Week 1 (4-9)

Jam Kerja
tanggalproduksi produksi general repair stand by
4 303
5 558.47
6 488.35
7 304.74
8 432.7
9 583
total 2670.26

Week 2 (11-16)
Jam Kerja
tanggalproduksi produksi general repair stand by
11 595.74
12 736.12
13 723.79
14 411.09
15 524.07
16 397.95
total 3388.76

Week 3 (18-23)
Jam Kerja
TanggaProduksi Produksi General Repair Stand By Productivity Total Jam Keterangan
18 491.8 8 6 0 7 61.475 21 85 lubang, 2 mati
19 679.83 9 8.5 3.5 0 75.53666667 21
20 836.1 12.5 5.5 3 66.888 21
21 499.84 11 7 3 45.44 21
22 349.7 6 9.5 2.5 58.28333333 18
23 372.17 8.5 4 8 0.5 43.78470588 21
total 3229.44 55 40.5 20 7.5 58.71709091 123

Week 4 (25-30)
Jam Kerja
TanggalProduksi Productivity Total Jam
Produksi General Repair Stand By Keterangan
25 382.06 8.5 9.5 3 0 44.94823529 21 41 lubang, 1 mati
26 453.41 6 10.5 4.5 0 75.56833333 21
27 437.02 11 4 5.5 0.5 39.72909091 21
28 605.28 11 10.5 0.5 0 55.02545455 22 82 lubang, 2 mati
29 826.69 11 7 0 0 75.15363636 18
30 303.94 8 6.5 3.5 0 37.9925 18
total 3008.4 55.5 48 17 0.5 54.20540541 121 0

total 12297
produksi

minus 2703.1
General
tot bucket track others tot
breaker crusher jalan others
3 2 1 0 6 0 0 0 0
7 1.5 0 0 8.5 1 2 0.5 3.5
0 1.5 4 0 5.5 3 0 0 3
4.5 2.5 0 0 7 1.5 1 0.5 3
5 1.5 3 0 9.5 0 1 1.5 2.5
0 4 0 0 4 1 0 7 8
19.5 13 8 0 40.5 6.5 4 9.5 20

General
tot bucket track others tot
inventory breaker crushejalan others
672 5 3.5 1 0 9.5 1.5 0 1.5 3
5 4.5 1 10.5 2 2.5 0 4.5
3.5 0.5 0 0 4 3.5 1 1 5.5
1312 6.5 3 0 1 10.5 0 0 0.5 0.5
6 0 0 1 7 0 0 0 0
5 0 0.5 1 6.5 2.5 1 0 3.5
1984 31 11.5 2.5 3 48 9.5 4.5 3 17
week 4 (25-30)
tanggal breaker general crusher loading baturaja pabrik prepare lahan bor prepare front
25
26
27
28
29
30
perbaikan jalan seathcase others total
0
0
0
0
0
0