1. Check the materials as per attached packing list list..
2. Segregate components as per code & size and highlight each item in drawing. drawing. 3. In case of any discrepancy observed while verifying quantity with packing list & Drawing, immediately inform to MAINI Aluminium Formwork System (MAFS) (MAFS).. Plant Head, Head, Design and Marketing Departments. Departments. 4. Use updated & approved drawing supplied by MAINI Aluminium Formwork System (MAFS)(MAFS),, for the setting out out.. 5. Ensure the area is clean and free from obstruction for setting out.. out 6. Ensure the layout & Floor level is correct as per Drawing. Drawing. 7. The concrete face and side rails must be clean and coated with an approved releasing agent prior to erection ( Fosroc – Reball Oil based ) for each repetition. repetition. 8. Wall ties should be coated with releasing agent provided before being fixed to formwork. formwork. 9. All components should be used as per drawing & unit wise. wise. 10. Ensure the supporting MS fixers used properly in formwork like Waller, Door spacer, Vertical soldiers, Sunk angle etc etc.. 11.Ensure all necessary fixers like T- T-rod, Kicker Bolt, Kicker pvc cone, anchor nut are used properly. 12.Ensure wall and column formwork are erected to the setting out lines. 13.Ensure the bottom of columns and wall formwork is properly braced to ensure correct alignment. 14.Check all the opening for correct dimensions. It should not be twisted. 15.Check all horizontal formwork ( Deck, Beam, Soffits, and Kicker etc.) are leveled. 16.Check all vertical formwork (wall & column) are in plumb. 17.Ensure verticality of deck and beam props. 18.Check wall ties, pins and wedges are all in position and secured. 19.Ensure stop- stop-ends are secured in position. 20.Ensure MAINI working platforms are securely fastened to the concrete structure. 21.A crew chief shall lead and oversee the work to ensure safety, proper handling of materials and in systematic manner while stripping the formwork. 22.Before striking the formwork ensure the area is free from nails, rubbish, scraps & unwanted material like steel scrap & debris. 23.Striking of wall panels should start 12 hours after the casting and deck panels should be removed after 48 hours or upon the approval of the concrete cube test without disturbing the props. 24. Thicker wall should be stripped first to allow early extraction of wall ties while another group is stripping the external formwork. 25. Dismantled panels should be stacked according to the numbering of wall and deck and should be cleaned and coated by releasing agent before transferring onto the next level of work. 26. Steel and aluminium drop frames, transfer hole boxes, slab opening boxes and other accessories should be cleaned, oiled and put in one particular place ready for the next level of work. 27. Prop lengths should be removed only on the approval of the site engineer. MAINI Aluminium formwork provides 2 sets of prop lengths to be used for 2 floor level. 28. It is advised to place different color buckets on the floor where de- de-shuttering is carried out. Scattered Accessories like Pins/Wedges, Pins/Wedges, wall Ties etc. found by any site personnel shall be picked and placed into these buckets. This may be helpful in maintaining the loss of accessories. 29. Only approved shell plan should be referred for dimensions of structures. (B) DONT’S DONT’S::-
1. If found any component incorrect in any terms
(Design or Fabrication.) Do not use the same for erection. 2. Do not cut or modify any components to replace wrong components at site without permission from MAINI Aluminium Formwork System (MAFS). 3. Do not use any drawing other than the approved sheLl plan to erect the materials. 4. Do not work at site without safety shoes, safety belts & helmets. 5. In case of adjustable props, inner and outer member should not be separated. 6. Materials should not be used for the area for which it is not designed for like typical floor materials should not be used in basement, stilts & other floors apart from typical floors. 7. No component should be erected without proper cleaning & without proper coating of approved releasing agent. 8. Location of components should not be changed even if it is of same size.