ORACLE ERP CLOUD IMPLEMENTATION

PT Indonesia Power

Date : 13 April 2021


Ref No : MII-OPTY-035671

Prepared By PT Metrodata Electronics, Tbk Team Strictly Confidential ©PT Metrodata


Strictly Confidential ©PT MetrodataElectronics,
Electronics, Tbk. Tbk.
2021 2021
TABLE OF CONTENTS
• Proposal Terms

• Proposal Summary

• Proposed Solutions

• Project Management

• Investment

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Proposal Terms
Segmentation
• This proposal contains solution of Oracle Fusion Cloud Implementation for PT Indonesia Power (IP)

Disclaimer & Confidentiality Statement


• The material contained in this proposal represents proprietary, confidential information pertaining to PT Metrodata
Electronics, Tbk. (ME) implementation and methods. By accepting this proposal, IP here by agrees that the
information in this proposal shall not be disclosed outside of IP and shall not be duplicated, used, or disclosed for any
purpose other than to evaluate this proposal.
• If, however, a contract is awarded to ME for this proposal as a result of, or in conjunction with, the submission of this
information, IP will have the right to duplicate, use or disclose the material contained here in to the extent provided
for in the resulting contract.

Proposal Accountability
• Kindly note to not accept any investment / pricing numbers written in this proposal as final. The investment or
pricing number provided in this proposal ARE NOT intended to represent exact investment for IP. ME will requires
further assessments in order to obtain exact and accountable investment number.

Proposal Validity
This Proposal valid until 1 (one) month from proposal date

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Proposal Summary

... PT INDONESIA POWER (IP) would like to implement PSAK 73 for their lease assets …

… PT Metrodata Electronics, Tbk (ME) as an Oracle Platinum Partner would like to present this proposal for Oracle Fusion
Cloud. This document provides a quick walkthrough of Oracle Fusion Cloud Implementation that includes product features,
high level scope , timelines , assumptions & dependencies with focus on PSAK 72 Solution…

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Proposed
Solutions

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Oracle’s Industry Footprint and Proposed Module
Proposed Architecture

Sales & Product Management Order Management Supply Chain Execution Transportation
Service Development & Product Order Price & Supply Inventory Warehouse Base Fleet
Innovation Hub Capture Promotion Orchestration (Rec, Ship)
Customer Management
DM
Order Manufacturing & Operational
Quality Management Backlog Cost Mgt
Services Orchestration Maintenance Planning

Procurement Self-service Supply Planning Enterprise Resources Planning Financial AR Self-service

Supplier Production Financials (AP, Assets, GL,


Purchasing Contract Sourcing Forecasting MRP Collection Projects
Portal Scheduling Reporting)

Emerging Technologies (IoT Intelligent Applications, Digital Assistants)

Platform (Extension, Integration, Security) & Infrastructure

Analytics

: Proposed Module

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Proposed Solution Overview
Purchase Order
(EBS)

• Lease Asset Detail

Fixed Asset Accounts Payable


(Fusion Cloud) • Create Lease Asset Invoice (EBS)

• Lease Asset Addition • AP Journal


• Lease Asset Amortization
• Lease Asset Adjustment

General Ledger General Ledger


(Fusion Cloud) • Lease Asset Journal (EBS)

: Oracle Fusion Cloud


: Oracle EBS

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Streamline Asset Management
General
Projects
Ledger

Lease information
Amortization schedule
Purchase Fixed Lease
Invoice Lease interest
Order Assets Asset Lease Depreciation
Lease invoice

Adjust Transfer Revalue Depreciate Retire

Revaluation Rules
Cost Full Revaluation Life-Based Full
Asset Life Partial Accounts Flat Rate Partial Cost
Depreciation Method Current-Period Revalue in a Book Units of production Partial Unit
Depreciation Rate Retroactive Revalue in a Diminishing Value Current-Period
Salvage Value Category Bonus Rules Retroactive
Rule Revalue Individually

