Building to 2 nos. of New BSL-3 Laboratory Using Prefabricated Containers at Defu Lane
PART 4 EVALUATION CRITERIA
PART 4
EVALUATION CRITERIA
Page 1 of 3
T/IDHT/01/FY20 - Addition & Alteration (A&A) Works Involving the Change of Use from Existing
Warehouse Building to 2 nos. of New BSL-3 Laboratory Using Prefabricated Containers at Defu Lane
PART 4 EVALUATION CRITERIA
EVALUATION CRITERIA
The Institute shall evaluate the Tender proposals based on the following criteria:
1. Critical Criteria
Non-compliance with any of the following critical criteria shall preclude the Tender
Proposal from further evaluation by the Institute:
a. Debarment Status
Page 2 of 3
T/IDHT/01/FY20 - Addition & Alteration (A&A) Works Involving the Change of Use from Existing
Warehouse Building to 2 nos. of New BSL-3 Laboratory Using Prefabricated Containers at Defu Lane
PART 4 EVALUATION CRITERIA
2. Evaluation Weightage
Tenderers who have met both the Critical and Other Criteria will be further evaluated
based on the following evaluation weightage.
Other Evaluation Criteria Weightage
(%)
Cost effectiveness of the Tender Proposal submitted including the 50%
application of life cycle costing technique, etc as may be deemed
appropriate by the Institute
Tenderer`s ability and expertise to undertake the project. It must have 20%
the ability to demonstrate experience and technical capability in
handling projects of similar scale and nature