JOHN PAUL B DALIOPAC

2017100930
BS-EMT4P1
PIT/ FINAL EXAM (FINAL TERM)

TITLE: COMPANY’S OPERATIONS MANAGEMENT


MEGASOFT HYGIENIC PRODUCTS, INC.
MEGA SOFT GROUP group has a number of famous Global Hygiene Brands including
CHIKOOL, TWINS, LAMPEIN, SISTERS, CECILLE, TRANSCEND and GRAND.
October 2000 A group of young entrepreneurs MEGA SOFT HYGIENIC PRODUCTS,
INC, the company aims to provide Filipino women with alternative, affordable, feminine
products now known as SISTERS SANITARY NAPKIN AND PANTYLINER. The venture
began with a plant set-up in the Philippines.

the

competitive priority of the

company

Principle of integration: A good layout is one that integrates men, materials,


machines and supporting services and others in order to get the optimum
utilization of resources and maximum effectiveness.
`
Principle of minimum distance: the distance of buildings to each others is almost 200meters
and the machine distance from the other machine is 6 meters apart.
Principle of cubic space utilization: The vertical clearance of the building is 30meters free
from trouble because it is open ceiling

Principle of flow: the whole way is design from the specific forklift access only and the
manpower has its own path to avoid from accident from forklift and the materials coming

Principle of maximum flexibility: The machines are intact and easy to disassemble and
install. The area is wide enough from future upgrade for renovate.

Principle of safety, security and satisfaction: the machine is design from avoid accident
during operations because it has clearance distance from operators to machines, machines
also has cover doors and indicators so that the operator knows the problems.

Principle of minimum handling: A good layout is one that reduces the material handling to
the minimum

OFFICE BUILDING NO.2


MATERIALS STORAGE

BUILDING NO.1

Machine shop

DING NO.7 PRODUCET STORAGE

BUILDING NO.6
BUILDING NO.5
DELIVERY AREA OF PRODUCTS

M1 M2 M3 M4

PROCESS CHART – DIAPER PRODUCTION

Dist. (m) Time (Min) Symbols Process


Transport materials
25m 2mins from building no. 2 to
production area.
Prepare to mount
2mins materials in
machines.
Mixing materials in
. 1min machines from
crusher to mill fan.

Physical inspection
6m 5mins from Q.C.
6m 1min Packing section
Transfer to building
100m 5mins no. 7 temporary
storage
Preparation from
300m 1440mins (24hrs) office building no. 1.
Transfer to building
150m 10mins no. 5 for Delivery.

Mega soft company employ Automation control system. They use pneumatic as a source of
their power inputs to drive the components of the machines. Operated with Programmable
Logic Circuit like Nordson, Seimens and Fiesto Brand. They are not using hydraulic power
inputs because the product they produce is clean cotton they avoid dirt so they use pneumatic
system.