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Lease Asset Management (IFRS 16/PSAK 73)

Capture
lease information

Generate
Payables amortization schedule

Calculate
Lease lease interest
Terms
Calculate depreciation
Lease Assets
Contract
Create accounting
General Ledger
Generate
lease invoices

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Financial Reporting Studio, Smart View & OTBI
Payables
Board Quality
Financial Statement
Receivables
Connected
Posting Spreadsheet Analysis
Assets (230M / Hr)
Real-time Operational
Reporting
Inventory
General Ledger

Real Time Multi-Dimensional


Others
Balances as Single Source of Truth

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Project
Management

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Metrodata Offerings and Scope of Works
Scope Description
Module • Financial : General Ledger, Fixed Assets

Number of Legal Entity Up to 1 LE

Number of Ledger Up to 1 Ledger

Number of Operating Unit Up to 1 Operating Unit


Up to 1 Asset Book : Corporate Book
Number of Asset Books
Only manage lease asset. Other Asset will still managed on Oracle EBS
Number of Customization Reports Up to 5 Reports

Number of Customization / Enhancement No Customization


1. Integration from Purchase Order EBS to Fixed Assets Fusion Cloud (Lease Asset Detail)
Number of Integrations 2. Integration from Payables Fusion Cloud to Payables EBS (Lease Asset Invoice)
3. Integration from General Ledger Fusion Cloud to General Ledger EBS (Lease Asset Journals)
Onsite and Off Site Approach
Onsite Location :
Project Location Kantor Pusatindonesia Power
Jl. Gatot Subroto No.Kav.18, RT.5/RW.4, Kuningan Tim., Kecamatan Setiabudi, Kota Jakarta Selatan,
Daerah Khusus Ibukota Jakarta 12950

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Implementation Methodology
The goal is to gain concurrence among all The goal is to configure the system as user The goal is to assist client’s operation and support
stakeholders on the lifecycle objectives for the requirement of the newly developed system
project

Initiation Definition Execution & Launch Support


Application

The goal is to identify project scope and high-level The goal is to prepare the final process of system
requirement during initiation into more detail launching to production

Key Activities ▪ Contract Agreement and ▪ Configuration Review ▪ Perform Configuration and ▪ Support End User Training ▪ Go Live
Project Charter Sign Off ▪ Development System Testing (EUT) ▪ Perform Go Live support
▪ Prepare Project Facility & Preparation ▪ Develop Customization ▪ Production system ▪ Submit project documents
Infrastructure ▪ Future Process Model ▪ Perform Conference Room Pilot preparation ▪ Project handover and
▪ Mobilize Project Team (FPM) Review (CRP) ▪ Conduct data migration closing
▪ Project Kick Off ▪ Additional Indonesian ▪ Perform System Integration ▪ Go Live confirmation
Localization (Tax) Test (SIT)
▪ Define Customization ▪ Conduct User Acceptance Test
Design (UAT)
▪ Migration Strategy Finalization
Key Deliverables ▪ Contract Agreement ▪ Future Process Model ▪ CRP Scenario Script ▪ User Manual by Key User ▪ Application Setup
▪ Project Charter (FPM) Document ▪ SIT Scenario Script ▪ Data Conversion Document
▪ Kick Off Meeting ▪ Customization Design Sign ▪ UAT Scenario Script ▪ Production system ready ▪ Customization Design
Presentation Off ▪ Migration Strategy ▪ Go Live Check List Document
▪ Development System Document
Ready

Project Management, Change Management, and Infrastructure

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Project Timeline
M1 M2 M3 M4

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16

Initiate

Definition

Execution & Application

Launch

Go Live Support

Kick off Meeting Go Live

Note:
• Implementation : 3 Months
• Go Live Support : 1 Months

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Project Structure
Steering
Committee (SC)

