Professional Documents
Culture Documents
RP3010@BASEMENT
CIRCUIT INSTRUMENT USED: SANWA MODEL: 1008S, INSULATION TESTER SIZE
BREAKER LINE TO GROUND LINE TO LINE OF CONDUCTOR REMARKS
RATING L1 L2 L3 L1-L2 L1-L3 L2-L3 L1 L2 L3
CB AHU Basement was Energised
200 Amps. 400MΩ 500MΩ 350MΩ 1000MΩ 900MΩ 1000MΩ 2\0 2\0 2\0 on March 18, 2014 at around
RP3010 MCM MCM MCM 1045 hrs. CB-Normal Temp.
Fire Pump@BASEMENT
CIRCUIT INSTRUMENT USED: SANWA MODEL: 1008S, INSULATION TESTER SIZE
BREAKER LINE TO GROUND LINE TO LINE OF CONDUCTOR REMARKS
RATING L1 L2 L3 L1-L2 L1-L3 L2-L3 L1 L2 L3
BR4 Fire Pump energized
200 Amps. 500MΩ 500MΩ 500MΩ 1000MΩ 1000MΩ 1000MΩ 2\0 2\0 2\0 on March 18, 2014 at around
F. PUMP MCM MCM MCM 1045 hrs. CB-Normal Temp.
Sewage Pump@BASEMENT
CIRCUIT INSTRUMENT USED: SANWA MODEL: 1008S, INSULATION TESTER SIZE
BREAKER LINE TO GROUND LINE TO LINE OF CONDUCTOR REMARKS
RATING L1 L2 L3 L1-L2 L1-L3 L2-L3 L1 L2 L3
BR5 Sewage Pump energized
50A 160MΩ 180A 180A 140MΩ 150MΩ 140MΩ 8 8 8 on March 18, 2014 at around
Sew.Pump AWG AWG AWG 1145 hrs. CB-Normal Temp.
Sump Pump@BASEMENT
CIRCUIT INSTRUMENT USED: SANWA MODEL: 1008S, INSULATION TESTER SIZE
BREAKER LINE TO GROUND LINE TO LINE OF CONDUCTOR REMARKS
RATING L1 L2 L3 L1-L2 L1-L3 L2-L3 L1 L2 L3
BR6 Sump Pump energized
50A 160MΩ 180A 180A 140MΩ 150MΩ 140MΩ 8 8 8 on March 18, 2014 at around
SumpPump AWG AWG AWG 1300 hrs. CB-Normal Temp.
EPB at BASEMENT
CIRCUIT INSTRUMENT USED: SANWA MODEL: 1008S, INSULATION TESTER SIZE
BREAKER LINE TO GROUND LINE TO LINE OF CONDUCTOR REMARKS
RATING L1G L2G LL L L
CB The EDPB Panel was energized
50A 160MΩ 180A 140MΩ 10 10 on March21, 2014 1200 hrs.
MAIN AWG AWG CB-Normal Temp.
CB1 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB2 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB3 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB4 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB5 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB6 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB7 The EDPB Panel was energized
20A 300MΩ 300MΩ 300MΩ 12 12 on March21, 2014 1200 hrs.
LTS AWG AWG CB-Normal Temp.
CB8
20A
SPARE
TEST CERTIFIED BY:
BERNARDO M. TERROBIAS
PEE 2778 UNTIL 8/202015
PTR 2562669 ISSUED ON
1/13/2014 AT MANILA