Professional Documents
Culture Documents
www.huawei.com
Solution Country Operator Slide
U.A.E DU Enter
2
Solution Country Operator Slide
/ Airtel Enter
3
Solution Country Operator Slide
Italy TI Enter
Solar Hybrid S3
Chad Tigo Enter
4
Solution Country Operator Slide
5
Solution Country Operator Slide
/ MTN Enter
/ Vodafone Enter
6
S1 Cases
7
Solar Power System Help Sotelma Win in Mali
Sotelma Challenges
Solar hybrid-S1 Save 12.2 million USD OPEX per year (580 sites)
Advanced SolarlMax patent technology Zero CO2 emissions with green solution
No need frequent site visiting
8
Solar Power Widely Used by Sotelma in Mali
Background
Sotelma is the main operator in Mali.most sites are facing the problems:
off-gid、fuel stolen、Difficult to maintain、high OPEX.
Huawei Solution
Best controller : MPPT controller;
High Reliability:error tolerance design;
Solar Cycle Battery:works below 50°C, 1500 times @30% DOD;
Anti-theft Design : Anti-theft bolt、 Elevated Support Structures、
Solar Panel Lost Alarm;
Customer Benefits
Low TCO:zero fuel consumption,less PV modules;
High Reliability,Less maintenance;
Anti-theft Design Protect Investment
9
Solar Hybrid Solution for Ncell
The fastest growing mobile operator in Nepal, subnet of TeliaSonera, the leading
European telecommunication company present in over 20 markets with > 450 million
inhabitants.
Challenges of Ncell
Fast rollout & low cost services to attract new subscribers
Poor main grid supply and high D.G running cost
Difficult access to sites & high helicopter transportation cost
Huawei Solution
Total solution of wireless access, transmission, site power supply, tower and shelter in
one package
3900E Series Easy GSM BTS, less power consumption
Only 16pcs PV panel solar site without D.G configured
Smaller footprint and faster deployment of Tower & Mini-shelter
Benefits
Fast deployment ensures fast coverage
Lower deployment cost , better service
Easy & profitable in remote & hilly areas
Green energy sites won social appreciation
10
Solar Hybrid Power for Bangladesh GP
Project named "Building a Greener 'Green Mobile Award' at the GSMA Site Configuration
Mobile Network“ in Bangladesh. Mobile Awards 2009
BTS Huawei BTS3900
Site load consumption 1200w
PV modules 170Wp x 39pcs
Controller Hybrid power controller with
MPPT technology
Customer Benefits:
Well balance the CAPEX and OPEX by solar-diesel power solution
Average Diesel running time<2 hours per day. Fuel consumption saving 13300L/year
Compare to D.G solution, the TCO for solar-diesel hybrid power solution was balanced within 1.5 years,
TCO of 3 years will save $52000, about another site CAPEX
11
Solar Power Solution for Etisalat Egypt
site location- Egypt BTS type BTS3006C
TRX configuration S2/2/2
BTS consumption 800W
PV module 165W×36pcs
Battery capacity 1600 AH/48V/3days
Customer challenge
Remote desert with off-grid
Tourist district with pressure for environment protection
Solution feature
Stable power supply for site
Environment protection and energy saving
TCO Saving
12
Solar Hybrid Solution for Banglalink, OT in Bangladesh
Application Scenario
• Rural area
• Low Erl
• Small coverage
• Omni coverage or Single sector
directional coverage
• Solar resource: average solar
Peak > 4H
13
Solar Power Solution for Pakistan WARID
Site Location Near Sukkur, Pakistan
Customer challenge
Remote telecom site with off-grid power
High CAPEX for remote site
High OPEX with traditional energy solution
PV module anti-theft protection
Solution feature
Compared with traditional generator(1+1) site, TCO will be balanced within 3 years
Green energy solution reduce diesel fuel ~18,000L/year
CO2 emission reduced about 4205 ton every year
High reliability solar controller
14
Green Site Deployed in STC Saudi Arabia
STC is the leading national provider of
telecommunication services in Saudi Arabia .
Challenge:
To achieve universal access within 3 years
Severe environment requires higher reliable device
Operation efficiency promotion needs more Opex-saving
15
Solar Power Solution Supports Sudatel to Win
Challenges of Sudatel
Huawei Solution
Solar power solution for remote sites, serve more than 150 sites Sudatel:the mobile arm of Sudatel Group of Companies
and the leading mobile and broadband service provider
Distributed base stations to reduce energy consumption. to consumers and businesses in Sudan
Benefits
Zero OPEX, ROI less than two years, most single-frequency site for one
year.
