 98 95)
MANNAR WIND POWER PROJECT

DAY AHEAD REQUEST FOR INSPECTION LIST


Inspection Request List for 03-07-2019
Submitted to : CEB Submitted On: 02-07-2019
Involved Scheduled Date/Time
Location (08.00-18.00 Hrs) BoP Contractor/
Vestas Field
S/N Sub Field Item description Contractor Remarks Responsible officer's
Reference Civil/Elec/ Reference name (contact)
Mech Zone Element Date Time

Inspection Request for Trial MWPP-


Mix no 11. (C40/50) ACCSS-QUA- Access Eng/
14
MWPP-VES-
Civil QA Pudukuduirup Batching Plant Tokyo(PPC) - Castech LRPS 03.07.2019 14.00
AE-RFI-QA- PLN-0001 Senthuran-Material
CIV-RFI-754 pu 2000S 00141 Engineer
40- (077 257 98 95)
50N/17.5/20/BS/MWTKS3

Special Notes : Please be noted if any changes in the timing of inspection will be intimated in advance.