What is product, project, program?

Classical Mistake 2 process and 1 product/1 Technology?

PMI knowledge area?

Planning, Estimation, scheduling describes and differences?

Classic Project phases 2 of them, issues, input output, description?

Methodologies (no water fall and code and fix)

WBS definition and draw for a meeting software?

Size estimation techniques? ()

FS-SS-FF-SF?

CPI Diagram?

Which methodology is good for risk? Why?

Require Gathering techniques 2 of them and describe?

Risk _ but i dont remember what was it _

Feature set control 2 middle stage 1 late stage

Describe team models and which one is good for tactical execution why_

Skill matrix? Describe and set an example

Draw and solve the EVA?

Draw Scrum at all

Hireing people _ Guidelines

CMM name and describe one?

What is change control board? Why does it like a tirag?

Name the testing phase in a software project and briefly one tht performs verification not in perform
validation ?

Illustrate with a diagram Process groups and explain one of them how does it r... knowledge area?
What is product, project, program?

Classical Mistake 2 process and 1 product/1 Technology?

PMI knowledge area?

Planning, Estimation, scheduling describes and differences?

Project phases 2 of them, issues, input output, description?

Methodologies (no water fall and code and fix)

WBS definition and draw for a meeting software?

Size estimation techniques? ()

FS-SS-FF-SF?

CPI Diagram?

Which methodology is good for risk? Why?