You are on page 1of 1

36" E

N 3°
06'

36" E
53'
N 3°

36" E

36" E
06'
24" W

N 3°

06'

06'
N 3°

N 3°
3 Spa
-0"
Phase 3

8 Spa at 9'

at 18'

-6"

-0"
4 Spa at 15'

4 Spa at 14'
-6"

11'
2 9'-0" Dia

-7
casing

1
2"
11'
� Bent #3 � Bent #4 � Bent #5
-8"

23'
-9"
Sta 243+80.00

-0"
Sta 245+00.00

-0"
Sta 246+25.00
8'

-4

-6"
-0"

-0"
-4"

9'

9'
24'
1
22'

23'
2"
4'

21'
Sanitary sewer
Phase 2

-0"
-0"
and manhole
� IH 10 and PGL

-3"
-8"

18'
18'
25'
8'
-0"

-4

-6"

-0"
-4"
22'

9'

24'

23'
1

-0"
4'

-0"
2"
-6"
-8"

9'
9'
15'
8'

Begin bridge � Bent #2

-10

-0"
Abut #1 Sta 242+40.00

-6"

4 Spa at 14'
Face of backwall

4 Spa at 15'
2"
3 Spa
Sta 241+25.00
-0"
8 Spa at 9'
Phase 4

at 17'
7°0'0"

-0"

1 4 Pile footings typical at Bents 2-7, unless


otherwise noted. See Common Foundation
Details (FD) standard sheet for details.

2 Permanent casing must extend a minimum of 5 ft


below the lowest point of sanitary pipe in the
vicinity of the casing at Bent #2. Provide
2 ft Min clearance between pipe and permanent
casing. Casing must be drilled and placed.
Do not vibrate casing. Permanent casing is subsidiary
to Item 409, "Prestressed Concrete Piling."

Notify City 24 hours prior to driving permanent casing.


Contact Jane Doe, P.E. 512-555-1234. HL93 LOADING

Bridge
Division

FOUNDATION
LAYOUT

SH 87 OVERPASS

FILE: DN: CK: DW: CK:

C TxDOT CONT SECT JOB HIGHWAY

REVISIONS

DIST COUNTY SHEET NO.

You might also like