You are on page 1of 39

All Hands Meeting

Tuesday - 3 Sep 2019


SAFETY MOMENT
BENEFITS OF YOGASANAS
 Improves your flexibility. ...
 Builds muscle strength. ...
 Perfects your posture. ...
 Prevents cartilage and joint breakdown. ...
 Protects your spine. ...
 Betters your bone health. ...
 Increases your blood flow. ...
 Drains your lymphs and boosts immunity
 Lowers risk of heart attack and improve immunity
 Postures like Savasan can control high blood
pressure
 Yoga lowers blood sugar and LDL ("bad")
cholesterol and boosts HDL ("good") cholesterol
 Improves your balance
 Helps sleep deeper
 Improves digestive system
 Helps relieve specific problems like back pains
3
ETHICS MOMENT
Ethics – going back to basics
What does Ethics Mean?
As per the definition, ethics are a general set of rules that are important to be followed to
be a part of the society. Moreover it guides one to live in a right way in the society.

Ethical Terms and Principles

 Values: The values of a person can be defined as the acts and actions which we
perform in our daily life.
 Morals: Morals are certain duties which we need to perform for the betterment of the
society.
 Integrity: Integrity means to be always honest and sincere under any circumstances.
 Character: Character is one of the most important ethics which in short describes a
person.
 Laws: These are certain rules and regulation fixed by the society.
 Dedication: This is also a person defining ethic.
 Accountability of responsibility: The more a person is responsible in nature, the
more efficiently and responsibly he will complete the given task.

5
Ethics – going back to basics
Benefits of Professional Ethics in The Workplace:

1. Asset Protection and Assurance


2. Team Work will develop
3. Public Image and Brand Value Increases
4. Trouble free working environment
5. Less Legal Issues
6. The company will Touch New level of Success

Some of the most ethical companies in the world*

Source: Ethisphere 2019 list 6


PROJECT UPDATE – NAVI MUMBAI METRO RAIL
Maiden Run of Train in Navi Mumbai Metro

• Navi Mumbai Metro sees power and train


operation for the first time after charging
of 220kV Substation
• The depot and a small section of the
mainline has been energized to showcase
the first step towards commissioning
Niteen with the train on platform

8
Charging of 220kV LiLo Arrangement

220kV Receiving Sub-Station integrated with the Grid


220kV GIS charged and Transformers Energised
33kV Buses and 25kV Traction System Charged

Pravin Gajare

220kV GIS Switchgear 33kV Circuit Breakers SCADA for 22kV GIS

9
25kV OHE charged in the Depot and Mainline
Pramita does the honors to inaugurate the 25kV system
Depot yard is lit up for the first time after charging the 415V supply

Pramita Pati

10
Train moved from depot to Station 11. Around 2 Km distance on 30-Aug-2019

Station 11 was specially prepared to lay the


25kV OHE
The track from Depot to Station 11 was
prepared to receive the train
Pravin Gajare, Pramita Pati and Shivaji ghere
put in all efforts to energize the power supply
Jayakumar and Rahul got the train ready for
the run
Track team, Interface team and O&M team
led by Zamir, Mahadevan and Lalit Pareba
arranged all facilities in time.
CONGRATUATIONS to the LB Teams Shivaji, Pramita, H.P, Niteen, Navendu & Lalit

11
The Client and the Rolling Stock Teams

CIDCO Officials also boarded the


train in the maiden run
Superintending Engineer Mr.
Deepak Hartalkar (4th from Left) is
seen along with CRRC team
JayaKumar and Rahul of LBG are
also seen (3rd and 2nd from right)

Deepak JayaKumar
Hartalkar & Rahul

12
PROJECT WIN
URBAN DESIGN, TRAFFIC SYSTEM DESIGN INCLUDING
ACCESS CONTROL ON WESTERN EXPRESS HIGHWAY
ALONG WITH SIGNAL FREE JUNCTIONS FOR
ENHANCED TRAFFIC FLOW IN MUMBAI
ACCESS CONTROL ON WESTERN EXPRESS HIGHWAY – Project Background

o Western Express Highway is a 25


km Urban Highway starting near
Mahim Creek in south and
extending to Dahisar Toll in north of
Mumbai
o Multiple flyovers spanning most of
the major intersections on the
highway

o One of the most busiest highway in Mumbai


o The highway currently sees worst traffic
snarls in the city
o Uncontrolled entry and exits from the
expressway and no alternate North-South
road corridor
Vision of the Project
Effective Utilisation of existing corridor and infrastructure to create an optimal
design for smooth, uninterrupted traffic flow – enhanced by ITS integration
Efficient Commute Experience Dynamic Urbanism

