4. Installation .................................................. 3
6. Usage .......................................................... 8
2. Structure Description
3. Performance Parameter
2
Consume Power: 770KW
Rotor speed: 3560 r/min
Motor:HGF8006,1000kW-2P/60Hz/4000V
4. Installation
4.4 Cut down canal possibly, use sluice gate and bend as few as
possible to decrease the pressure loss. All erection joints should be
compactly to ensure there is none gas escaped. Among all the parallel
connection fans through the main blast line should not have
phenomenon of mutual float.
3
4.6 Adopt corresponding grade explosion protection according to
specific situation toward to the assorted motor, install the current
protection in case of the breakage of motor caused by electric current
oversize in variable working condition or blower in trouble.
4
5. Trial Running
locking.
(2) Check whether the blower inlet pipe is clean, the pipeline will
(4) Set emergency stop push button on the spot to confirm its
function normally.
(5) Check whether oil leveler of the lube unit is appropriate, the
oil leveler not exceed "the maximum oil leveler", also not be less than
the "minimum oil leveler"; Check the conjunctive situation of lube unit,
the blower bearings and overhead lube pipe, to ensure the lubricating
also the lubricating oil can be smoothly returned to lube unit; Check
whether the line is properly connected that between the lube unit, the
instrument panel and electrical control cabinet; Check whether the lube
5
no-load test on the motor to check whether the motor’s turning is in
shooting.
(3) First start the lube unit to observe whether the lubricating oil is
successive and sufficiency to bearing parts and overhead lube, also the
instruments panel. Normal oil temperature (refer to lube unit work, the
the tank to improve the oil temperature, when the highest oil
(5) Start the motor, and observe whether the blower’s turning is
(6) When the blower starting and running, the people is not
6
allowed to stand near the impeller’s radial position and the coupling.
rated speed, gradually open the valve on the inlet pipe (to observe the
motor running current must not exceed the motor rated current in this
process), shut down to check whether the bearings and other parts of
the park has no problem after run 1 to 2 hours at rated load, then
down first, until the main shaft stops rotating, and then close the lube
unit.
(1) Blower:
exceed 75 ℃;
4mm / s.
7
0.07MPa, shut down when less than 0.05MPa;
The oil temperature of the lube unit export does not allow higher
than 50 ℃.
one of the above condition should be taken an emergency stop, cut off
the motor power (do not close the guide vane controller), so that the
6. Usage
6.1 The blower needs a air input test before it uses. Testing
sequence can be carried on according to the sixth party clause. After
the test is successful, the blower can be used to the running.
8
7. Maintenance and Repair
8.1 Replace lubricating oil when the new blower running 100 hours for
the first time, maintain every six months, overhaul once a year.
8.2 Maintenance can release the bolt of horizontal split. Open the
casing and bearing housing, take out the rotor before maintenance.
Make a point of checking the rivets of impeller not loose and welding
no crack.
9
pressure 3. Big internal loss blockage leakage loss
4. Faulty adjust, be out of 3. Change seal components
harmony with air delivery 4. Adjust the valve
system properly, reform air delivery
5. Coal gas density under system
rating value 5. Change blower of high
6. Shaft reversing pressure
6. Correction direction of
rotation
1. low voltage and big air 1. Adjust the voltage, turn
volume down the valve
2. Shaft reversing 2. Correction direction of
Overtop 3. Blower vibration rotation
4. Impurity in anti-friction 3. According to the method
temperature rise of
material of solve vibration
bearing 5. Shortage in water 4. Change the anti-friction
coolant material
5.Rise quantity of the
water coolant
10