PT Indonesia Power
• Proposal Summary
• Proposed Solutions
• Project Management
• Investment
Proposal Accountability
• Kindly note to not accept any investment / pricing numbers written in this proposal as final. The investment or
pricing number provided in this proposal ARE NOT intended to represent exact investment for IP. ME will requires
further assessments in order to obtain exact and accountable investment number.
Proposal Validity
This Proposal valid until 1 (one) month from proposal date
... PT INDONESIA POWER (IP) would like to implement PSAK 73 for their lease assets …
… PT Metrodata Electronics, Tbk (ME) as an Oracle Platinum Partner would like to present this proposal for Oracle Fusion
Cloud. This document provides a quick walkthrough of Oracle Fusion Cloud Implementation that includes product features,
high level scope , timelines , assumptions & dependencies with focus on PSAK 72 Solution…
Sales & Product Management Order Management Supply Chain Execution Transportation
Service Development & Product Order Price & Supply Inventory Warehouse Base Fleet
Innovation Hub Capture Promotion Orchestration (Rec, Ship)
Customer Management
DM
Order Manufacturing & Operational
Quality Management Backlog Cost Mgt
Services Orchestration Maintenance Planning
Analytics
: Proposed Module
Lease information
Amortization schedule
Purchase Fixed Lease
Invoice Lease interest
Order Assets Asset Lease Depreciation
Lease invoice
Revaluation Rules
Cost Full Revaluation Life-Based Full
Asset Life Partial Accounts Flat Rate Partial Cost
Depreciation Method Current-Period Revalue in a Book Units of production Partial Unit
Depreciation Rate Retroactive Revalue in a Diminishing Value Current-Period
Salvage Value Category Bonus Rules Retroactive
Rule Revalue Individually
Capture
lease information
Generate
Payables amortization schedule
Calculate
Lease lease interest
Terms
Calculate depreciation
Lease Assets
Contract
Create accounting
General Ledger
Generate
lease invoices
The goal is to identify project scope and high-level The goal is to prepare the final process of system
requirement during initiation into more detail launching to production
Key Activities ▪ Contract Agreement and ▪ Configuration Review ▪ Perform Configuration and ▪ Support End User Training ▪ Go Live
Project Charter Sign Off ▪ Development System Testing (EUT) ▪ Perform Go Live support
▪ Prepare Project Facility & Preparation ▪ Develop Customization ▪ Production system ▪ Submit project documents
Infrastructure ▪ Future Process Model ▪ Perform Conference Room Pilot preparation ▪ Project handover and
▪ Mobilize Project Team (FPM) Review (CRP) ▪ Conduct data migration closing
▪ Project Kick Off ▪ Additional Indonesian ▪ Perform System Integration ▪ Go Live confirmation
Localization (Tax) Test (SIT)
▪ Define Customization ▪ Conduct User Acceptance Test
Design (UAT)
▪ Migration Strategy Finalization
Key Deliverables ▪ Contract Agreement ▪ Future Process Model ▪ CRP Scenario Script ▪ User Manual by Key User ▪ Application Setup
▪ Project Charter (FPM) Document ▪ SIT Scenario Script ▪ Data Conversion Document
▪ Kick Off Meeting ▪ Customization Design Sign ▪ UAT Scenario Script ▪ Production system ready ▪ Customization Design
Presentation Off ▪ Migration Strategy ▪ Go Live Check List Document
▪ Development System Document
Ready
Initiate
Definition
Launch
Go Live Support
Note:
• Implementation : 3 Months
• Go Live Support : 1 Months
Notes:
Project Manager
(PM) ▪ Red: IP
▪ Blue: ME
Change ▪ Green: IP and ME
Management
(CM)
FINANCIALS
MASTER DATA TECHNICAL
(GL, FA, AP)
Functional
Developer (DEV)
Consultant (FC)
Database
Key User (KU) Administrator
(DBA)
Hardware &
End User (EU)
Network (HN)
Kick Off Meeting • Official announcement of project “Go Ahead” to Oracle project team
• Communicate project approach, plan, & direction to the project team
• Steering Committee Members One Time
• Project Managers • To secure Oracle project team member’s commitment to the project
• Project Team Members • To introduce project team members
Steering Committee Meeting • To understand and discuss overall project progress and direction
• Approval of critical deliverables Monthly /
• Steering Committee Members • Discuss escalated project issues Ad Hoc
• Project Managers • Review project changes in scope and budget
Other Meeting
Over the lifetime of the project there may be a requirement for review meeting and will be
Ad Hoc
arranged as and when required.
Depend on meeting purposes
Environment Test Instance Test Instance Test Instance Test Instance Test Instance
Material Overview Training PPT Technical Training PPT FPM Process FPM Process FPM Process
CRP Script UAT Script User Manual
* Data will provided in an agreed format (data extraction from existing systems is Customer’s responsibility) and uploaded by Metrodata
* Data will provided in an agreed format (data extraction from existing systems is Customer’s responsibility) and uploaded by Metrodata
SOLUTION
▪ Follow Oracle best practice business process flows.
▪ To achieve smooth transition from old system to Oracle, “Cut Off” approach suggested in preparing and executing new system Go Live.
▪ If parallel approach considered to, ME highly recommended no comparison activities between old system and new system.
▪ No historical transaction information shall be loaded in the new system
▪ No integration with 3rd Party System/Legacy System except mentioned in Scope of Work
▪ Change management is not considered within the scope of the project and it is the responsibility of IP and should be initiated before the project start.
ENVIRONMENT
▪ Hrovisioning should be done before project start.
▪ IP will provide workstations for project team, such as: project room, meeting room, and training room.
▪ IP will provide necessary infrastructure and equipment that are required to run the implementation smoothly, including network, internet, projector,
printer, paper, whiteboard, etc.
SUPPORT
▪ ME will give post Go Live support for first period closing after Go Live or 1.5 Months after Go Live date.
▪ Go Live support mechanism consist of Key User (1st Layer Support), IT Team (2nd Layer Support), and Consultant (3rd Layer Support).
GENERAL
▪ Indonesia will be the language of communication and all document created will be in English.
▪ To ensure the project activities run smoothly, all documentations that required to approve or sign off should be done within 3 days or it will consider
approved.
▪ All consultant's transportation and accommodation (out of in-town project site) cost include out of pocket expenses (include per-diem) is IP’s
responsibilities and follow ME’s standard.
▪ Any changes in the scope will be considered as a change and will be evaluated separately in terms of cost, effort, & schedule.