Janes reported on 19 June 2020 that the IAF was looking to fast-track the procurement –
valued at about USD1.4 billion – of 21 used Mikoyan MiG-29 and 12 new Sukhoi Su-30MKI
combat aircraft to boost its air combat capabilities.

Below is the an extract from the Su-30M profile, just one of more than 41,000 verified and
validated equipment profiles available from Janes.
Land
Su-30MKI
('Flanker-H') Version for India in four configurations, initially referred to as Su-30MKI, MKII,
MKIII and MKIV. Indian contract signed 30 November 1996. First eight delivered March
1997 to basic Su-30PU (Su-30K or even Su-37UB) standard, with AL-31F engines; eight for
1998 delivery were expected to have French Sextant avionics including VEH 3000 HUDs,
high-resolution colour LCD MFDs, a new flight data recorder, a Totem ring laser gyro dual
INS with embedded GPS, Cockpits stated to be "practically identical" although rear seat
occupant normally operates radar, systems and weapons. Israeli EW equipment, a new Sea
UOMZ OLS-30 electro-optic targeting system and rearward-facing radar in tailcone; 12
originally to have been delivered 1999 were to add canards, as on Su-37; final 12 (originally
scheduled for delivery in 2000) were to have AL-37FP engines with single-axis thrust-
vectoring nozzles inclined outwards 32° from the centreline for improved yaw control,
especially in single-engined case. AL-37PP claimed to offer 3-D thrust vectoring, with
nozzle actuation via the fuel, and not the hydraulic, system.

Completion and delivery of balance of 32 was repeatedly delayed; decision taken that all
these would be completed to final standard before delivery. (In interim, India contracted on Air
18 December 1998 for 10 standard Su-30Ks which had been cancelled by Indonesia; all
had been delivered by October 1999.) First prototype full-specification Su-30MKI flew at
Irkutsk on 26 November 2000; Irkutsk built four prototypes, last of which handed over to
Sukhoi design bureau on 11 August 2001.

First production aircraft flew 28 December 2001. Under renegotiated contract, IAF to have
received six aircraft by 2002 and balance of 26 in batches beginning 18 to 24 months later;
Batch 1 and 2 aircraft (22 in all) were to be be raised to full (Batch 3) standard under
agreement of 6 January 2006. Batch 1 capabilities were air-to-air only with N011M Mk. 1
radar; Batch 2, with N011M Mk. 2, added ability to engage targets with four R-77 AAMs,
plus ground mapping, ground/sea target search and lock and integration with Kh-31A and
Kh-59ME ASMs; Batch 3, with N011M Mk.3, added Indian processor to replace Russian
C101 radar computer, ground attack mode with simultaneous air target search and
integration with Rafael Litening pod. Indian-assembled aircraft reportedly have new gimbals
for N011M's moving antenna, giving ±100 degrees azimuth and elevation, plus tracking
range increase to 100 n miles (185 km; 115 miles).

First two departed Irkutsk inside An-124 transport 22 June 2002. However, 'full-
specification' received in three standards, first 10 being Stage I; these 10 formally accepted
into service by 20 Squadron at Pune 27 September 2002. Stages II and III were 12 in 2003
followed by 10 in 2004 (although last not formally accepted until late 2007).

Licenced production of 140 Su-30MKIs by HAL was agreed in September 2000, followed
by contract signature in Irkutsk on 28 December 2000. Sometimes referred to by KnAAPO
as Su-35UB. First two, built from kits, handed over at HAL's Nasik plant in 2004, serialled
SB101 onwards; first flight 1 October 2004; first delivery 28 November 2004; degree of
completeness progressively reduced although in August 2006, contract revised to allow final
deliveries to be made in 2014 (even 2012) instead of 2017, as originally planned; this
accompanied by statement that India had "relinquished the right to full assembly"; Irkut
delivered typical 15 kits in 2006; by 2009, this was 18; and 20 in 2012. HAL had completed
34 by September 2008, these equipping Nos. 20 and 30 Squadrons; increased to 74 by
June 2010, 99 by November 2011 and 119 by December 2012.

Indian contribution to Su-30MKI avionics (developed under project Ventrivale) include DARE
MC-486 and DP-30MK mission computer/display processor; DARE RC1 and RC2 radar
computer; DAR Tarang Mk 2 RWR and high-accuracy direction-finding module; IFF-1410A
IFF; HAL INCOM 1210A integrated communication suite; HAL RAM-1701 radar altimeter;
and LRDE programmable signal processor. Avionics systems from various countries
integrated by Ramenskoye RPKB.

India placed further contracts initially concerning 18 Su-30MKIs to replace same number of
interim Su-30s due for return to Russia. Reported in February 2007 that contract for 40 Su-
30MKIs would be signed within one month; no confirmatory reports (at that time) that this
was done. Purchase of further 42 Su-30MKIs authorised by Indian government in June
2010, these also to be built by HAL and ordered 24 December 2012, increasing Indian kit
programme to 222, plus further 50 (10, 12, 10, and 18) delivered complete; four
development aircraft not included in total. Indian total thus 272, although no evidence of
final two Russian airframes being built or delivered. In 2018, Russia offered further 40 for
local production, but prompted no sign of Indian interest.

Two Indian Su-30s delivered to Russia by January 2009 for modifications allowing
supersonic launch of BrahMos-A ASMs. By 2015, Irkut plant reportedly providing India with
upgrades to allow 42 Su-30MKIs to launch BrahMos-A supersonic cruise missiles. On 25
June 2016, first captive carriage test flown on centreline pylon of a modified Indian Air
Force Su-30MKI. First air-launched firing test undertaken in 2017, with two subsequent
launches in 2019. Integration of system declared complete as a result of 17 December
2019 test firing.

Request Consultation
!
Request a free consultation to find out how in a world of fake news and ever growing conflict,
Janes can provide you with unbiased, verified open-source intelligence.

First Name * Last Name *

Email * Telephone *

Company * Job title *

Industry Sub Industry

Industry " Systems Integrators / Diversified Primes "


Country *

Country * "
By submitting this request, I agree with the Janes terms and conditions and privacy policy.

I consent to receive Janes publications, newsletters, product announcements and event invitations. I
can freely withdraw my consent at any time.

Submit for a call back #

! LinkedIn " YouTube # Twitter $ Facebook $ RSS

Capabilities Capella About Janes Store


Threat Intelligence Janes Capella Overview What We Do Magazines
Defence Industry Intelligence Janes Capella for Government and Tradecraft Yearbooks
National Security
Country Intelligence How We Serve Industry
Janes Capella for Defence Industry
Equipment Intelligence How We Serve National Security
Contact
Work for Janes
Contact us
News Advisory Privacy policy

Janes Equipment, Markets and Terms & conditions


Land Want to see some free examples
Industry Consulting Sitemap 2
Sea of ©
ourJanes.com
industry-leading
2021 All Rights
Janes Intelligence Unit equipment
Reservedintelligence?
Air

You might also like