Project Name
Date
ARCHITECT:
Company:
Address:
Tel:
Fax:
Contacts:
PROJECT LOCATION:
Address:
Directions:
APPLICABLE CODES
BUILDING:
MECHANICAL:
PLUMBING:
ELECTRICAL:
FIRE:
ENERGY:
Notes/Comments:
Contacts:
Tel:
Fax:
Email:
Page 1 of 8
Hotel Due Diligence
Project Name
Date
Contact:
Tel:
Fax:
Email:
Contact:
Tel:
Fax:
Email:
Page 2 of 8
Hotel Due Diligence
Project Name
Date
Contact:
Tel:
Fax:
Email:
Contact:
Tel:
Fax:
Email:
Page 3 of 8
Hotel Due Diligence
Project Name
Date
Contact:
Tel:
Fax:
Email:
ELECTRICAL UTILITY
Name:
Address:
Contact:
Tel:
Fax:
Email:
Page 4 of 8
Hotel Due Diligence
Project Name
Date
Contact:
Tel:
Fax:
Email:
Contact:
Tel:
Fax:
Email:
Page 5 of 8
Hotel Due Diligence
Project Name
Date
Demark Location:
Raceway requirements:
Longest run allowed:
Backboard:
Electrical power:
Air Conditioning requirements:
HEALTH DEPARTMENT
Name:
Address:
Contact:
Tel:
Fax:
Email:
Contact:
Tel:
Fax:
Email:
CIVIL ENGINEER
Name:
Address:
Contact:
Page 6 of 8
Hotel Due Diligence
Project Name
Date
Tel:
Fax:
Email:
Contact:
Tel:
Fax:
Email:
SEWER
Location of connection:
Pipe size:
Invert at point of connection:
Invert of nearest upstream manholes flood rim (black flow valves):
DOMESTIC WATER
Location of connection:
Pipe size:
Water Hardness (provide water softener if > 7 grains/gal):
Invert at point of connection:
Flow demand:
Meter location:
Back flow device:
Booster Pump Required?
IRRIGATION WATER
Location of connection:
Pipe size:
Page 7 of 8
Hotel Due Diligence
Project Name
Date
Flow demand:
Meter location:
Back flow device:
Contact:
Tel:
Fax:
Email:
Settlement Expected:
Soil pH (corrosive)
Plastic pipe allowed below grade?
Cathodic protection required?
STRUCTURAL ENGINEER
Name:
Address:
Contact:
Tel:
Fax:
Email:
Seismic Zone:
Zone Factor:
Foundation footing locations:
Shear wall locations:
Limitations on penetrations:
Page 8 of 8