Hotel Due Diligence

Project Name
Date

ARCHITECT:
Company:
Address:

Tel:
Fax:
Contacts:

PROJECT LOCATION:
Address:

Directions:

APPLICABLE CODES
BUILDING:
MECHANICAL:
PLUMBING:
ELECTRICAL:
FIRE:
ENERGY:

Notes/Comments:

BUILDING PLAN REVIEW


Name:
Address:

Contacts:

Tel:

Fax:
Email:

Building Importance Factor:


Seismic Zone:
Equipment Screening Expectations:

Page 1 of 8
Hotel Due Diligence
Project Name
Date

MECHANICAL PLAN REVIEW


Name:
Address:

Contact:

Tel:
Fax:
Email:

Are there any special local amendments to the codes?


Who submits plans for review?
How is U-value for tapered roof insulation computed?
Design conditions: ____/____dry bulb/wet bulb cooling,
_______ design heating temp
________ extreme heating temp

PLUMBING PLAN REVIEW


Name:
Address:

Contact:

Tel:
Fax:
Email:

Are there any special local amendments to the codes?


Who submits plans for review?
What are plan review expectations?:
Plastic pipe allowed below slab?
CPVC allowed for distribution?
Cold water pipe insulation recommended?
Are isometric riser diagrams required?
Show fixture counts on risers only OK?
Water service back flow preventer location:
Sovent plumbing system allowed?
Other plan review data required?

Page 2 of 8
Hotel Due Diligence
Project Name
Date

ELECTRICAL PLAN REVIEW


Name:
Address:

Contact:

Tel:
Fax:
Email:

Are there any special local amendments to the codes?


Who submits plans for review?
Verify plan review expectations:
NMC allowed for 3 story building?
MC allowed?
Aluminum OK for 100 amps and larger feeders?
Red fire alarm cable allowed?
Interpretation of dwelling unit vs hotel unit?
Receptacle layout greater than 12’ spacing OK per NEC 210.60(B)?
Air quality permit required for diesel emergency generators?
Documentation for fuse and breaker coordination for elevators?

FIRE MARSHAL REPRESENTATIVE


Name:
Address:

Contact:

Tel:
Fax:
Email:

Who submits plans to Fire Department?


Sprinkler pump required?
Fire pump required?
Emergency power for fire pump?
Hazard Classification:
Flow required per sf:
Head spacing requirements:
Attic coverage:
Coverage above A/C unit in closet?
Residual pressure required at furthest head:
Changes to pressure expected in the future due to area growth?

Page 3 of 8
Hotel Due Diligence
Project Name
Date

Air quality permit required for engine driven fire pumps?


Egress sign color (red)(green)
Egress signs high and low required? Exactly where?
Emergency power elevator?
Emergency power for other systems?
Effects of building height:
Hoods: Which fans run during fire? Hood? MUA?
Hood/MUA fans need emergency power? (only for smoke removal?)
Detectors required in which spaces?
Fire fighters’ communications system?

NATURAL GAS COMPANY


Name:
Address:

Contact:

Tel:
Fax:
Email:

Initial Application to Start Utility Engineering:


Gas available?
Size of service pipe:
Standard pressures available for service:
Rules/Publications for service:

ELECTRICAL UTILITY
Name:
Address:

Contact:

Tel:
Fax:
Email:

Initial Application to Start Utility Engineering:


Overhead or Underground Service?
Standard service voltages available?
Transformer: (Pad mounted) (UG)(Pole mounted):
Clearances around transformer:

Page 4 of 8
Hotel Due Diligence
Project Name
Date

Pad or vault required?


Rules/Publications for service:
Application forms for temporary service:
Contact:
Document requirements:

Application forms for permanent service:


Contact:
Document requirements:

CABLE TELEVISION UTILITY


Name:
Address:

Contact:

Tel:
Fax:
Email:

Who will be contracting for the service? Owner/Contractor/Engineer?


Rules/Publications for service:
Expectations for interface on this project:
Demark Location:
Raceway requirements:
Longest run allowed:
Backboard:
Electrical power:
Air Conditioning requirements:

TELEPHONE / INTERNET UTILITY


Name:
Address:

Contact:

Tel:
Fax:
Email:

Who will be contracting for the service? Owner/Contractor/Engineer?


Rules/Publications for service:
Expectations for interface on this project:

Page 5 of 8
Hotel Due Diligence
Project Name
Date

Demark Location:
Raceway requirements:
Longest run allowed:
Backboard:
Electrical power:
Air Conditioning requirements:

HEALTH DEPARTMENT
Name:
Address:

Contact:

Tel:
Fax:
Email:

Who submits plans to Health Department?


Kitchen Rule/Publications:
Pool Chemical Treatment:
Spa Chemical Treatment:
Garbage Disposers allowed?
Sizing criteria for grease interceptors:

ADA PLAN REVIEW


Name:
Address:

Contact:

Tel:
Fax:
Email:

Accessible room doorbell: Is light and horn required for bathroom?

CIVIL ENGINEER
Name:
Address:

Contact:

Page 6 of 8
Hotel Due Diligence
Project Name
Date

Tel:
Fax:
Email:

WATER AND SEWER PROVIDER:


Name:
Address:

Contact:

Tel:
Fax:
Email:

SEWER
Location of connection:
Pipe size:
Invert at point of connection:
Invert of nearest upstream manholes flood rim (black flow valves):

WATER SERVICE PRESSURE


Static Pressure:
Residual pressure:
Basis of pressure:
Future pressure expectations:

FIRE SPRINKLER WATER


Location of connection:
Pipe size:
Invert at point of connection:
Flow demand:
Back flow device:
Booster Pump?

DOMESTIC WATER
Location of connection:
Pipe size:
Water Hardness (provide water softener if > 7 grains/gal):
Invert at point of connection:
Flow demand:
Meter location:
Back flow device:
Booster Pump Required?

IRRIGATION WATER
Location of connection:
Pipe size:

Page 7 of 8
Hotel Due Diligence
Project Name
Date

Flow demand:
Meter location:
Back flow device:

SOILS ENGINEER (GEOTECH)


Name:
Address:

Contact:

Tel:
Fax:
Email:

Settlement Expected:
Soil pH (corrosive)
Plastic pipe allowed below grade?
Cathodic protection required?

STRUCTURAL ENGINEER
Name:
Address:

Contact:

Tel:
Fax:
Email:

Seismic Zone:
Zone Factor:
Foundation footing locations:
Shear wall locations:
Limitations on penetrations:

Page 8 of 8