Professional Documents
Culture Documents
KEY PLAN
1600 1600
EN
D DEVPRAYAG
PA CH 33+210 - 35+455 Scistosity CH 33+210 - 35+455 Scistosity
CK ST. CH 35+610 - 37+335 Scistosity
AG
T6 - P2
T6 - P1
E
T5 - P1
T4 - P2
T4 - P1
T5 - P2
3- 1500 1500
CH
:
47
+3
STA
60.0
0
1400 1400
ACK
AGE
1300 1300
3-C
T7 - P1
T7 - P2
CH 33+210 - 35+455 Joints and Faults CH 33+210 - 35+455 Joints and Faults CH 35+610 - 37+335 Joints and Faults
H: 3
3+09
1200 1200
00 7.
1100 1100
TUNNEL 5
TUNNEL 6
TUNNEL 7
TUNNEL 4
ESCAPE T 5
BYASY
Bridge No 4
Bridge No 5
Bridge No 6
Bridge No 7
ST.
1000 1000
LEGEND Co
900 900
QUATERNARY COVER
Eluvial - colluvial deposits (Co) Co
Product of physical degradation (colluvial) and on site chemical alteration of the
shallower rock mass (eluvial deposits). They are generally a chaotic, or only
poorly classed deposit with angular rock fragments within a variable percentage Co
of a sandy to clayey matrix. 800 800
Ɛtdh
Actual river bed deposit (Q2fc) and Recent river bed deposit (Q2fr) Co
Silt, fine to medium grained sand, gravel, pebbles and boulders. Co
T4P1 - CH 33+390.00
Stratified cyclic sequence of boulders, cobbles, gravel, sand silt and clay
T4P2 - CH 35+435.00
T5P1 - CH 35+620.00
Ɛtdh
Alluvial Fan (Q2fa) and Debris Alluvial Fan (Q2fda) Ɛtdh
Gravel. Sand, greyish brown silt and clay.
Ɛtdh
Co
600 600
Deep Seated Gravitational Landslide (DGPV)
BH49 (70m) DGPV
SUB-HIMALAYA Co Ɛtd BH50 Co
Q2ft BH52 (47m)
BH47 (30m) BH48 (30m) Pg12s (70m)
Siwalik Group [Miocene to Pliocene] Pt² 3kk
BH46 (30m) BH51 DGPV
Lover Siwalik (N 1s) and Middle Siwalik (N 1 2s) 500 Q2ft 500
(35m) BH52-1
Fine to medium grained relatively matured continental sediments, sandstone, Q2fc (30m)
conglomerate and siltstones. Pg12s
Co Pt¹3jm Q2fc
Ɛtd
OUTER LESSER HIMALAYA
Subathu Formation (Pg12s) [Paleocene-Eocene] 400 400
Greenish grey and purple splintery shale with fossiliferous limestone lenses.
350m a.s.l.
Tal Group [Early Cambrian] 350
486.01
485.91
485.71
485.51
485.31
478.21
478.01
477.81
477.61
470.51
470.31
470.11
471.11
471.31
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.70
488.64
488.47
488.28
488.08
487.88
487.68
487.49
487.29
487.09
486.89
486.70
486.50
486.30
486.10
485.12
484.92
484.72
484.52
484.33
484.13
483.93
483.73
483.54
483.34
483.14
482.95
482.75
482.55
482.35
482.16
481.96
481.76
481.56
481.37
481.17
481.07
480.97
480.77
480.58
480.38
480.18
479.98
479.79
479.59
479.39
479.19
479.00
478.80
478.60
478.40
477.42
477.22
477.02
476.82
476.63
476.43
476.23
476.13
476.04
475.84
475.64
475.44
475.25
475.05
474.85
474.65
474.46
474.26
474.06
473.86
473.67
473.47
473.27
473.07
472.88
472.68
472.48
472.28
472.09
471.89
471.69
471.49
471.30
471.20
471.10
470.90
470.70
469.92
469.77
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.73
469.76
469.88
470.09
470.29
470.49
470.60
470.70
470.90
471.52
471.72
471.93
472.13
472.33
472.54
472.74
472.95
473.15
473.36