Notes:
Project Manager
(PM) ▪ Red: IP
▪ Blue: ME
Change ▪ Green: IP and ME
Management
(CM)

FINANCIALS
MASTER DATA TECHNICAL
(GL, FA, AP)

Business Process Master Data Technical


Owner (BPO) (MD) Consultant (TC)

Functional
Developer (DEV)
Consultant (FC)

Database
Key User (KU) Administrator
(DBA)

Hardware &
End User (EU)
Network (HN)

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Communication Strategy
Type Purposes Frequency

Kick Off Meeting • Official announcement of project “Go Ahead” to Oracle project team
• Communicate project approach, plan, & direction to the project team
• Steering Committee Members One Time
• Project Managers • To secure Oracle project team member’s commitment to the project
• Project Team Members • To introduce project team members

Steering Committee Meeting • To understand and discuss overall project progress and direction
• Approval of critical deliverables Monthly /
• Steering Committee Members • Discuss escalated project issues Ad Hoc
• Project Managers • Review project changes in scope and budget

Progress Status Meeting • Discuss weekly progress of respective areas


• Plan for next week activities Weekly
• Project Managers
• Project Team Members • Discuss project risks/issues identified

Other Meeting
Over the lifetime of the project there may be a requirement for review meeting and will be
Ad Hoc
arranged as and when required.
Depend on meeting purposes

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Training Strategy
Phase Definition Execution & Application Launch
Training Overview Training Technical Training Conference Room User Acceptance Test End User Training
Pilot (CRP) (UAT) (EUT)

Environment Test Instance Test Instance Test Instance Test Instance Test Instance

Type Demo Demo Demo Demo Hands On


Hands On Hands On (*) Hands On

Material Overview Training PPT Technical Training PPT FPM Process FPM Process FPM Process
CRP Script UAT Script User Manual

Trainer Consultant Consultant Consultant Consultant Key User

Audience BPO Developer BPO Key User End User


Key User DBA Key User

Facilitator PM PM PM PM Key User

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Data Migration – Master Data
Execution and
Required Master Data Definition Launch
Application
Chart of Account : COA structure and COA List Minimum 30% data Minimum 100% data
complete complete
Asset Category : Category of Fixed Asset
100% data complete
Suppliers : Suppliers, Supplier sites and Contacts (must fulfill all variance (complete master data
data) for UAT)
Security Matrix : User Name, Menu and Responsibility

* Data will provided in an agreed format (data extraction from existing systems is Customer’s responsibility) and uploaded by Metrodata

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Data Migration – Opening Balance
Execution and
Required Opening Balance Definition Launch
Application
Minimum 100% data
complete
Fixed Assets : Lease assets with remaining balance. Historical data is not
- 100% data complete
migrated. (complete opening
balance data for Go Live
simulation)

* Data will provided in an agreed format (data extraction from existing systems is Customer’s responsibility) and uploaded by Metrodata

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Approaches and Assumptions
SOFTWARE
▪ Implementation Oracle ERP Cloud last supported version available updated Kick Off date.
▪ Maintenance and support for Oracle application software and associated tools/utilities is outside ME’s responsibilities and will be provided by Oracle
Indonesia/Oracle Corporation.

SOLUTION
▪ Follow Oracle best practice business process flows.
▪ To achieve smooth transition from old system to Oracle, “Cut Off” approach suggested in preparing and executing new system Go Live.
▪ If parallel approach considered to, ME highly recommended no comparison activities between old system and new system.
▪ No historical transaction information shall be loaded in the new system
▪ No integration with 3rd Party System/Legacy System except mentioned in Scope of Work
▪ Change management is not considered within the scope of the project and it is the responsibility of IP and should be initiated before the project start.

ENVIRONMENT
▪ Hrovisioning should be done before project start.
▪ IP will provide workstations for project team, such as: project room, meeting room, and training room.
▪ IP will provide necessary infrastructure and equipment that are required to run the implementation smoothly, including network, internet, projector,
printer, paper, whiteboard, etc.

