Length of pile Wave
Toe Speed** Shaft Cross-Section and Soil Changes (from
S. No. Pile No. from test level Pile Class
response test level)
(m) (m/sec)
27 March 2019
1.0
Final
18-13-133224/PIT-2
1. P-12 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
2. P-13 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
3. P-14 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
:
5. P-16 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
6. P-17 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
Notes: * Wave speed presented here are back calculated to match the pile toe as evident from the test result with pile length provided by the contractor. If the wave
speed is within the acceptable range (3800 m/s to 4200 m/s), the pile length is considered acceptable.
27 March 2019
1.0
Final
18-13-133224/PIT-2
8. P-19 Evident 27.53 4000 Fairly uniform shaft. No sharp defined reflections. A
13. P-24 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
Notes: * Wave speed presented here are back calculated to match the pile toe as evident from the test result with pile length provided by the contractor. If the wave
speed is within the acceptable range (3800 m/s to 4200 m/s), the pile length is considered acceptable.
27 March 2019
1.0
Final
18-13-133224/PIT-2
Fairly uniform shaft. No sharp defined reflections.
15. P-26 - 26.53 4000 A
However, no clear evident toe signal
16. P-27 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
17. P-28 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
:
18. P-29 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
19. P-30 Evident 26.53 4000 Fairly uniform shaft. No sharp defined reflections. A
Notes: * Wave speed presented here are back calculated to match the pile toe as evident from the test result with pile length provided by the contractor. If the wave