SGT-750 Industrial Gas Turbine
The Siemens SGT-750 set new standards for efficiency and reliability in the industrial gas turbine segment.
It was designed to deliver top-class performance, with a compact footprint, combined with extreme robustness
and optimized serviceability. Now, after proving itself during years of operation, it stands out as an absolute
industry benchmark, reaching for higher levels of lifetime customer value.
3
The SGT-750 gas generator
can be swapped in less than
24 hours. The gas generator
is rolled out with standard
maintenance tools.
4
Onsite and offsite
Maintenance Cycle maintenance is the two
alternatives of doing
planned service for the
Operating SGT-750. For offsite
hours maintenance the core that
x 1,000
will be served is swapped
0 34 68 102 136 keeping the downtime of
your equipment to an
absolute minimum. For
onsite maintenance the
core will be served and the
A B C service can be made on site
or in a local workshop. The
On-site borescope Hot sections parts replacement. Complete turbine overhaul
typical four years of base
inspections. Can be performed off-site can be performed off-site
load operation before the
using the replacement concept using the 68,000 hours
machinery is open the first
34,000 and 102,000 hours. replacement concept.
time, is an outstanding,
market leading figure in
itself. Yet, with lower
Offsite Maintenance Onsite Maintenance loads and fully customer-
managed inspections, time
1 day A-inspection (Borescope) 1 day A-inspection (Borescope) between overhauls can be
easily increased by several
2 days B-inspection (Gas Generator 12 days B-inspection (Hot Section thousands of hours.
Exchange) Inspection)
5 days C-inspection (Gas Generator 16 days C-inspection (Major Overhaul)
Exchange with Power Turbine Inspection)
Maximized Uptime –
17 Maintenance Days in 17 Years
Maintenance cycle
The maintenance cycle, based on onsite and offsite
maintenance, gives a recommendation for preventive
maintenance where all aspects are covered regarding
replacement parts and manpower. It includes all auxiliaries
and driven equipment as well accounting for load
variations, site conditions and fuel quality.
Optimized spare part consumption
An optimized replacement schedule including component
refurbishment ensures maximum usage of hot gas
path components and lowest life cycle cost. On-site
parts storage is optimized to include only operation
consumables and operation back-up parts, since
components needed for planned maintenance are
Availability facts
delivered from Siemens in time for the respective
Robust DLE system, does not require tuning of
maintenance outages.
combustion system due to seasonal changes
Customer availability 17 days in 17 years maintenance concept
Siemens has extensive experience in the maintenance
24 hour gas generator swap from load to load
and field service of gas turbines spanning over 50 years.
Project management is our specialty. Our experience Option to choose between on- or offsite maintenance
gained in hundreds of successful projects enables us to 34,000 operating hours between hot parts inspection
plan each inspection exactly. And we never leave a site and 68,000 operating hours between major overhaul
until everything is up and running properly. for base load operation
5
SGT-750 Technology and Performance
1 Single rigid compressor rotor body 4 13-stage axial-flow compressor
The rigid rotor body is the foundation of the rotor stability The compressor is a 13-stage axial flow compressor with
in the SGT-750. This stability enables more uniform and a 23.8:1 pressure ratio. It offers a controlled diffusion
smoother run-ups in all conditions airfoil for high efficiency. The axial blade attachment
2 Horizontal and vertical split casings
grooves allow complete compressor reblading without
rotor removal.
Horizontal split for unbeatable accessibility in the
compressor and vertical split for optimized clearances 5 Bearings and balancing planes
and stability in the turbine. This combination of casing The rotor is supported by mineral-oil-lubricated long-life
design unites the best qualities of two concepts into one. tilting pad bearings. Five easy-to-reach balancing planes
3 Variable guide vanes
allow field balancing without disassembly.
Two variable guide vanes in the compressor offer opti-
mized performance even in the most extreme conditions.
4
3
1 5
2
6
6 Can combustors with DLE burners 8 Online monitoring
The can combustion chamber system consists of eight All SGT-750 are mapped with infrared (IR) cameras
cans with a double-skin serial-cooled design and eight during engine delivery test and during regular
transition ducts of double-skin parallel-cooled design, scheduled inspections.
suitable for both liquid and gaseous fuels. This can design Early warning – faster maintenance
provides for excellent maintainability and easy-access The IR cameras enable early detection of possible
exchangeability without casing disassembly. deviations, helping to keep the turbine in a good,
7 Two-stage compressor turbine
healthy condition. The IR images also speed up the
service procedure by giving accurate diagnostic
The two-stage compressor turbine blades are made of
information to technicians.
state-of-the-art proven materials with several years of
confirmed performance. The blades and guide vanes are 9 Two-stage high-speed free power turbine
cooled with a combination of internal convective cooling The free turbine is a two-stage high-speed module,
and film cooling. nominally running at 6,100 rpm.
