Professional Documents
Culture Documents
1:1
1:2
Record of Regular Review of SIP/ AIP
Copy of SIP/AIP duly signed by stakeholders
Improvement by stakeholders (written suggestions and comments for improvement)
Continuous Improvement Project
Information on the conduct of review (sending of letters)
Memorandum on the conduct of Review
Review of Status (Minutes, Attendance, Notice of Meeting, Pictures and Narrative)
Work plan
1:3
Organizational Chart of different Committees/School Planning Team with specified roles and
responsibilities
Alumni Association SEC Registration
Initiated Projects of different organizations
Copy of School Handbook/ By-laws of PTA, SGC and SPG
Accomplishment Report
Resolutions
Display of Organizational Chart
Student Handbook
1:4
MOA
Minutes of Meeting
Adopt a School
Brigada Eskwela
Guidance Records
Request Letter/Invitation
Grievance Committee
Communication Networking
Letters and other invitations received and sent to different persons
Invitations
Minutes of Meeting with Solution
Communication Letter to Barangay Chair
Open channel of Communication (Networking)
1.5
2.1
Accomplishment Report
Record of Bench marking
Improvised/Localized Materials
Narrative on the Utilization of Instructional Materials
Mentoring
Module/ MISOSA
Action Research
Result with Recommendation
Contextualized Materials / Prototype Lesson Plan
2.2
Benchmarking
Localized Materials in the community
History of the Barangay
Proof of Utilization (documents on the demonstration teaching)
Documents showing the utilization of localized/contextualized
Contextualized materials – SSP
Best Practices in Localized Curriculum
2.3
M and E Results
Learning Resource Evaluator
Summary of Evaluators comments
Symposium/ Orientation
Approved Lesson Plan
Localized workbook used by pupils with progress chart for tracking pupils’ performance
Assessment Result
Localized Instructional Materials
History of Barangay
Interview, Survey, Questionnaire
Symposium Workshop
2.4
Minutes of meeting
Standardized Monitoring Tool
Localized Monitoring Tool
Result of Evaluation
2.5
Monitoring and Evaluation and Reporting of the Result of Project Implementation
Supervisory Plan/ Report
Result of Phil- Iri/ PBF/ Periodical Test, Quarterly Results with analysis
Result of Numerates and Non- Numerates
Implementation of Different Schools Programs and Projects
Reading interventions in collaboration with parents
2.6
Pupils/Students Handbook/Manual
Child Protection Committee
GAD
Child Friendly School Sytem
Guidance Programs
CFSS Survey Form
2.7
Learning Resource Center
Community library
Localized learning materials
Availability of Learning Resource Center in the Barangay
Involvement of pupils in community based training for youth
Utilizing HUBS available in the community
Compendium of PT’s
Pupils’ Portfolio
Exhibit of Best Pupils Output
PRINCIPLE 3: ACCOUNTABILITY
3.1
Root Cause Analysis on school problems
Roles and Responsibilities of each member of organization
Organizational charts and by laws including their roles and responsibilities
School memo re: designation of School Personnel and Roles and Responsibilities
Constitution and By-laws of PTA/ SPG / Faculty and Others
3.2
Recognition of Stakeholders/Awards
Gap Analysis
Analysis of PIA’s
Target vs Accomplishments
Localized school guidelines for A and R
3.3
Recognition of Stakeholders’ / Awards
Rewards System
Stakeholders’ Day ( with guidelines on the selection of winmners)
3.4
SGC roles and Responsibilities
Documents showing Stakeholders’ Feedbacks/Comments/Suggestions on the Implementation of PPA’s
Summary of Revisions made by the Team
3.5
Conduct of PTCA
Periodic Assessment Results
Parent-Teachers Conference
Periodic Assessment of Stakeholders through PTCA
Results of Periodic assessment
SRC Attendance
Formulation of Feedback Mechanism
SOSA
4.2
4.3
MOOE/SBFP Liquidation Report
Record of Meetings Conducted
PTA Projects
Assessment Tools
4.4
Invitation
Monitoring and Evaluation Tools
Regular Meeting with Community Stakeholders on Monitoring Evaluation and Reporting of Resource
Management
Communication Networking
E-SIP Planning
PTA Programs and Projects
School Programs/Projects
4.5
MOA ( Memorandum of Agreement)
Meeting of Stakeholders
Rewards/ Recognition for the Stakeholders
Pledge of Commitment