You are on page 1of 1

HIGH STRAIN DYNAMIC

PILE LOAD TEST


BERRI DRILLING PROJECT
JUBAIL, SAUDI ARABIA

REPORT- 01
Total No. of Tested Piles-1
(PILE ID.- P-6)

PREPARED FOR:
CHINA HARBOR ENGINEERING
ARABIA CO. LTD. (CHEC)
AL KHOBAR, KINGDOM OF SAUDI ARABIA

PREPARED BY:
GULF CONSULT
(GEOTECHNICAL DIVISION)
ALKHOBAR, SAUDI ARABIA

Rev # 0 -- -- Remarks

Date 29/03/2020 -- -- Job No. GC/8607JO/16059-A1/20

You might also like