Basic Plant Data

Pyro Section
WiZi Rev.0 17.05.2008

Purpose: to collect basic plant data for inclusion into ATEC database

Project No.: ASA-06-01-ph-s


Project Assuit - CEMEX - Egypt
Date: 5/17/2008
Kiln Line: 1
Remarks:
- all GREEN cells are for input of actual data
- all GREY cells are for information
- all YELLOW cells are indication guide lines or limits
- all BLUE cells are showing maincalculation results

- red numbers = changed data from base program


- red Fat numbers = data shown are given by client

- input of data to be done on "Input & Output" sheet only


database
Project No.: ASA-06-01-ph-s
Project Assuit - CEMEX - Egypt
Date: 5/17/2008
Kiln Line: 1

Plant Location
level above sea ambient rel. humidity
[m] [ °C ]
temperatu [%]
re
mean mean
0

Preheater Feed Preheater String - Calciner Type


pneumatic = 1 A-string B-string 0 = none
ket elevator + belt weigher = 2 1 = secondary burner
ket elevator + rotary scale = 3 2 = AT-calciner
3 = AT-calciner w. tertiary air
Preheater Type 4 = AS-calciner
No. of preheater stages 5 = seperate line calciner
No. of preheater strings

Clinker Cooler Type Kiln Dimensions


walking beam cooler = 1 Length [m]
grate cooler = 2 Diameter [m]
satelite cooler = 3 Lining [m]
other cooler = 4 Inclination [%]

Fuel Utilised
Quantity [t/h] Hu
fuels (as fired) kiln calciner chamber [kcal / kgfuel]
coal
pet coke
oil
gas

Preheater Fan
pressure volume speed power
[Pa] [Am³/h] [rpm] [kW]
design                        
actual

Kiln Operation
speed power
[rpm] [kW]
design            
actual

Pyro-Section History
Original Supply Modification
Year Supplier Capacity Year Supplier Comments
Preheater
Calciner
Kiln
Cooler
Bypass
ID-Fan

Comments
Project No.: ASA-06-01-ph-s
Project Assuit - CEMEX - Egypt
Date: 5/17/2008
Kiln Line: 1

rev. No Date Revised Sheets Revision Comment


0 5/17/2008 all new form
1