Professional Documents
Culture Documents
Slab Beam #1: Rock Creek Bridge Layout
Slab Beam #1: Rock Creek Bridge Layout
FLOW
-0"
-0"
:1
3
17'
17'
3
:1
N
-0"
1'
-0"
Shldr
354'Phase I
Armor joint Face of T223 rail
10'
End bridge
0%
(sealed) � Slab Beam #1
4.
Face of bkwl
-0"
Abut #4
23'
Sta 821+59.00
635'
Elev = 428.08'
-0"
20.
Lane
� Bent #2 � Bent #3
~
CSAB
-0" Roadway
12'
-0" Overall
Const jt
0%
2.
Sta 820+79.00 Sta 821+29.00
2.
� IH 31 & PGL
625'Phase II
821+00 822+00
-0"
46'
0%
~
44'
CSAB
Lane
2.
12'
Begin bridge
Armor jt
-0"
Face of bkwl
(sealed)
Abut #1
23'
Sta 820+49.00
-0"
0%
Shldr
25.
Elev = 428.08' 20'-0"
2.
10'
20'-0" BAS-C
Face of T223 rail � Slab Beam #9
BAS-C
-0"
1'
1 Remove existing riprap between eastbound
26
-6
to be removed
4"
existing eastbound bridge abutments.
1
3:1 3:1
1
2
"
'-5
23
Test Hole #B-20
Sta 820+43.22, 32' rt
1 All bents are on bearing
Limits of riprap
N 9°44' 7 62"W.
6(6) 7(6)
6(6) 7(6) I K
Finished ground = 6' D MARL, Hard, Gray
= 6'
370 REVISIONS