High effectively to deploy solar energy, with best sunshine conditions in
earth.
Zero CO2 emissions with green solution, Enhancing brand
16
reen Site Help DU Get Low OPEX & Zero CO2 in U.A.E
Challenges
Remote areas’ barely impossible to reach commercial grid;
• High grid access cost (150KUSD/site)
Legacy dual D.G. solution with High OPEX;
• High D.G. fuel & service cost (19KUSD/year/site )
• High maintenance cost.
Carbon emission reduction goal has been set in DU.
Benefits
• Save 21K USD fuel & maintainence cost yearly per site
Background: DU is the trade name of the Emirates Integrated Telecommunications Company (EITC), • Nearly ZERO visit with low OPEX
in the United Arab Emirates offering fixed and mobile telephony with 3.48 million subscribers.
• Zero CO2 emissions with green solar.
17
Solar Power for Unitel Angola
About UNITEL
UNITEL is the Top Mobile Operator in Angola, has more than 8 million
subscribers (50% is in Capital city – Luanda). Deployed GSM/UMTS network in
18 Provinces.
Unitel’s Challenges
• Off-grid and high cost for main power access
• High OPEX by traditional power solution (Generator)
• Difficult to do maintenance and refuel in remote area.
• Low ARPU and small subscribers
18
Solar Power Solution for Botswana BTC
TRX configuration 02
PV module 165W×22pcs
Application scenario:
remote area
No grid
Customer challenges:
Quick ROI
Theft threat
Solution benefit:
TCO balancing with 1.3 years
High module support, effective anti-theft
19
Solar Hybrid Solution for Safaricom
Opportunity & Challenge Benefits to Safaricom
Unstable grid or off-grid in rural area Fast installation in rural area, installation in 3 weeks
Minimum infrastructure requires to save CAPEX “Zero” CO2 emission
Low APRU, but difficult maintenance and high OPEX “Zero” OPEX
Safaricom, subsidiary of Vadafone in Kenya, is the biggest telecom operator in Kenya, with 15M subs.
20
Solar Hybrid Solution Helps MTN Nigeria Achieve
Seamless Coverage
Challenges
Government requires rural coverage, low ARPU
High cost on fuel consumption, site maintenance and fuel-stolen problem in rural sites,
no grid power
Lack of revenue growth, urban coverage saturated
Benefits
Only invests for one time, nearly zero OPEX
More stable system and no need to maintain
Zero CO2 emission, MTNN brand value promotion
Solar Solution: Soldering & stolen-proof
Solar Solution
Rural areas and several cities application, totally 285 solar sites
Pure solar solution in northern and central Nigeria Saves D.G. and fuel
Solar and Grid solution in some cities Saves Grid power, D.G. and fuel
Solar and D.G. solution in southern Nigeria Saves fuel
21 Home 21
Solar Hybrid Solution for MTN Nigeria
Challenges
Rural coverage, high civil work cost, low ARPU
Antenna No grid power, high OPEX and fuel-stolen problem
MW Solution
BTS, energy and battery are all installed on one pole.
3900E
Benefits
Low cost, quick deployment, easy O&M, low OPEX
Zero CO2 emission, MTNN brand value promotion
PV
Energy
Controller
Battery Cabinet
22
Solar Hybrid Solution Help MTN Win Rural Market in Zambia
Opportunity & Challenge Huawei Solar Hybrid Solution
Huge potential in Low ARPU subscribes BTS, MW, and solar panels are all installed on pole
High Cost for civil work Remote monitoring
Expensive power access
Long time to development site Lightning rod
Omni antenna
BTS3900E
Benefits to MTN MW
Solar controller
23
Solar Hybrid Solution for MTN Zambia
Challenges
Hard to do site deployment in remote areas
Unstable or off grid power supply
Difficult to do maintenance
Benefits to MTN
Config. Remarks
Site Type Omni O2 Site power consumption 260W
Green site solution, no maintenance and zero CO2
Tower 18m 4legs
emission BTS BTS3900E x1pcs
Save footprint more than 50% compared to traditional Antenna Omni antenna x2pcs
24
Solar Hybrid is Widespread in Sudan Zain
Challenges
Off-grid sites with high energy expenses:
• High fuel consumption: 15K~20K liters/year
• Frequent refuel: every 2~3 weeks
• Frequent spare parts replace: every 300 hours
Huawei solution
25
S2 Cases
26
500+ Solar Hybrid Save Airtel $12.5M Per Year
Challenges: Huawei Solutions: Airtel Benefits:
• 17 countries ,3000+ off-grid sites • Solar + Diesel hybrid • Saving 25,000 USD/year/site
• High energy cost related with D.G. power solution with • ROI < 2.5 years
(42,000 USD/year/site) NetEco
Over 75M USD expected to be saved per year for 3000 sites
27
Solar Hybrid Solution for Claro Guatemala
the largest mobile phone
network in the Americas.