Undifferentiated Dhaulagiri Formation ( Ɛ tdh) and Deo ka Tibba RAIL LEVEL
Formation ( Ɛtd)
521.41
551.31
493.99
485.05
474.08
458.09
445.29
441.20
448.96
448.69
454.84
474.53
492.62
497.43
556.29
537.24
507.55
501.24
507.64
519.57
532.92
537.12
542.06
547.59
553.19
556.93
543.00
542.49
551.77
559.63
677.91
562.11
813.31
886.91
922.61
787.71
789.61
777.71
583.71
564.81
585.41
571.82
582.64
585.97
592.92
598.69
604.45
612.94
620.29
628.80
638.64
650.27
663.54
677.12
691.55
715.74
777.14
831.48
849.82
868.39
904.28
910.29
913.93
915.13
916.74
918.77
921.08
923.09
933.59
949.68
966.78
979.13
986.73
965.97
946.50
927.44
905.99
886.37
869.36
853.55
842.53
832.16
821.65
806.89
782.92
798.00
809.16
818.86
829.09
840.08
850.79
861.37
853.06
832.30
817.69
718.44
698.79
691.32
664.35
651.72
645.14
638.27
623.22
607.26
589.48
552.37
560.44
567.33
583.04
590.44
546.46
533.77
530.04
536.83
554.03
570.18
598.34
610.87
701.37
706.16
710.46
732.76
755.15
796.73
790.17
785.87
784.27
784.48
789.78
794.15
762.47
747.85
734.97
709.95
497.60
484.87
477.81
469.44
468.13
476.36
485.82
506.32
511.00
512.66
512.98
508.00
506.94
515.81
520.01
523.58
526.85
530.22
534.26
White to purplish feldspatic gritty to fine grained quartz arenites (Ɛtdh) and GROUND LEVEL
black shale (Ɛtd).
33+080
33+100
33+120
33+140
33+160
33+180
33+200
33+220
33+240
33+260
33+280
33+300
33+320
33+340
33+360
33+380
33+400
33+420
33+440
33+460
33+480
33+500
33+520
33+540
33+560
33+580
33+600
33+620
33+640
33+660
33+680
33+700
33+720
33+740
33+760
33+780
33+800
33+820
33+840
33+860
33+880
33+900
33+920
33+940
33+960
33+980
34+020
34+040
34+060
34+080
34+100
34+120
34+140
34+160
34+180
34+200
34+220
34+240
34+260
34+280
34+300
34+320
34+340
34+360
34+380
34+400
34+420
34+440
34+460
34+480
34+500
34+520
34+540
34+560
34+580
34+600
34+620
34+640
34+660
34+680
34+700
34+720
34+740
34+760
34+780
34+800
34+820
34+840
34+860
34+880
34+900
34+920
34+940
34+960
34+980
35+020
35+040
35+060
35+080
35+100
35+120
35+140
35+160
35+180
35+200
35+220
35+240
35+260
35+280
35+300
35+320
35+340
35+360
35+380
35+400
35+420
35+440
35+460
35+480
35+500
35+520
35+540
35+560
35+580
35+600
35+620
35+640
35+660
35+680
35+700
35+720
35+740
35+760
35+780
35+800
35+820
35+840
35+860
35+880
35+900
35+920
35+940
35+960
35+980
36+020
Deo ka Tibba Formation ( Ɛ td) CHAINAGE 34 35 36
Black chert and shale with phosphate rock and nodule, dark grey splintery shale,
purple micaceous siltstone and calcareous siltstone with minor quartz arenites.
34 35 36
KILOMETRIC SCALE
Krol Group [Neo-Proterozoic]
Kauriyala Formation (Pt ² 3kk)
Grey limestone with interbedded shale, shattered light grey dolomite with occasional
pocket of gypsum as fracture filling and purple and grey shale and limestone.
Reference Structure ID. Tunnel T4 Tunnel T5
Jarashi Formation (Pt ² 3kj)
Red and green shale with few inter-beds of shattered dull grey dolomite with
gypsum as poked and fracture filling.
