Professional Documents
Culture Documents
Offfer NO.06/GI/2021-2022
ABOUT US
We would like to introduce Our selves. STEP Techno Solution LLP Is Managed by
Highly Qualified and Skilled Professionals with Experience of 25 Years in the Field,
Leveraging on Considerable Years of Experience, We Are Engaged in
Manufacturing, Designing and Supplying World Class Hot Dip Galvanizing Plant /
Surface Treatment Plants and Acid / Chemical Storage Equipment’s.
Our Organization Has A State-of-the-art Infrastructure Which Is Equipped With
Latest
Latest Butt welding Machines ( Only in Asia) , Tools & Testing Equipment Of Latest
Technology also having lab facility.
OUR QUALITY
MS – Welding As per
PP - Welding As per DVS standard
Internal designing and engineering of every single equipment.
Raw materials selection according to application.
In-house system to ensure flexibility, monitoring and quality.
On-site assembly and setup monitoring.
Latest Technology process training.
After sale, support and maintenance
Research and development of new technologies.
2. Welding
MS - Continues Fillet Welding
PP - Butt welding as per DVS (German Welding Society) 2207 norms.
PP - Extrusion Welding as per DVS (German Welding Society) 2207 norms.
3. Machinery
Butt Welding Machine : INDIA’S Longest BUTT WELDING Machine Based on DVS
Standard with the facility of ROLLING and FOLD Bending
Extrusion Machine : Imported Machine for Finished extrusion based on DVS
German Standard
4. Design
1. FURNACE
• Uniform Temperature
• Low Fuel Consumption
• Longer Kettle Life
• Low Ash & Dross Formation
2. DRYER
• Heat recovery system
• Instead of exhausting the entire waste air stream, a portion is diverted back in to the
drying chamber.
• Significant energy savings can be realized by re-circulating a portion of the flue gases
from the furnace
• The recirculation flue gas stream is mixed with the required amount of fresh air, and
used again.
• The dryer system allows drying requirements to be controlled independently from
exhaust requirements.
• Motorized dilution air dampers control the amount of exhaust/fresh air.
• Any amount of exhaust above minimum process requirements is wasted energy.
• reduce the temperature delta with molten zinc
1. EXPENSES : Train fare /medical insurance/ lodging / boarding /food & conveyance of installation
team
borne by purchaser.
3. SITE REQUIREMENT : Ladder/ scaffolding / masonry work / earth work / foundation work/ RCC
work /water/ power /compressed air / Valve from Water source to Tank /Cables / wiring and laying
/ Storage space for tools /Ladder & safety equipment / Loading / unloading / moving for erection
of equipment by crane/ Hydraulic crane/ long boom hydra/ pallet ruck to be arranged by purchaser
4. SITE LABOUR: Helper Assistance to Team. Customer to provide reasonable facilities for all our men
employed on site.
WORK PERMIT: All necessary Work Permits shall be obtained by the Purchaser. The Purchaser shall
also make any arrangements which may be required with local authorities to permit the
5. SECURITY: The Purchaser shall be responsible for providing adequate guarding and protection of
6. Our welding team shall be consisting of Employee, Vender, Hired Expert or Consultant.
7. DOCUMENTATION CHARGES
Legalization of document and other documentation will attract extra charges at actual.
8. VALIDITY OF OFFER
Validity of offer till 7 days from the date of quotation.
9. LEGAL CONSTRUCTION
All dispute and legal matters are subjected to Ahmadabad (India) jurisdiction only.
10. WARRANTY
TWO (2) year for faulty workmanship and defective material. (On brought item we will
provide actual manufacturer warranty)
Please ask if required any technical and commercial clarification or you any query.
Looking forward to receiving your prompt reply.