28
Solar Hybrid &NetEco Help Nextel Chile Save More
Digital trucking operator Nextel Chile has finished
Opportunity & Challenge construction of its nationwide 3G mobile network in Chile.
Huawei Solution
Professional Solar-D.G. hybrid solution
NetEco
NetEco: Site Energy And Environment Management
Benefits
Save 50% Capex compare to grid setup
Annul saving fuel consumption 60%
Remotely site management to reduce site visit
29
Solar (+Diesel) Hybrid Power System for CamGSM
Challenge of CamGSM : Keep to be No.1
No.1 in Cambodia mobile market for >15 years
Thunder and lightning area
Bad experience of existing query
Hard to expand necessary functions, e.g. fuel level detection
Old &low efficiency PV panels on existing sites
Rapid deployment: 520 sites/3 months iManager NetEco site energy and environment management system
30
Solar Hybrid Solution for eAccess
, and B Japan’s leading mobile broadband operator, provides “A new and more
efficient broadband life for all”, serving 60% of the total data service users in Japan.
Challenge of eAccess
Emergency such as the recent earthquake threats communications
Less reliability to nuclear energy .
Quick deployment on site in emergency .to supply power
31
Digicel Vanuatu Reducing OPEX with Huawei
Challenges
32
S3 Cases
33
Solar (+Grid) Hybrid Power Site For Pakistan CMPak
Site Configuration
Customer Benefits:
34
I-site Energy Hybrid Solution for Vodacom South Africa
Huawei I-site energy hybrid solution: Site Configuration
Solar+Grid hybrid solution Load DBS3900, 1500W
Test Report
Vodacom Benefits: Saving 25% electricity charge Saving CO2 emission 271Kg /month
35
Solar Hybrid Solution Helps TI Reducing CO2 Emission
Situation in Italy of solar power: Huawei Solution:
EU has the requirements of reducing carbon emission Solar+Grid Hybrid Solution, max. using solar power
Solar power is sufficient in Italy and has been widely used Reusing existing power distribution units
Government subsidy for solar power in Italy PV Panels on top of the shelter, site area remains the same
TI (Telecom Italia) Requirements: The site can be managed remotely through Huawei NetEco
TI Benefits:
CO2 Emission reducing up to 35%
Saving 39% OPEX (average)
Site easy management remotely by Huawei NetEco
36
Green Site Modernization in Tigo Chad Emerging Market
Background of Operator Benefits
Tigo dedicated for Emerging Mkt, including Ghana, Congo, Tanzania, Chad, • ~85% Power Consumption Saving (4980w = 5880w-900w ) due to AC and
Senegal, Rwanda, Mauritius, aiming Top.1 operator with 3”A” Strategy. Generator shutdown;
• Shelter cost saving by One site solution
Tigo Chad Challenge • Simple maintenance and Easy installation .
• Extremely high temperature 55℃ and fuel consumption is very high ,OPEX is
high.
• Poor traffic and Environment for site construction;
• Lack of Coverage, especially in rural place.
• Delivery cycle is short demand.
• The pressure of energy saving
Huawei Solution
Transform the fuel diesel site into a solar energy site
37
Solar & FCB Solution Help Zong Succeed in Pakistan
Huawei’s A solution !
CP/DG + Solar Solution
Huawei’s B solution !
Zong’s problems ?
CP+FCB Solution
Huge OPEX due to long time DG running
More than 130 FCB have been delivered
Headache brought by stealing fuel and DG maintenance
Benefits to Zong !
Remove DG, no headache related to DG
38
Solar-Grid Hybrid Solution for Syriatel
Operator Background
Syriatel leading the Syrian mobile telecommunication market since 2000, have
successfully established its reputation by focusing on Customer satisfaction
and social responsibility.
