a pr intake con inst damage by waves
with rip-rap to protect the intake conduit again ein
ele. ‘The Sp of the erftie covered with cast iron or mesh grating.
Canal Intake
Sometimes, the source of water supply to a saa wn big
be an irrigation canal passing near the town. The canal intake
shown in Fig, 3.24. It essentially consists of concrete or masonry
intake chamber of rectangular shape, admitting water through a coarse
INTAKE
CHAMBER
PZTTIITTTT
FIG. 3.24. CANAL INTAKE —
screen. A fine screen is provided over the bell 1 pees the
outlet pipe. The bell mouth entry is located the expected
Jow water level in the canal. Water may flow from | Pipe under
gravity if the filter house is situated at a lower el he
the outlet pipe may serve as suction pipe, and pump house
may be located on or near the canal bank. The intake
is So constructed that it does not offer any appre
fo normal flow in the canal. Otherwise, the intake chan
inside the canal bank. Near the location of the intake
canal is lined.
Example 3.5. Design of a canal Intake
_ Design a bell mouth canal intake for a city of 800
drawing water from a canal which runs for 10 hours a da
depth of 1.8 m. Also calculate the head loss in the inta
f the treatment works are 3 km away. Draw a neat skete
canal intake. Assume average consumption per person = 1304
the velocity through the screens and bell mouth (0 .
16 cms and 32 cm/s respectively, 2
Scanned with CamScannera WATER SUPPLY Ey
NER,
Ns
Solution.
1, Discharge through intake
Daily discharge 150 80000 = 12000000 / day,
Since the canal runs only for 10 hours Per day,
Intake toadmour = 120 6 290600 he
= 1200 m'/hr
‘ 1200
a 2 mx 00
2. Area of coarse screen in front of intake
Area of sereen, Ay = 2 = 97333 = 2.083 m?
= 0.3333 m/sec.
the area occupied by solid bars be 30% of the tor) ate,
ual area of screens = 2.083/0.7 = 2.98 m°
é minimum water level at 0.3 m below norm,
t us keep bottom of screen at 0.2 m ad,
screen at the minimum water level.
of screen= 1.8-03-02=13 m