Project Proposal
DATE: 04/28/2016
Project Background
2
Aquaponics System Educational Piece
Information boards show how
Client: Committed NAU Clubs components work and how
ASCE system can be commercialized
Green Jacks Increase culture of sustainability
Increase amount of sustainable
projects
Daniel 4/28/16
Project Background
3
Greenhouse
Client: CECMEE
Living
laboratory/Classroom
Specs
Geodesic dome by
Growing Spaces
26’ diameter
Solar powered climate
control system
Passive solar
Rigid frame
Daniel 4/28/16
Technical Considerations
4
Tonowynn 4/28/16
Project Understanding
5
Current Challenges Stakeholders
Site determination CECMEE
Hours of daylight NAU Volunteer Clubs
Viewers of aquaponics
Potential Challenges system
Fish and plant casualties Recipients of compost
Aquaponics system leaks Engineering students and
and clogs faculty
What to do with the NAU community
harvest?
Daniel 4/28/16
Project Scope
7
Task 6: Material Acquisition Task 9: Maintenance and
6.1: Aquaponics System Operations
6.2: Greenhouse Future Use Plan
Task 7: Construction Operations and Maintenance
Manual
7.1: Aquaponics System
Task 10: Project Management
Informational Boards
7.2: Greenhouse 10.1: Meetings and General
Management
Task 8: Testing and Monitoring
10.2: Project Schedule
8.1: Water Stabilization
10.3: 50% Design Report
8.2: Aquaculture Introduction
10.4: Final Design Report
8.3: Plant Propagation
10.5: Final Presentation
8.4: Plant Introduction
10.6: Website
8.5: System Monitoring
8.6: System Alterations
Daniel 4/28/16
Exclusions
8
Yasmin 4/28/16
Critical Path
Project Staffing
10
Table 2: Task Designation by Hour
1.0 Funding 10 25
2.0 Greenhouse 10 22
Table 1: Project Roles
Acquisition
Classification Code
3.0 Technical 40 40
Senior Engineer SE Research
4.0 Analysis 65 65
Engineer E
5.0 Design 70 70
Administrative AA 6.0 Material 40 40
Assistant Acquisition
Engineering Intern EI 7.0 Construction 160
9.0 Project 60 50 30 70 20
Management
Subtotal 80 297 55 315 220
Total 967
Tonowynn 4/28/16
Project Cost Estimate
11
Daniel 4/28/16
Funding
12
Approved for $8,647.00
Conscious Cultivation
will be submitting an
addendum asking the
Green Fund to approve
the full materials cost of
$20,000.00.
Abrar 4/28/16
References
13
[2] http://geodesic-greenhouse-kits.com/greenhouse_pictures/nggallery/page/1
[3] https://aquaponicgardening.wordpress.com/
[4] http://nau.edu/green-nau/nau-green-fund/
Abrar 4/28/16
[2]
14 4/28/16