Professional Documents
Culture Documents
6-10KVA-GTM
1
1. Important Safety Instruction 1.1.9. To eliminate any overheating of the unit, keep all ventilation
1.1. An Important Notice openings free from obstruction, and do not store “things” on the top
1.1.1. There is a tiny leakage current from the Transformer Module, so of the unit. Keep the unit 30 cm away from the wall.
make sure to it is correctly grounded before connecting to the UPS, 1.1.10. The unit is recommendded to install in an environment with 5M3
1.1.2. Do not open the case, as there are no serviceable parts inside, or 1.1.11. Please stop using the unit in case of any noise or smell occurred,
your warranty will be void. then consult with your dealer at once.
1.1.3. Do not try to repair the unit yourself; contact your local supplier or 1.1.12. Make sure the unit is completely turned off when moving the unit
your warranty will be void. from one place to the other. It might cause electrical shock if the
1.1.4. Non-authorized technician is not allowed to install the unit in the input or output is not cut completely.
following areas: 1.1.13. Improper grounding might cause unexpected leakage current, so
a. Medical equipment directly related to human life. please make sure that the ground of the Utility is properly
b. Elevator, Metro(Subway) system or any other equipment related
to human safety. connected.
c. Public System or critical computer Systems. 1.1.14. Please make sure that the input voltage of the unit matches the
1.1.5. Any installation related to human safety, public system, or
supply voltage.
emergency device shall be consulted with dealer first; otherwise,
1.1.15. This unit can be installed with an optional Maintenance Bypass
your warranty will be void.
Switch. Please make sure you may follow the operation
1.1.6. If any liquid is split onto the unit or foreign objects dropped into the
procedure
unit, the warranty will be null and void.
1.1.7. Do not install the unit in an environment with sparks, smoke, or gas.
1.2. Storage Instruction
1.1.8. Make sure the unit is installed within a proper invironment as
1.2.1. Keep it in a tidy and clean environment. Do not block the
specified:
a. Keep it in the place of 0 -40 C and 30-90% non-condensing ventilation holes.
humidity 1.2.2. When use a damp cloth to clean the unit, please make sure the unit
b. Keep away from direct sunlight
c. Keep away from the objects that give off excessive heat and is turned off to avoid any hazardous risk.
areas that are excessively wet.
1.2.3. It is not allowed to touch any terminals of the unit if it is connected
d. Keep away from the environment that generates ARCs.
e. Keep away from dusty, corrosive and salty environments to the Utility.
f. Install the unit indoors as it is not designed for installation
outdoors.
2 3
1.3. Rear Panel Explanation
2. Installation and Operation
6K
2.1. UPS Unpacking
2.1.1. Remove the unit from PE foam.
2.1.2. Check Accessories
2.1.2.1. one set of user’s manual
2.1.2.2. one set of accessory kit:
E A B C D
(C1 & F1 are for the unit with Maintenance Bypass Switch Only)
A1 A2 A3
10K
x4 x4 x1
B1 B2 B3 F1 C1
TNV Communication
Not Intended to
Network
for 2U
TB 1
for 3U
x2
TB 2
x2 x2 x1 x2
S1 S2 S3 S4
D F A G B
BYPASS
x2 x4 x8 x6
TNV Communication
Not Intended to
Network
INV
TB 1
2.1.3. If the unit is with Maintenance Bypass switch, the cable attached as
below:
TB 2
4 5
2.2. Selecting Installation Position 2.3. Installation
It is necessary to select a proper environment to install the unit, in 2.3.1. Installation as a Tower Unit
order to minimize the possibility of damage to the unit and extend the life of
the unit. Please follow the advice below:
2.2.1. Keep at least 30cm(12 inches) clearancer from the rear panel of the
unit to the wall. Do not block the air-flow to the ventilation
openings of the unit. Also check the installatin site to avoid
over-heat and excessive moisture.
GTM
UPS
AIR
Battery
AIR
3KVA (M ) S3
2.2.2. Do not place the unit in an environment near dust, corrosive or salty
material or flammable objects.
2.2.3. Do not expose the unit to outdoors.
6 7
2.4. Terminal Block Explanations for Input, Output
2.3.2. Installation as a Rack Unit 2.4.1. Terminal Block Explanation
6K
B1 B2 S4 B1 B3 S4
S3 S3
10K
TR OUTPUT
UPS TB 1
G 3 N2 2 L2 2 N11 L1 2 L11
TO UPS OUTPUT UTILITY INPUT
TB 2
G 2 N2 L2 G 1 N1 L1
TR OUTPUT
TB 1
GTM G 3 N2 2 L2 2 N11 L1 2 L11
TO UPS OUTPUT
TB 2 N/A N/A N/A
G 2 N2 L2
● L1-N1:Utility Input
● G1:Input Ground
● L2、N2:Connect to UPS Output Terminal
Battery ● G2:Connect to UPS Output Ground Terminal
8 9
●
N22 L22 N11 L12 L11 N22 L22 N11 L12 L11
120Vac 120Vac
110Vac 3KVA (Max)
6KVA (Max) 240Vac
6KVA (Max)
(a) (b)
Drawing 2-1
10 11
G. current
4. Technical Specifications 100% Load < 3mA
leakage
H. Marks CE, cUL, UL
Specifications
Item Description Condition
6K (2U) 10K (3U)
A. AC Input Terminal
Unit w/o Bypass Switch 160 - 280Vac (1Φ)
1 Voltage Unit w/Bypass INV 160 - 280Vac (1Φ)
Switch BYPASS 184 - 260Vac (1Φ)
2 Current N/A 30Arms(Max) 50Arms(Max)
3 Frequency N/A 50Hz/60Hz±5Hz
B. Output Terminal
1 Voltage N/A 184 - 260Vac (1Φ)
2 Current N/A 30Arms(Max) 50Arms(Max)
3 Frequency N/A 50Hz/60Hz±3Hz
C. Maintenance Bypass Switch
1 Transfer Time 0~100% Load <2ms
D. Communication
Bypass For Unit with Maintenance
1 RJ-45 connector
Detection Bypass Switch
E. Overview
440mm*88mm*660mm(2U)
1 W*H*D
440mm*132mm*660mm(3U)
Unit with Maintenance
42kgs 53kgs
Bypass Switch
F. Weight
Unit without Maintenance
41kgs 52kgs
Bypass Switch
12 13
14 192321142011002
15