8. PROJECT
QUALITY MANAGEMENT
Presented by:
2 24 10 12 1
220
Cost of poor quality categorized into internal (found by the project team)
and external (found by the customer).
223
Customer satisfaction.
Continual improvement.
Management responsibility.
TAILORING CONSIDERATIONS
Each project is unique; therefore, the project manager will need to
tailor the way Project Quality Management processes are applied.
01 PROJECT CHARTER
05
ORGANIZATIONAL PROCESS ASSETS
227
02 DATA GATHERING 95
% 95
%
03
DATA ANALYSIS
Cost-benefit analysis
A cost-benefit analysis for each quality activity compares the cost of the quality step to
the expected benefit.
228
COST OF QUALITY.
• Prevention costs: Related to the prevention of poor quality in the deliverables.
• Appraisal costs: Related to evaluating, measuring, auditing, and testing the deliverables.
• Failure costs (internal/external): Related to nonconformance of the deliverables to the
needs or expectations of the stakeholders.
229
05 DATA REPRESENTATION
Flowcharts Or process maps because they display the sequence of steps and the
branching possibilities that exist for a process that transforms one or more
inputs into one or more outputs.
SIPOC (suppliers, inputs, process, outputs, and customers) value chain model.
Process flows or process flow diagrams When flowcharts used to represent steps in
a process, and they can be used for process improvement as well as identifying
where quality defects can occur or where to incorporate quality checks.
231
Matrix Diagrams
236
07 MEETINGS 33
%
95
%
95
%
237
01
QUALITY MANAGEMENT PLAN
• Describes how applicable policies, procedures, and guidelines will be
implemented to achieve the quality objectives.
• It describes the activities and resources necessary for the project
management team to achieve the quality objectives set for the project.
It may Includes:
• Quality standards.
• Quality objectives.
• Quality roles and responsibilities;
• Quality tools.
• Major procedures relevant for the project, such as dealing with
nonconformance, corrective actions procedures, and continuous
improvement procedures
238
02
QUALITY METRICS
Specifically describes a project or product attribute and how the Control Quality
process will verify compliance to it.
04
PROJECT DOCUMENTS UPDATES
• Lessons learned register
• Requirements traceability matrix.
• Risk register.
• Stakeholder register.
241
•
•
•
Sometimes called quality assurance,
It is refeed as non-project work.
QA focus on the processes used in the project.
QA
• QA is about using project processes effectively.
• It involves following and meeting standards to assure the final
product will meet stakeholders needs, expectations, and
requirements.
240
The project manager and project team may use the organization’s quality
assurance department.
01
PROJECT MANAGEMENT PLAN
• Quality management plan
02
PROJECT DOCUMENTS
• Lessons learned register
• Quality control measurements
• Quality metrics
• Risk report
03
ORGANIZATIONAL PROCESS ASSETS
243
01
DATA GATHERING
Checklist
Is a structured tool used to verify that a set of required steps has been
performed or to check if a list of requirements has been satisfied.
02 DATA ANALYSIS
Alternatives analysis.
Document analysis.
Process analysis. Identifies opportunities for process improvements.
Root cause analysis (RCA).
244
03 DECISION MAKING
Product decisions can include evaluating the life cycle cost, schedule,
stakeholder satisfaction, and risks associated with resolving product defects.
04
DATA REPRESENTATION
Affinity diagrams.
Cause-and-effect diagrams. Or fishbone diagrams, why-why diagrams, or
Ishikawa diagrams. This type of diagram breaks down the causes of the
problem statement identified into discrete branches, helping to identify the
main or root cause of the problem.
Flowcharts.
33
%
95
%
245
33
%
95
%
246
33
%
95
%
247
05
AUDITS
An audit is a structured, independent process used to determine if project
activities comply with organizational and project policies, processes, and
procedures.
Usually conducted by a team external to the project.
Plan-do-check-act and Six Sigma are two of the most common quality
improvement tools. 33
%
95
%
248
07 DESIGN FOR X
• Is a set of technical guidelines that may be applied during the design of a product
for the optimization of a specific aspect of the design.
• DfX can control or improve the product’s final characteristics.
• The X in DfX can be different aspects of product development, such as reliability,
deployment, assembly, manufacturing, cost, service, usability, safety, and quality.
08
PROBLEM SOLVING
Problems can arise from Control Quality process or from quality audits and can be
associated with a process or deliverable.
Problem-solving method will help eliminate the problem and develop a long-lasting
solution.
33
%
95
%
249
01
QUALITY REPORTS
The quality reports can be graphical, numerical, or qualitative, include all quality
management issues escalated by the team; recommendations for process,
project, and product improvements; corrective actions recommendations
(including rework, defect/bugs repair).
03
CHANGE REQUESTS
250
05
Project documents updates
• Issue log
• Lessons learned register
• Risk register
251
03 INSPECTION
Is the examination of a work product to determine if it conforms to
documented standards. Inspections may be called reviews, peer reviews,
audits, or walkthroughs.
33
%
95
%
254
4 TESTING/PRODUC T EVALUATIONS
Testing is an organized and constructed investigation conducted to provide
objective information about the quality of the product or service in accordance
with requirements.
95
%
255
Control charts
• Can be used to monitor various types of output variables.
• Used to track repetitive activities required for producing manufactured lots,
• Control charts may also be used to monitor cost and schedule variances,
volume, frequency of scope changes, or other management results
33
%
95
%
257
06 MEETINGS
Approved change requests review. All approved change requests should be
reviewed to verify that they were implemented as approved.
33
%
95
%
258
8.3 Control Quality Output
01
QUALITY CONTROL MEASUREMENTS
02
VERIFIED DELIVERABLES
The results of performing the Control Quality process are verified deliverables that
become an input to the Validate Scope process for formalized acceptance.
03 WORK PERFORMANCE INFORMATION
04
CHANGE REQUESTS
05
PROJECT MANAGEMENT PLAN UPDATES
06
PROJECT DOCUMENTS UPDATES
• Issue log. • Risk register
• Lessons learned register. • Test and evaluation documents.