Customer challenges
Unstable Grid, Site shutdown frequently in suburban area
Difficult to do maintenance for suburban site and lead to high OPEX
Huawei Solution
Load Consumption 134.43 (kWh) Benefits
Solar Contribution 92.03 (kWh) Solve unstable power supply problem
Grid Contribution 57.23 (kWh) High efficiency rectifier and solar MPPT controller
Power proportion
61.66% Greatly reduce maintenance times more than 50%
by Solar
PV module Q.ty 15 PCS
Base on 1 week statistical date
39
D1 Cases
40
4000+ Diesel Hybrid Save MTN $58.5M per Year
Huawei have deployed 4000+ sites in MTN Nigeria since 2011
Huawei took 50 hybrid installation teams and deployed 1100
sites in 4months for phase I 2011.
Excellent deployed capability, at most 400sites/month , 150
sites per month more than other vender, 180,774USD per month
more saving .
Huawei diesel hybrid solution helps MTN to save OPEX $58.5M per year
41
Diesel Hybrid Solution for Guinea-Bissau MTN
MTN’s challenges:
• Dual 6-9kVA D.G. solution
was used in 10 sites
• High fuel consumption and
maintenance OPEX on the
D.G.s.
Guinea-Bissau PowerCube-D
D502A
Load Power-1600W Benefits to MTN:
Dual D.G. reused
ESS-D 28.8kWh
• Only add 1 cabinet, easy to
insta
• Limiting D.G. running time <
11h/day
• Saving fuel up to 30%
• Saving maintenance up to 50%
Site hybrid power • Prolonging D.G. lifespan over
outdoor solution 100%
42
Diesel Hybrid Solution for Sudan Zain
Challenges of Zain Sudan TCO Comparison for Traditional & ACB Hybrid Solution
43
Diesel Hybrid Solution Help XL Saving OPEX
Challenges
Unstable grid in these sites
High fuel consumption :average 25 liter
per day
High D.G. maintenance cost
60000 Huawei
Energy Plant System Reused D.G. Solution TCO
40000
Energy Storage System 57.6kWh 20000
0
Average DG Running Hours Before 18 hours/day
0 1 2 3 4 5 6
After 4.6 hours/day
Huawei solution can return investment almost 2 years.
Average Fuel Consumption Before 30 liter/day
Huawei solution can get profit about 54KUSD/site within
After 11 liter/Day
6 years
44
Diesel Hybrid Power Solution for Orange Guinea
Challenges Huawei Solution:
45
Diesel Hybrid Solution for Mitratel Indonesia
Challenge
off-grid in these regions.
High maintenance for traditional D.G. solution
Difficult to access remote sites
Benefits for Mitratel
Save energy up to 60%
Save maintenance up to 60%
Fast deployment
Effective anti-theft solution
Site type Outdoor
BTS consumption 1000-2000W
PSU 50A x 3
DCB Battery 490Ahx 2
46
Diesel Hybrid Power System for Viettel Vietnam
Challenges
Rural coverage, poor grid power, difficult to access the site
Low ARPU and high OPEX related with D.G. power
Fuel-stolen problem
Huawei Solution
D.G. & battery hybrid solution improve energy efficiency
Automatic adding lube oil solution, special D.G. design for
increasing maintenance interval
All-in-one integrated design and fuel level alarm for anti-theft
Customer Benefits
Saving fuel consumption up to 65%, saving OPEX related with D.G.
up to 60%
Maintenance interval increasing from 10 days to 3 months
Fast and easy deployment, effective anti-theft solution
47
Diesel Hybrid Solution for Telefonica Spain
Challenges Huawei Solution
1500 L/month fuel consumption PowerCube Diesel hybrid
D.G. keep running for 24 hours D1- Advanced for 2kW load
every day
Diesel Generator: 10kW
Refueling every week
ESS-A: 19.2 kWh
No remote monitoring
Telefonica Benefits:
TCO Analysis
$300,000
48
Diesel Hybrid Solution for Eagle Mobile
Customer challenge
Rural site without grid power
High OPEX for fuel consumption
Frequent maintenance
49 Home 49
Diesel Hybrid Solution for HCPT Indonesia
Challenge
Unreliable grid or no-grid in these regions.
High maintenance for traditional D.G.
Difficult to access remote sites
Benefits for HCPT
Provide high reliable power solution and provide E2E
managed service solution
Save energy up to 60%
Save maintenance up to 60%.
50
Diesel Hybrid Performs Very Well in Iraq Aisacell
Original Hybrid
BTS BTS3900A BTS3900A
DC average consumption 1300W 1300W
Battery Cabinet IBBS (TEC) Mini-shelter (Air-con)
Battery Capacity/Type 300Ah/AGM 1 x 600Ah/DCB
Rectifier 90A 90A
The temperature of the Battery Cabinet is The average charging time of The average discharging time of
controlled between 17 to 26 degree. battery is 6.16Hr. battery is 8.53 Hr.