5 7
7
SGT-750 for Power Generation
Compact and reliable Applications for power generation
Siemens offers a wide range of solutions for power
The SGT-750 makes a perfect option for power generation
generation, from stand-alone installations to complete
applications. The fast start-up and cycling capability
power plants.
both support intermediate to continuous operation with
improved turndown capability. Through the use of a free Industrial power generation
power turbine, the SGT-750 is also well suited where Simple-cycle and combined-cycle power plants for
grid requirements call for maintained power in case of base load, standby power and peak lopping.
frequency drop. Siemens Dry Low Emission combustion
Cogeneration for industrial plants with high heat
system optimizes fuel use and minimizes NOX emissions,
load and district heating schemes.
all to contribute to highest profitability and lowest
environmental impact. Power generation in the oil and gas industry
Onshore: for oil field service, refinery applications ,
Lightweight construction offers leading
emergency and standby power generation, including
weight-to-power ratio
highly efficient cogeneration solutions for oil & gas
Small footprint means easy fitting applications.
Modular and flexible package design Offshore: on oil platforms and FPSO (Floating
Production, Storage & Offloading) vessels.
Single-lift capability
Reliability >99%
8
SGT-750 for Mechanical Drive
Robust and reliable Applications for mechanical drive
Siemens offers a full range of extended scope and turnkey
The SGT-750 with its twin shaft configuration is designed
solutions for mechanical drive applications. Utilizing
for mechanical drive, driving compressor or pumps either
decades of experience, no application in any environment
onshore or offshore. The free power turbine enables the
is impossible.
turbine to start with a minimum of starting power even
when connected to fully pressurized compressor loops. Compressor applications
The robustness and built-in serviceability provides Gas injection, gas processing, LNG , pipelines as well as
minimum downtime days and ensure maximum customer other oil & gas applications.
value.
Air separation and petrochemical industry.
Minimized starting power
Pump applications
High starting torque Water injection and fluid transmission applications.
Variable compressor speed, 50-105%
High load on low power turbine speed
Reliability >99%
9
SGT-750 Performance Data
50 50
130
45 45
130
Base load
Base load
0
12
40 40
0
12
He
at 00 ISO rated point
ra 90 He
te at
(k
J/k ISO rated point ra 00
Electrical power output [MW]
te 88
W (k
h)
0
W
11
h)
35 35
0
11
9200
9000
950
0
0
10
95
30 30
Exhau
00
10
10
st
)
00 10
s
g/
0 00
temp.
(k
0
)
w
s
g/
flo
(k
st
(°C)
u
flo
ha
90
11
st
Ex
11 00
u
00
475
ha
0
90
0
Ex
25 25
450
425
400
12
12
375
00
Exhau
00
0
350
0
325
st tem
14
14
00
0
00
475
0
p. (°C)
450
425
400
20 20
375
350
325
80
15 15
–50 –40 –30 –20 –10 0 10 20 30 40 50 –50 –40 –30 –20 –10 0 10 20 30 40 50
Compressor intake air temperature [°C] Compressor intake air temperature [°C]
10
40
ISO rated point
Base load
35
9000
0
11
0
50
30
Shaft power output [MW]
9500
5
47
0
11
)
25 g/s
(k
w
0
flo
45
10000
ust
ha
Ex
)
(°C
te 25
p.
4
90
m
20 11000
st
u
ha
Ex
0
40 12000
Heat rate (kJ/kWh)
80
15
5
37
14000
10
3000 3500 4000 4500 5000 5500 6000 6500
Power turbine speed [rpm]
Nominal performance
SGT-750 Mechanical Drive
Gaseous fuel
11
Published by
Siemens AG 2015
Power and Gas Division
Distributed Generation
Freyeslebenstrasse 1
91058 Erlangen, Germany
For more information, please contact
our Customer Support Center.
Phone: +49 180 524 70 00
Fax: +49 180 524 24 71
(Charges depending on provider)
E–mail: support.energy@siemens.com
Article-No. PGDG-B10001-00-7600
Printed in Germany
Dispo 34806
K12 130014, WS 07151.5
All rights reserved. Trademarks mentioned in
this document are the property of Siemens AG,
its affiliates, or their respective owners.