QZJ5KT-1 Adjustable Brick Laying

Manchine

Using Direction

-2-
海德机械

ShanDong Boxing Haide Machinery CO.,LTD

Contents

1 Technical number………….…………………4
2 Working principle……………………………6
3 Technical data…………………...……………7
4 Installation……………………………………11
5 Commissioning & operation…………………13
6 Maintenance…………………..………………14
7 Lubrication………………...…………………15
8 Trouble shooting…………...…………………16
9 Drawings…………………...…………………17

-3-
海德机械

1 Technical number

Section Type Technical No.


QZJ5KT-1
Brick Laying Manchine

2 Working principle

2.1 The equipment is composed of the rack, rack-run parts,

adjustable arc frame, cylinder and the pneumatic and hydraulic

-4-
海德机械

top-bar parts and guide pulley parts (see the assembly graph of

the machine structure ).

2.2 The machine is working as a driving force to compressed air,

compressed air works through the triad oil-water separator parts

and take-off and landing controlling switch of cylinder into the

cylinder, under the control of the take-off and landing controlling

switch, it asks to complete the moving to top place and returning

movements of the cylinder block.

2.3 The machine with a pressure protection device (built-in

reservoir pressure), can maintain a short period of time, so that

gas pressure does not decrease after gas source is stopped .

-5-
海德机械

3 Technical data

Model Dimension Work Work journey Pump


pressure journey
QZJ5KT-1 4200×4330×373 0.4-0.6Mpa 3500mm 160mm
0
Pneumatic hydraulic pump

Model Work pressure Flux Noises Weight

Patg1102 0.4-0.6Mpa 60cu.in/min 76dBA 8.2Kg

hydraulic pump

Journey Work pressure

256mm 0-30Mpa

-6-
海德机械

4 Installation
4.1 Before assembling the machine ,the inferior partial rotary

kiln where fire-proof brick need to be laid should be laid in with fire-

proof brick for the location of assembling the machine. (The length

of 4 meters).

4.2 Please install inclined leg (No. 8) into mouth of rack inclined

tube on the location of graph.

-7-
海德机械

-8-
海德机械

4.3 Please install the arm (No. 6) into mouth of the rack

horizontal pipe, and insert the pin on the location of graph,

respectively.

4.4 Please connect the beam (No. 4) and rack (No. 7) with

pins fixing ,and then connect horizontal bar (No. 5).

-9-
海德机械

4.5 Install guide rail (No. 1) and arm (No. 6) with M20 bolts

fixing.

4.6 Respectively, install the inclined tube (No. 9, 10) and adjust

the height and width, so that the force are tightened at both ends .

4.7 By sketch, respectively, install middle-tube (No. 3) and the

side-tube (No. 2).

4.8、Respectively, pull out the side-tube (No. 2) ,insert the facing

bolt into Guide rail (No. 1) hole, with plug fixed from the outside.

4.9、Pull out the ladder from one end of the Guide (No. 1) ,and

set up the escalator (No. 19).

- 10 -
海德机械

4.10 Add the grid net of step (No. 16), and add the block on both

sides.

4.11 Install the guide pulley (No. 8), which be fixed in one end

board of the guide (No. 8) .

4.12 Connect arc frame (No. 15)and install arc frame parts, then

adjust the arc to the actual usable size with adjustment bolt parts.

- 11 -
海德机械

4.13 Connect the right and left arc seat of the arc frame (No.

15) with pulley (No. 17) .

14、set up a tripod (No. 18) and good arc frame ,then connect

them with pin.

4.15 Install the pneumatic and hydraulic top-bar parts (No.

13).

4.16 install fence at both ends (No. 11), pedal-frame(No. 12)

and the pedal.

- 12 -
海德机械

5 Commissioning and operation


5.1、First of all ,connect to gas source, begin to work when the

air pressure gets to rated pressure (0.4-0.6 MPa) .

5.2、Followed by , push the fire-proof brick to top place, vacate

the seam part at the middle where fire-proof brick should be

withstand with seam Jack from interior to both sides , confirm that

has got to request (hydraulic table instructions 30 MPa), followed

by , move the block take-off and landing switch on the arc frame,

so that the top block can be all reset under the effect of pneumatic

pressure.

5.3、In the course of laying, should move arc pulley so that the

behind block have a same location with the original pushed fire-

proof brick, at this time, move the block take-off and landing linked

switch on behind both sides, so that the block after both sides on

arc frame withstand fire-proof brick, after confirming the block on

behind both sides all pushed to top place, release the pressure

relief switch on pneumatic hydraulic pump, take down the seam

Jack, vacate a position, and then lay and reinforce with the five

middle pneumatic pump on the arc frame .

After confirming the fire-proof brick pushed to the top place

- 13 -
海德机械

has been reinforced, move the block take-off and landing linked

switch so that the block on the arc frame can be all reset under the

effect of pneumatic pressure. In the above work, the work in front

by the second note cycle can be.

5.4、The equipment should be adjusted according to the kiln

diameter, the flexible length of inclined leg can be adjusted in

longitude and of the beam can be adjusted in latitude. Arc

diameter can be adjusted according to the adjustable bolt parts.

The data details are on debugging graph.

5.5 、 Pneumatic hydraulic pump pressure of work is 15 ~ 30

MPa

6 Maintenance

6.1 、 Before every class work, please inspect and fasten

connecting parts and fasteners of the equipment.

- 14 -
海德机械

6.2、Position of oil-water separator is inspected once for every

class work. Oil-position is lower than the rated requirements, in

timely, to add the lubricants (sewing machine oil)

6.3、After using equipment, please take down it according to

the installation sequence by reverse, than clean up dirt and pack in

chest.

- 15 -
海德机械

7 Lubrication
Table.3 Lubrication Schedule for K4

Technical No.:

Equipment Name : Roots blower                  

Part No. of Lubricant Name Filling Initial Supplement Supplement Replacement period
Item Remark
Description Point(s) Summer Winter Method. Filling period Quantity Initial Standard
season season              
B r i c k L a y i n g
1 Machine 1 ISOVG32 ISOVG32 Oil gun 50ml 2days 50ml  

                     

                     

                     

- 16 -
海德机械

8 Trouble shooting

Lack top power of Check whether gas source

pneumatic pump, or no has pressure and the pipe


1
action joints leak or no, and then

dispose in timely.

Lack top power of Check whether the

hydraulic jack、no pneumatic pump works and

action or oil spilling air pump is the lack of

2 hydraulic oil or no, if it’s

lack, please add timely, if

the oil spill, should replace

the seals.

NOTES:

1. Do not confirm whether the seam jack has tight withstand

the both sides of fire-proof brick, making the linked take-off and

landing block reset is forbidden.

2. Working pressure of Pneumatic hydraulic pump should be no

larger than 40 MPa.

3. The machine has manual pumps, which is prepared to use

when gas is stopped in short period of time.

- 17 -
海德机械

4. Enduring weight of the rack should be no larger than three tons.

9 Drawings

Drawing list