51
Nigeria Zain – D.G. + Battery Hybrid Solution for Indoor Site
Indoor Site PAC for Huawei Hybrid Solution for Ericsson’s site from Zain Nigeria
Huawei D.G. + battery hybrid solution can be used in different TE suppliers’ sites.
52
Fuel Saving Solution for Uganda MTN
Site location-Bukoto Uganda BTS type BTS3012AE
Customer challenge
Remote telecom site with off-grid power
High OPEX for remote diesel generator site, High maintenance
Long install period, without fuel anti-theft function
Solution feature
Fuel cost reduce up to 60% compare with traditional solution, maintenance reduce up to 70%
D.G. system basement construction reduce up to 50%
Single foundation’s pre-installation reduce installation time up to 50% (Traditional D.G. need 2
persons with 2days for installation)
Single foundation with fuel anti-theft function for the remote D.G. power site
53
Diesel Hybrid Solution helps MTN Zambia Save OPEX
Maintenance
(Times) 23 13 10 43.48%
54
Diesel Hybrid Solution for Telefonica Peru
Telefonica Challenges : Telefonica Requirement : Huawei Solution:
High fuel consumption Reduce fuel consumption Diesel Hybrid solution
High site visiting Reduce site visiting times Site energy management system
cost NetEco
Site Configuration
Load consumption 400W (Average)
D.G. 12.5kVA
Telefonica Benefits:
D.G. running time reduce from 24 hours /day to 3 hours /day $6570 /site/year
55
Co-site Hybrid Power Solution for American Tower(ATC) Uganda
Challenges of Existing Sites in Uganda
No uniform platform for site sharing, separate No remote monitoring system, difficult to analyze
battery & rectifier required for each operator power consumption and carry out maintenance
Small rectifier capacity, difficult to expand Battery is weaken sharply
Tenants
1 All-in-one Power system ATC Benefits :
Diesel hybrid power solution(reused D.G.) Flexible deployment, easy expansion
Support 4 operators site sharing Power consumption is accounted independently
Remote management with NetEco for each operator.
56
G2 Cases
57
Grid Hybrid Solution Scale Application in Pakistan Ufone
Ufone Challenge: Huawei Solution: Site Configuration
5886 sites in unstable grid areas Grid hybrid-G2 with NetEco Load BTS , 1500W
High OPEX related with D.G., Removing D.G. Mains Outage <12Hs/day
over $80M USD cost per year Full charging < 2hours Battery (ACB) 250Ah
3000+ sites contracts have been signed in 2011, 1000+ sites have been deployed till May.2013
TCO get balance in 1.5 year
$200,000
$180,000
$160,000
$140,000
$120,000
$100,000
$80,000
$60,000
$40,000
$20,000
$0
1st year 2nd year 3rd year 4th year 5th year 6th year Total cost
Over 22.1M USD saved per year Traditional Solution Huawei Solution
Two years later, expected 66.5M USD for total 3000 sites
58
G3 Cases
59
1000+ Grid Hybrid Save Mobilink $22.2M Per Year
A Typical Modernization Model (3976 Sites)
Before modernization After modernization 1841 sites saved:
Indoor, Grid+ backup D.G. Outdoor, Grid hybrid
27.4 Million USD
1200 W Genset
Genset 27KVA “0” running of genset
2500 W A/C
Two years later, expected 47.7M USD for total 3976 Sites
60
G4 Cases
61
Grid Hybrid Solution for Pakistan CMPak
CMPak’s Challenges Huawei Solution Benefits to CMPak
Huge OPEX due to long time D.G. Grid + ESU-F Solution Remove DG, no headache
running More than 1300 ESU-F solution related to DG
Headache brought by stealing fuel have been delivered
and D.G. maintenance
Short battery lifespan due to poor
Grid
62
Grid Hybrid Solution for PTCL OFAN Site in Pakistan
Challenges Huawei Solution
Benefits
63
Page 63
Grid Hybrid Solution for Robi
Robi Challenges: Huawei Solution: Configuration Before After
• High fuel consumption Battery 400Ah *2 650Ah *1
• Grid hybrid-G4 with 5kVA D.G.
• High cost of D.G. maintenance • Battery full charging < 4 hours D.G. 22 KVA 5 KVA
64
OSS: NetEco
65
Airtel Found Fuel Stolen through NetEco
Airtel power solution before modernization: Fuel data from the subcontractor is suspicious
Fuel D.G. D.G.
