IDB CREATION PROCEDURE

Open the OMT

Click Configuration and then Click Create IDB.

Click on NEW of create IDB

Muhammad Saud Khan


IDB CREATION PROCEDURE

Select Cabinet Model for Example 6101 RUS.

Select power syetem DC -48 volt.

Muhammad Saud Khan


IDB CREATION PROCEDURE
And then Click on OK button.

And then Click NEW button of Antenna Sector Setup.

Muhammad Saud Khan


IDB CREATION PROCEDURE

And then Select Number of Sector.

And then select SECTOR Band(900/1800).

Muhammad Saud Khan


IDB CREATION PROCEDURE

And then Click on OK button of Tab.

Select RUS type and then define number of TRX on A Collum.

Muhammad Saud Khan


IDB CREATION PROCEDURE
Window will be show just like below

Click on OK button of IDB window.

Muhammad Saud Khan


IDB CREATION PROCEDURE

Check on Run RBS configuration wizard.

Click on OK button

Muhammad Saud Khan


IDB CREATION PROCEDURE
Click on Load default values

Define your RU Position

Muhammad Saud Khan


IDB CREATION PROCEDURE

Click on OK button

Define EC cable position on SHU

Muhammad Saud Khan


IDB CREATION PROCEDURE
If 2 DUG in one cabinet then select Add node

Define second EC cable position of Second DUG in SHU.

Muhammad Saud Khan


IDB CREATION PROCEDURE

The window will be show off.

Define MCTR value if not match with FDD

Muhammad Saud Khan


IDB CREATION PROCEDURE
Click OK button.

Define RBS HW Info.

Muhammad Saud Khan


IDB CREATION PROCEDURE

The window will show

Click on OK button

Muhammad Saud Khan


IDB CREATION PROCEDURE
Click on OK button

Click on OK button

Muhammad Saud Khan


IDB CREATION PROCEDURE
Click on OK button

Click on OK button

Muhammad Saud Khan


IDB CREATION PROCEDURE
Click on OK button

Click on OK button if dedicated E1.

Muhammad Saud Khan


IDB CREATION PROCEDURE

DefineTEI Value is 62.

Define External Alarm

Muhammad Saud Khan


IDB CREATION PROCEDURE

Muhammad Saud Khan


IDB CREATION PROCEDURE
Define External Alarm Type(Closing/Breaking)

Write the Alarm name in Comment and severity type

Muhammad Saud Khan


IDB CREATION PROCEDURE

Define RBS tpye (RBS GSM)

Define Master Transmittor Chain Delay is 17784 and Master Slaver ESB Delay 4635 and then Click on
APPLY button

Muhammad Saud Khan


IDB CREATION PROCEDURE
Verfiy after click on APPLY button new Value is -4635

Click on OK button

Muhammad Saud Khan


IDB CREATION PROCEDURE

Please verify DUG on local Mode and the click YES button.

Muhammad Saud Khan


IDB CREATION PROCEDURE
After install IDB click on configuration then Define button and then select Present RUs……

Define Present RUs….

Muhammad Saud Khan


IDB CREATION PROCEDURE

Muhammad Saud Khan


IDB CREATION PROCEDURE
Select Cabinet 0 tab and verify your RUs… Position is

Check your Feeder Jumber connection .

GOOD LUCK