You are on page 1of 2

भार त सर क ार रे ल मं ालय

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS

Signature Not Signature Not


Verified Verified
अ नुसं ध ान अ िभक प और मानक सं ग ठन , लखनऊ - 226011
Digitally signed by V Digitally signed by
S NAGPURE RESEARCH DESIGNS AND STANDARDS ORGANISATION, LUCKNOW - 226011 JANARDAN BALKUWAR
SINGH
Date: 2021.07.29 Date: 2021.08.05
15:55:38 IST िनर ी ण माण प 16:52:11 IST
Reason: Counter Signed
Reason: Sign IC
Location: INSPECTION CERTIFICATE IC
Location:

माण प सं . िक त : िदनांक :
Certificate No.: RDSO/IC/QAST/MUMBAI/A/2021/000629 Installment: 01 Dated. 29/07/2021
ेषण ापन सं . िदनांक :
Despatch Memo No: RDSO/DM/QAST/MUMBAI/A/2021/000629 Dated. 29/07/2021
क ओर से िनरी ण :
Inspection on behalf of: The President of India
य आदेश / िनिवदा सं . : िदनांक :
P.O./Contract No.: 05215033100837 Dated. 17/05/2021
मूल ा कता :
Consignee: SSE(SIG)/SOUTH/KUR (CC:028320)
ारा िदया गया :
Placed by: DYCMM -II, Office of the Principal Chief Materials Manager,
East Coast Railway,
Second Floor, North Block, Rail Sadan,
Chandrasekharpur, Bhubaneswar-751017 (Odisha)
फम का नाम :
Firm's Name: ULTRACAB INDIA LTD-RAJKOT
कायालय का पता :
Office Address: SR NO 262 B/H GALAXY BEARINGS LTD SHAPAR VERAVAL, RAJKOT - 360024
काय थल का पता जहां िनरी ण िकया :
Work address where inspection carried out: M/s ULTRACAB (INDIA) LIMITED. SR NO 262 B/H GALAXY BEARINGS LTD
SHAPAR VERAVAL, RAJKOT - 360024
िनरी ण करने क ित थ :
िनरी ण हे त ु साम ी तुत िकये जाने क ित थ :
Date of Inspection: 19/07/2021 to
Stores offered for inspection on : 10/07/2021
22/07/2021
य आदेश / ठेके के अनुस ार साम ी देने क अंितम ित थ :
Last date of delivery as per P.O. / Contract: 20/08/2021

साम ी का िववरण PO Sr: 002 PL No: 5611N002 PVC insulated, armoured unscreened underground Railway signalling cable
Description of (Copper conductor)Size 06 core X 1.5 sq mm as per RDSO Specification No.IRS-S/63/2014 (Rev-4.0) or latest.
Stores

आदेिशत मा ा तुत क गई साम ी क मा ा अब पास क गई मा ा अ वीकृत साम ी क मा ा यु


Quantity on order Quantity tendered for inspection Quantity now passed* Quantity rejected Consumed

0.5 Km
0.51 Km 0.51 Km 0 Km 0 Km
( + 2% tolerance )
* Quantity now passed does not include quantity consumed in testing.
Remarks: Drum number: 0004 Please refer annexure for length and hologram details. Quantity ordered is 0.5kms, quantity offered
is 0.52kms but due to 2% restrictions on IREPS site, this quantity is not accepting. So offered quantity is shown as 0.51kms instead
of 0.52kms. So quantity consumed in testing is shown 0kms instead of 0.008kms. And quantity accepted is 0.512kms instead of
0.51kms.
Remarks for Destructive Testing: 8 meters consumed in testing
Test Check done on 29/07/2021 by ARVIND KUMAR AIE
िनरीि त साम ी पर सील का ित प :
Serial numbers of hologram: SAAR089344 to SAAR089345 (TC modification- NIL)
मािणत िकया जाता है िक / Certified that :

1. ऊपर विणत मद को अंितम प से िनरी ण करके पास िकया गया।


Items mentioned above were finally inspected and passed.

Page 1/2
2. ये मद िनधा रत समय के भीतर अथवा स म ा धकारी ारा बढ़ाई गई अव ध म दे िदये गये थे।
These items were tendered within the time stipulated ( or as extended by the competent authority)

3. मद िनरी ण एवं पास करने वाले अ धकारी/कमचारी के नाम, पद एवं ह ता र मोहर सिहत।
Name, Designation & signature of Inspecting official(s) with stamp.

Created and Digitally Signed by: Digitally Countersigned by:


NAGPURE VIKRANT Designation and Name of countersigning officer
SSE-II/QA/SNT/BB may be seen from the signature stamp on top
right corner of this document.

ित लिप अ सा रत / Copy forwarded to:

1. Bill paying officer


2. Office copy
3. ULTRACAB INDIA LTD-RAJKOT SR NO 262 B/H GALAXY BEARINGS LTD SHAPAR VERAVAL, RAJKOT - 360024
4. SSE(SIG)/SOUTH/KUR (CC:028320)
5. Spare copy

िट पणी / Note:

1. भुग तान तभी िकया जाए जब िक माण प ा धकृत राजपि त अ धकारी ारा ित ह ता रत हो
Payment should only be made when the inspection certificate digitally counter signed by an authorized Gazetted Officer.

2. यह माण प साम ी वीकार करने हे त ू जारी होने क ित थ एक माह हे त ु वैध है।


This certificate shall be valid for one month from the date of issue for receipt of material.

Page 2/2

You might also like