IFSU-QMS-QMR-F001
Rev. 00(Feb.04,2019)
RISK AND OPPORTUNITY REGISTER
S Forwarding of TWG Unavailability of Delay of Log sheet 2 4 8 tolerable Purchase of 2 3 6 Medium SPO On time
P Procurement designated TWG on Acceptance of Communica risk cell card for tolerable Personnel inspection and
O Document Package the day of delivery Procured tion thru continuous risk acceptance of
to the designated SME’s SMS Notification deliveries
TWG for inspection
Delayed thru text
payment of message or
goods call
Additional
TWG
S Issuing of goods End user Requesting Delayed Log sheet 2 4 8 tolerable Purchase of 2 3 6 Medium SPO On time
P and preparation of officer is not payment of Comminatio risk cell tolerable Personnel issuance of
O report available for the goods n thru SMS card/Load for risk goods and filing
signature of continuous of documents.
RIS/PAR/ICS notification
thru text
message or
call
Issuance of
notice of
supply
availability
S Issuance of End user Misplaced or Loss records Keeping 2 4 8 tolerable Purchase of SPO Availability of 2020
P requested missing records original copy risk scanner to Personnel file copies
O documents and issuing back up
photocopy documents
to
requesting
parties.
S Storage of Procured SPO Staff Lack of proper Fast Notifying 4 5 20 High Purchase of SPO Immediate 2020
P SME’s for issuance storage facility depreciation availability unacceptable quality Personnel delivery of SME
O of stored of supplies risk storage rack if requesting
goods and to end user. and officer is
time renovation of available
consuming in building
IFSU-QMS-QMR-F001
Rev. 00(Feb.04,2019)
RISK AND OPPORTUNITY REGISTER
retrieving
supplies
S Retrieval of End User Unidentified user Failure to Conduct 2 4 8 tolerable Recommend SPO Identified
P unserviceable and details of drop the item scheduled risk to all personnel detailed
O Equipment equipment in the journal inventory department information of
entry voucher to delegate equipment
property
custodian.
PROBABILITY
Might occur Could occur Could occur in Is expected to Will occur on
once in ten occasionally many occur in most every occasion
(10) years (e.g. possibility of circumstances circumstances (e.g. >90%
(e.g. <5%) happening once a (e.g. probable to (e.g. More than chance)
in five (5) years happened every once a year /
between 5% and few years between 50%
10% chance) between 10% and and 90% chance)
50% chance)
IMPACT
IFSU-QMS-QMR-F001
Rev. 00(Feb.04,2019)
RISK AND OPPORTUNITY REGISTER
IFSU-QMS-QMR-F001
Rev. 00(Feb.04,2019)