Overburden (m)
0-50 50-200 200-500 500-1000 1000-1500 >1500
Mahi Formation (Pt ² 3km)
Light grey limestone, marl and interbedded grey to greenish grey calcareous shale. QUAT. QUATERNARY
Structural Domain OUTER LESSER HIMALAYA OUTER LESSER HIMALAYA OUTER LESSER HIMALAYA
COVER COVER
Baliana Group [Neo-Proterozoic] Group Jaunsar Group Tal Group Krol Group
Infra Krol Formation (Pt ² 3bik) Actual river bed
Kauriyala F. (Pt23kk)
Ld
Ld
Variegated purple shale with minor quartz arenites bands. Formation Bijini F. (Pt¹3b) Sabathu Formation (Pg12s) Undif.Dhaulagiri Formation (ɛtdh) Deo ka Tibba Formation (ɛtd) deposits (Q2fc)
Blaini Formation (Pt ² 3bb) Shales with intercalated slate and Limestone and dolomite with interbedded shale.
GEOLOGY
Dark grey laminated shale, quartz arenites, boulder bed and variegated Lithotype Felspatic gritty to fine grained, quartz arenites Black chert and shale
limestone layers/lenses Dark grey laminated shale and quartz arenites
purple and green shales at places with pink limestone lenses.
A1 Faults
Jaunsar Group [Neo-Proterozoic]
Potential geological
Chandpur Formation (Pt ¹3jc) [=Amri Formation (Pt ¹3a)] A3 Karstic forms / Cavities / Voids
Light and dark grey phyllite with interbedded light grey and purple sandstone and
hazards
siltstone and interbedded white laminated flaggy quartz arenites and sericite
A4 Water inflow
quartz schist. A5 Abrasive / Resistant / Hard materials
Mandhali Formation (Pt¹3jm) [=Bijini Formation (Pt¹3b)] A6 In-situ stress anisotropy
Purple sandstone and siltstone; grey phyllite and shale with sandstone bands with A7 River dynamics
occasional diamictite bands; purple greenish grey, greyish white quartz arenite, A8 Slope instability
laminated flaggy quartz arenites and sericite quartz schist.
A9 Swelling clay minerals
Uniaxial
GEOMECHANICS
condition
condition
100-150
Fault - inferred fault compressive
Geomechanical
classification
strength - 50-100
Inferred low angle thrusts and back-thrusts C0 (Mpa) 25-50
< 25
Site Investigation - Borehole location
> 65
Most likely
condition
condition
6% 16 % 78 % 14 % 76 % 13 % 79 % 2% 76 % 5% 78 %
Potential
hazards
Caving 69 % 67 % 11 % 22 % 5% 20 % 2% 32 % 16 % 54 % 13 %
Squeezing 13 % 8% 0% 29 % 2% 29 % 2% 28 % 0% 18 % 4%
Spalling 0% 0% 4% 0% 11 % 0% 14 % 0% 14 % 0% 1%
Support Classes (most likely condition) B 3%; C1 32%; C2 23%; C2* 19%; D 10%; E 10%; F 3% B 6%; C1 49%; C2 20%; C2* 7%; D 6%; E 10%; F 2%
for the tunnels sections only
CLIENT : PROJECT : DESIGN CONSULTANTS: RVNL APPROVAL S. ASONI PROJECT NO. 1062 TUNNEL : -
DESIGNED :
Detailed Design and Project Management Consultancy TITLE :
Services for Construction of Tunnels, Bridges and A. EUSEBIO GEOLOGY, GEOTECHNICS & GEOMECHANICS
CHECKED :
Formation Works from Chainage 33+097 to 47+360 Geological & Geomechanical map
(14.263km) under Package-3 In Connection With New C 08/11/2019 PRE-FINAL DESIGN REVISION C EET AVI Longitudinal section (1/5)
A. VILLA
APPROVED :
Single Line Broad Gauge Rail Link between Rishikesh B 15/10/2019 PRE-FINAL DESIGN REVISION B EET AVI
DRG. NO. :
and Karanprayag (125km) In The State of Uttarakhand, A 14/08/2019 ISSUED AS PRE-FINAL DESIGN KIE AVI RVNL-DD-P3-PFD-D-0206
India REV. DATE DESCRIPTION DRAWN APPD. REV. DATE DESCRIPTION DRAWN APPD.
SCALE : 1:5000
REVISION : C SHEET SIZE : A1
REUSE OF DOCUMENTS : THIS DOCUMENT AND ASSOCIATED DESIGN IS NOT TO BE USED PARTIALLY OR TOTALLY
WITHOUT WRITTEN AUTHORIZATION OF GEODATA S.P.A - ALL RIGHTS RESERVED.