DESCRIPTION: Clause : D 12 6
.
:
UNIT:
3
isolated piers and the like
Excavating pits to receive bases of stanchions ,
columns , shall be M
in cubic (m) stating the number and the
stating
metre level clauses
as D 11
Excavating pits
.
QTY:
having both plan dimensions less than 1 25m
.
shall be .
separately
18
Q V * Excavated pit
D
-
P3 Dimension
From plan
B = 600 mm 0 6 m
4) i 0 6
.
= .
1 = 600 mm
I
0 68 .
= 0 .
6 m
H = 300mm = 0 .
3 m
0 .
68
0 30 .
4 86
.
P7
16
1. 65 From
Dimension plan :
1 .
65 B = 1658 mm = 1 65 m
.
38 1 65
8
.
.
13 .
87 L =
1650 mm = 1 65
.
m
H =
300 mm = 0 .
3 m
1. 65
17 93 .
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
DESCRIPTION: Clause : D 18
· UNIT:
Excavated materials to be deposited on site in permanent spoil heaps or spread on site M
3
shall each be
given in cubmic metres
stating any requirements for the location of
QTY:
such deposits of the distance from the excavation
Average in metres or kilometres
18
Q D V * Disposal materials
-
P3 Dimension
From plan
B = 600 mm 0 6 m
4) i 0 6
.
= .
1 = 600 mm
I
0 68 .
= 0 .
6 m
H = 300mm = 0 .
3 m
0 .
68
0 30 .
4 86
.
P7
16
1. 65 From
Dimension plan :
1 .
65 B = 1658 mm = 1 65 m
.
38 1 65
8
.
.
13 .
87 L =
1650 mm = 1 65
.
m
H =
300 mm = 0 .
3 m
1. 65
17 93 .
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
HEADING:
DESCRIPTION: UNIT:
QTY:
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
HEADING:
DESCRIPTION: UNIT:
QTY:
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
DESCRIPTION: Clause : D 15
:
UNIT:
the surface of the site and the excavations Item
An item shall be
given
for
keeping
Free of surface water .
QTY:
P3 Dimension
From plan
B = 600 mm = 0 6 m .
0 6
.
1 = 600 mm
I
= 0 .
6 m
H = 300mm = 0 .
3 m
P7
From
Dimension plan :
B = 1658 mm = 1 65 m
.
1 65
.
L =
1650 mm = 1 65
.
m
H =
300 mm = 0 .
3 m
1. 65
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
HEADING:
DESCRIPTION: UNIT:
QTY:
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
HEADING:
DESCRIPTION: UNIT:
QTY:
FAKULTI TEKNOLOGI KEJURUTERAAN AWAM
TEKNOLOGI PEMBINAAN BANGUNAN
HEADING:
DESCRIPTION: UNIT:
QTY: