You are on page 1of 5

Tunneling Technologies

Centre of Expertise for


Equipment Technology

Connections for Life


We deliver Overall Concepts Range of Services

“Tunnel Technologies” as part of the Tunnelling Depart- Our services range from the rental of individual items such as Draft design

ment of Wayss & Freytag Ingenieurbau AG, headquartered small machines to the delivery and operation of complex large- Calculation, Dimensioning and Quality Control

in Frankfurt, provides customized equipment solutions for scale installations to suit all geological conditions. Project-specific Preparation and Provision

all types of mechanized tunnelling that suit our clients’ Delivery

requirements.
Set-up

Our services are based on the experience gained on over On request we can provide skilled and experienced workers Function Tests and Commissioning

200 km of tunnels, driven using tunnel boring machines or whole working teams accompanied by Site Managers to
Operation
(TBMs) operated in slurry shield, earth pressure balance operate the plants.
Dismantling and Transport Off-Site
(EPB) and hard rock mode.

Overall Layout JV Weinbergtunnel Zurich, Switzerland Overall Layout JV Corrib Tunnel Project, Ireland
Separation and Mud Treatment

Separation plant (STP): Mud Treatment (MTP):

Separation plants in all sizes Filter presses

Belt conveying systems Centrifuges

Transfer pumps, inner pipe systems Flocculation stations

Encapsulations Neutralizations

Discharge of Separation Plant Multi Cyclones Transfer pumps, inner pipe systems Filter Cakes Filter Plates

Separation Plant JV Emstunnel, D -NL Filter Presses


Customized System Engineering
Health and Safety:

Planning and execution of Work Safety concepts (Standard of Oil and Gas Industry)

Rescue Containers

Slurry Circuit for conveying of excavated material: Fire Fighting Equipment

Feed – and Slurry Pumps, Frequency Converters, Transformers Gas Monitoring

Pipes and Fittings Self-Rescuer

Services
Batching Plants:
Compressed Air Station
Bentonite Batching Plants Electrical Installations:

Mortar Mixing Plants for Site- and Ready Mixes Planning and execution of Electrical concepts

Silo Systems Equipment and Material

Draft design and Laboratory Analysis of:


Feed- and Slurry Pumps
- Mortar Mix Design for Tail Gap Grouting

- Mix Design for Bentonite Slurry Suspension

Fire Fighting Equipment


Compressed Air Stations:

Compressed Air Stations with Electrical and Diesel Compressors

Compressed Air Vessels, inner pipe systems

Start-stop-automatic systems

Tank / Container Systems:

Water
Bentonite Batching Plant
Fresh Bentonite Slurry Suspension

Waste Bentonite Slurry Suspension

Agitators, transfer pumps and inner pipe systems

Booster Stations and Cooling Water Systems

Tunnel Ventilation

Tank System
Wayss & Freytag Ingenieurbau AG Contact :
Tunneling Division
Eschborner Landstraße 130 - 132 Dipl.-Ing. Holger Joneleit
60489 Frankfurt Head of Tunnelling Technologies

Phone : +49 (0) 69 7929-400 Mobile: +49 (0) 172 - 6616 307
Fax: +49 (0) 69 7929-491 Mail: holger.joneleit@wf-ib.de

tunnelbau@wf-ib.de
www.wf-ingbau.de

You might also like