Traffic Volume Directional Conflict Slums Shut-down Industries


Modal variation Undefined entry & exits Dilapidated Structures Vacant land
Potential development scenarios Potential development scenarios

Maintain Continuous Public Realm


Minimise Conflict Area based Development
Flow & Speed Development Potential Value capture

Segregate local & long


Pedestrian Connectivity
distance traffic
Improve junctions below Intersection Slum upgradation
Integrate the
flyovers Improvement
existing grade CONTROLLE DYNAMIC
separators CORRIDOR Creation of Green Fingers
D ACCESS Safety as an integral Plazas &
design component Promenades Redensifcation
Monitor Traffic
ENHANCED Emergency Safety & Security URBAN
 Smart Precinct
CONNECTIVIT Evacuation REGENERATION
cameras, Bus Stops redesign
 Vehicle Y Measures
Incident Green Corridor
detection
systems
 VMS
Scope of Consultancy Services
Phase-I : Preparation of Techno-Economic Phase-II : Preparation of Detailed Project Report
and Financial Feasibility (6 months) & Bid Process Management (6 months)

1 Project Inception 1 Tender Documents & Detailed Tender Drawings

2 Data Collection and Analysis 2 Draft & Final Detailed Project Report

3 Bench Marking
3 Extension Of Services During Implementation
4 Development of Alternative Concept Plans
4 Miscellaneous
5 Development of ITS design

6 Simulation of Alternatives

7 Development of Final Design

8 Cost Estimates

9 Final TEFS Report


ACCESS CONTROL ON WESTERN EXPRESS HIGHWAY – Proposal Contributors

PROPOSAL COORDINATION (EOI TO PRESENTATION)


Preeti Chauhan (Proposal Coordinator)
Suresh Ramanadhan (Proposal Manager)

CAPTURE PROCESS AND TECHNICAL SUPPORT


Murali Krishna (Transportation Planner & Team Leader)
Atreyee Aggarwal (Head of Urban)
And many others….
AROUND OUR PROJECTS IN ASIA
Kandla Project – Outside Client office

Kshitish
Nadgauda

Nirant Manishaa
Maheshwari Belani

20
City Setting
 DPT is developing 1425 acre
"Smart Industrial Port City
(SIPC)“ on two sites:

 Location 1 - 580 acre


Smart urban township

 Location 2 - 845 acre


Modern industrial
zone

Smart Industrial  SIPC Kandla aims to help


Port City (SIPC), Location 2 industries and local
economy grow by
providing better
Smart Industrial infrastructure facilities
Port City (SIPC)
along with a supportive
Location 1
environment to thrive in.

 Aligned with the ambitious


Sagarmala vision of
Hon’ble PM of India, by
promoting development of
coastal and port based
economic zones.

21
Zoning, Location 1

22
Hyderabad Client office

Kshitish
Nadgauda

Amol
Mr. Ramaswami Rodrigues
Krishnaswamy

23
Hyderabad Metro Rai Project

24
First Dhaka Elevated Express Way Project

25
Mr.Carlo Fondacaro –
Team Leader of
VBSL Project
Participating in
Ganesh Chaturthi
Celebration &
Worship
Work Anniversaries – This Week
Mumbai - Versova Bandra Sea Link Project

Jagdish M Bhavsar Office Manager


06 September, 2006 13 Years

28
Navi Mumbai

Deepak Atmaram Quantity Surveyor


Arde
08 September,2006 13 Years

29
Patna Power Project

Pandurang District Coordinator


Deshpande
04 Sept,2017 2 Years

30
Solapur Smart City

Amjad Rafiq Resident Draughtsman


Naikwadi
06 Sept, 2017 2 Year

31
Gurgaon

Vinod Kumar Dayma Driver

01 September, 2009 10 Years

32
Karimnagar

Shiva Prasad Bandla Assistant Highway


Engineer
01 September, 2016 3 Years

33
Gurgaon

Nithil Malguri Senior Engineer -


Structures
26 August, 2019

35
Gurgaon

Vishwanath Mora Electrical Engineer

26 August, 2019

36
Gurgaon

Mohammed Shabbir Ali Environmental Engineer


26 August, 2019

37
Mumbai Metro Line 3

Balamurugan Engineer
Gurusamy
26 August, 2019

38