Pre-Startup Activity for [insert details]
Action
Please Tick (√) Priority Recommendations Status/ Remarks
No Descriptions Party
N/A Y N (H/M/L)
Work planning
1. All work permits are signed off
accordingly.
2. All construction works is completed and
appropriate reports signed off by platform
authority.
3. No. of pax on platform is planned, closely
monitored and comply with PCSB
requirement.
4. Coordination meeting is conducted with SAMPLE
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
approved by management.
11. Applicable MOC requirement is met.
- Dismantle of scaffolding
- Removal of utilities
- Insulation installed
- removal of spade
- removal of temporary equipment
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
been posted.
Hydrocarbon liquid
1. Area is free of hydrocarbon.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
removed.
Hydrocarbon gas
1. Gas detectors and fire detectors are
available as per P&ID.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
Diesel
1. Integrity check on diesel tank is done.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
operation.
personnel.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
Mechanical isolation
1. Ensure that spades are in right location
(refer to startup procedure).
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
(refer to P&ID).
Instrument settings
1. Pressure safety valve (PSV) or Relieve
valve (RV) are in the right settings (refer
to P&ID).
PAH/PAHH
PAL/PALL
LAH/LAHH SAMPLE
LAL/LALL
TAH/TAHH
TAL/TALL
PG/PT
TG/TT
LG/LT
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
Electrical isolation
1. Electrical equipment / tools are checked SAMPLE
Confined space
1. Gas testing is conducted regularly.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
Emergency response
1. ERP document is available at site.
Storage area
1. Scheduled waste is stored properly in a
dedicated area.
No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
SAMPLE