Professional Documents
Culture Documents
Sender #J000853
Fixed TRAVEL TIME: 0min
Pro-Pac Packaging Group JOB ACCEPTED: 07:30 AM
147/151 Newton Rd, Wetherill Park 2164, NSW Australia DEPART TO PUP: 07:30 AM
LOADING COMP.: 12 Ton Tautliner
DATE RECEIVER CONSIGNMENT DETAILS JOB TIMES NAME AND SIGNATURE TIMESTAMP
02 July 2021 ARB PRESTON ( NSW DC ),ARB PRESTON ( NSW DC ) PLAIN STANDARD DEPARTURE: 07:30 AM CJ JG GI HCOH GK I 2021-07-02
C001076 230 Hoxton Park Rd, Prestons 2170, NSW Australia QTY: 14 DEL ARRIVE: 07:55 AM 08:22:43
Completed WGT: 2800.00 DEL COMPLETED: 08:22 AM
CUB: 26.21
02 July 2021 HUON AQUACULTURE GROUP LTD,HUON AQUACULTURE GROUP NR Pallet DEPARTURE: 09:06 AM JG JF J FUSZJFXJGCO 2021-07-02
C001078 LTD QTY: 1 DEL ARRIVE: 09:15 AM 09:24:53
Completed WGT: 540.00 DEL COMPLETED: 09:24 AM
6 Inglis Rd Ingleburn NSW 2565 CUB: 1.30
02 July 2021 TECHWARE SUPPLIES,TECHWARE SUPPLIES PLAIN STANDARD DEPARTURE: 12:13 PM GJDYO VMXGK 2021-07-02
C001080 QTY: 1 DEL ARRIVE: 01:22 PM 13:33:16
Completed 13 Rachael Clos Silverwater NSW 2128 Australia WGT: 180.00 DEL COMPLETED: 01:33 PM
CUB: 1.30
02 July 2021 TESUCO PTY LTD HEAD OFFICE,TESUCO PTY LTD HEAD OFFICE BUBBLE DEPARTURE: 01:33 PM UII GDOKC 2021-07-02
C001081 QTY: 3 DEL ARRIVE: 01:37 PM 13:47:04
Completed 110-120 Silverwater Rd, Silverwater 2128, NSW AUS WGT: 96.00 DEL COMPLETED: 01:47 PM
CUB: 6.48
VOID
QTY: 1
WGT: 12.00
CUB: 2.02
02 July 2021 KOKO JOY AUSTRALIA GROUP,KOKO JOY AUSTRALIA GROUP PLAIN STANDARD DEPARTURE: 01:47 PM IGCOHC GI JGZFH 2021-07-02
C001082 QTY: 1 DEL ARRIVE: 02:18 PM 14:38:18
Completed 24 Frederick St Fairfield NSW 2165 Australia WGT: 140.00 DEL COMPLETED: 02:38 PM
CUB: 1.15
02 July 2021 Cavos Products,Cavos Products PLAIN STANDARD DEPARTURE: 02:38 PM MV KH GK CYOCKHC 2021-07-02
C001083 QTY: 1 DEL ARRIVE: 03:15 PM 15:38:14
Completed 8 Wordie Pl, Padstow 2211, NSW Australia WGT: 460.00 DEL COMPLETED: 03:38 PM
CUB: 1.30
02 July 2021 SOUTH PACK LABORATORIES,SOUTH PACK LABORATORIES PLAIN STANDARD DEPARTURE: 03:38 PM SUDG HICIGC 2021-07-02
C001084 QTY: 1 DEL ARRIVE: 04:06 PM 16:17:32
Completed 102 Bath Rd, Kirrawee 2232, NSW Australia WGT: 120.00 DEL COMPLETED: 04:17 PM
CUB: 1.01
BREAK START JOB BREAK END BREAK END BREAK ON JOB TOTAL BREAK
02 July 2021 03:15 PM 02 July 2021 03:38 PM 02 July 2021 03:38 PM 22min 22min