Refueled
D.G. + battery + Period
(L)
Consumption RUN RUN
(L/H) (H) (h/day)
Huawei provide solar hybrid solution and Before
2012.7.12-
500 1.798L/H 278 13.9
OSS NetEco for Airtel: 2012.8.2
2012.8.11-
After
2012.9.3
500 1.736L/H 288 12
+ +
Almost no saving after adding
solar?
NetEco data proves subcontractor has fuel stealing action
Proof 1: D.G. running < 3 hours/day Proof 2: Battery charge < 3 hours/day
66
Cooling
67
Indoor Cooling Solution help Mobilink Saving Power
Mobilink traditional cooling solution : AC Aircon Huawei indoor cooling solution:
• Low EER, high power loss, high power cost Unique split DC Aircon, designed for telecom
• High start-up current, need large capacity D.G. scenarios (-48V), high efficiency
Cooling performance enhance 40% Saving power cost 890USD per year
68
Group Cases
69
Huawei ‘Solar Hybrid’ Helps Airtel to Save OPEX
Challenges: Huawei Solutions: Airtel Benefits:
• 17 countries ,3000+ off-grid sites • Solar + Diesel hybrid • Saving 25,000 USD/year/site
• High energy cost related with D.G. power solution with • ROI < 2.5 years
(42,000 USD/year/site) NetEco
Over 75M USD expected to be saved per year for 3000 sites
70
Huawei PowerCube-G Help Ufone Saving TCO
Ufone Challenge: Huawei Solution: Site Configuration
5886 sites in unstable grid areas Grid hybrid-G2 with NetEco Load BTS , 1500W
High OPEX related with D.G., Removing D.G. Mains Outage <12Hs/day
over $80M USD cost per year Full charging < 2hours Battery (ACB) 250Ah
3000+ sites contracts have been signed in 2011, 1000+ sites have been deployed till May.2013
TCO get balance in 1.5 year
$200,000
$180,000
$160,000
$140,000
$120,000
$100,000
$80,000
$60,000
$40,000
$20,000
$0
1st year 2nd year 3rd year 4th year 5th year 6th year Total cost
Over 22.1M USD saved per year Traditional Solution Huawei Solution
Two years later, expected 66.5M USD for total 3000 sites
71
Diesel Hybrid Doubled MTN Group Energy Efficiency
MTN Group Challenges:
• 18 countries sites with bad grid.
• More than 30% of the total sites are off-grid in these countries.
• Dual D.G. solution was used on the sites of poor power.
• High fuel consumption and maintenance OPEX on the D.G.s. Sample site data for off-grid site
Bat.
MTN adopt Huawei D.G+Bat. Hybrid Power: Site Name
D.G Running
Running
D.G Running Bat. Running
Fuel saving
hrs/day percent percent
• D.G. and battery power the site alternatively. hrs/day
• D.G. runs for powering BTS and charging battery.
• Hybrid controller checks the battery DOD to switch on/off D.G. MTN Uganda 7.7 hrs 16.3 hrs 32% 68% 54.60%
• The Deep Cycle Battery performs up to 3500 times cycles.
72
Huawei ‘Grid Hybrid’ Helps Mobilink to Save OPEX
A Typical Modernization Model (3976 Sites)
Before modernization After modernization 1841 sites saved:
Indoor, Grid+ backup D.G. Outdoor, Grid hybrid
27.4 Million USD
1200 W Genset
Genset 27KVA “0” running of genset
2500 W A/C
73
Huawei Green Energy Solution Widely Used By VDF
VDF Challenges Huawei Green Energy Solution
• High OPEX and high CO2 emission Solar hybrid solution: Diesel hybrid solution:
with D.G. power solution • Advanced SolarMax patent • Advanced DieselMax patent technology
• Most sites in off-grid or technology • High performance DCB battery, 2500cycles,
unstable grid areas • Smooth evolution and unified @60%DOD ,25℃
• Difficult to access remote sites O&M • Reduce D.G. running time
VDF Benefits
Turkey: solar hybrid solution South Africa: solar hybrid solution Congo: Diesel Hybrid Solution
• saving$24,000/ year • Saving $102,000 in 5 years. • Saving OPEX by 70%.
• TCO reach balance at the 4th year • Zero CO2 emission • Lessen CO2 emission.
74
Easy Solar for Vodafone SouthAfrica
75
HUAWEI ENTERPRISE ICT SOLUTIONS A BETTER WAY