You are on page 1of 1

Assignment-1: 15 Marks

Prepare a hand-written assignment by answering all the following questions.


A. Write a brief description of the three types of control processes used in project management
with the necessary sketches. (3)
B. Identify the reasons for project termination. Would you suspect that most projects are
terminated for “non-technical” reasons? Why or why not? (3)
C. Prepare a unique project proposal on any (Engineering/Business) projects you like (No two
proposals would be the same). (4)
D. Write a project final report based on any of the projects that you have already done in your
previous semesters. (5)

Instructions Must Follow:


• Add a top page including the student information, date, and course information, etc.
• Don’t miss the deadline (The deadline is the last class date of this semester)
• Avoid direct copying from any sources, write in your own words
• Use A4 pages with margin to write your assignment
• If two or more reports are similar, all of those will be penalized likewise
• Scan your assignment with cam scanner (or equivalent software or through directly by the
scanner) and save as pdf with renaming to your Student ID No. only (e.g.- 16010XX)
• Your writing should be clear enough to understand
• Double-check the above instructions before submission

Question weights
• Q. A = 10%
• Q. B = 20%
• Q. C = 30%
• Q. D = 40%
• Total = 100%

You might also like