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Approaches and Assumptions
RESOURCE
▪ IP will provide dedicated Key Users at least same with ME’s consultant, who understand its business process to work together with ME consultants during
the implementation.
▪ The project team will have access to the necessary IP’s resources to answer functional and technical questions during implementation.
▪ Training will be delivered to IP Key User and Project Team using “Train-the-Trainer” approach.
▪ End User will receive their training from IP Key Users.
▪ IP will extract, clean up, reconcile, validate, and provide master data and opening balance in template format that provided by ME.
▪ If there is integration with 3rd party system, IP must provide the expert who understand and qualified for 3rd party system.

SUPPORT
▪ ME will give post Go Live support for first period closing after Go Live or 1.5 Months after Go Live date.
▪ Go Live support mechanism consist of Key User (1st Layer Support), IT Team (2nd Layer Support), and Consultant (3rd Layer Support).

GENERAL
▪ Indonesia will be the language of communication and all document created will be in English.
▪ To ensure the project activities run smoothly, all documentations that required to approve or sign off should be done within 3 days or it will consider
approved.
▪ All consultant's transportation and accommodation (out of in-town project site) cost include out of pocket expenses (include per-diem) is IP’s
responsibilities and follow ME’s standard.
▪ Any changes in the scope will be considered as a change and will be evaluated separately in terms of cost, effort, & schedule.

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Investment

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Investment Summary
Item Amount (IDR)
Oracle Yearly Subscription Rp1,523,857,500

Implementation Service Rp 749,800,000.00

Grand Total Rp2,273,657,500.00

• Total Investment value are IDR exclude VAT


• Total Investment exclude Hardware Investment and will be submitted separately

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Oracle Subscription
Item Qty Amount Y1 (IDR) Amount Y2 (IDR) Amount Y3 (IDR)
Oracle ERP Cloud (user) 25 Rp1,350,937,500.00 Rp1,350,937,500.00 Rp1,350,937,500.00

Oracle PaaS/IaaS (Universal Credit


metered valid for 1 year consumption)
Equal with 14 million IDR for 2 OCPU 1000 Rp172,920,000.00 Rp172,920,000.00 Rp172,920,000.00
DBCS consumption

Rp1,523,857,500.00 Rp1,523,857,500.00 Rp1,523,857,500.00

• Investment value are IDR exclude VAT


• Discount level are subject to be approved by Oracle Principal
• Contract Base 3 or 5 years subscription with annual payment in advanced

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Professional Services

Item Amount (IDR)


Implementation Service Option Financial
integration to GL
- Implementation duration: 3 months Rp 749,800,000.00
- Go Live support: 1 month

• Investment value are IDR exclude VAT


• Investment exclude operation expenses (accommodation, flight, travel, hotel, and transportation) and per diem that will be charged based on
ME Standard

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


Term of Payment

No Milestone Percentage (%) Term and Conditions:


▪ All prices are excludes VAT
1 After Kick Off Meeting or Project Charter Sign Off 30%
▪ Payment should be completed within 14 days from invoice date
2 After FPM Document Sign Off 35% ▪ License will be full invoiced (100%) after PO received
3 After CRP Document Sign Off 15% ▪ Professional Services will be invoiced based on milestone (see table)
4 After UAT Document Sign Off 15%
5 After Go Live Support 5%

Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021


APL Tower 37th Fl.
Jl. Letjend. S. Parman kav. 28
Jakarta 11470
Phone: (021) 2934 5777; Fax: (021) 2934 5700
Email: contact@mii.co.id
Website: www.mii.co.id

IntilandTower Surabaya, 6th Floor, #2B


Jl. Panglima Sudirman kav. 101-103, Surabaya 60271
Phone: (031) 5474217; Fax: (031) 5474 216
Email: mii.surabaya@mii.co.id
Strictly Confidential ©PT Metrodata Electronics, Tbk. 2021