Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev.

3
Pre-Startup Activity for [insert details]

Action
Please Tick (√) Priority Recommendations Status/ Remarks
No Descriptions Party
N/A Y N (H/M/L)

Work planning
1. All work permits are signed off
accordingly.
2. All construction works is completed and
appropriate reports signed off by platform
authority.
3. No. of pax on platform is planned, closely
monitored and comply with PCSB
requirement.
4. Coordination meeting is conducted with SAMPLE

involvement from all parties; start-up plan


is developed.
5. Weather condition is taken into account
prior to startup.
6. Used materials/ parts are properly
segregated and disposed off.
7. Equipment / tools are returned to store/
warehouse, or brought back by
contractors.
8. Tools and consumables list is checked.
9. All portable equipment are checked and
removed from site.
10. Startup procedure, work pack or site-
specific procedure is prepared and

PETRONAS CARIGALI SDN BHD Page 1


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

approved by management.
11. Applicable MOC requirement is met.

12. PHA/HAZOP has been performed and


recommendations have been resolved or
implemented before startup.

13. Operating manual (OPM), Hazard and


Effect Register (HER) and other relevant
documents are available at site for quick
reference

14. All trainings required for operating the


process are completed (both PCSB staff
and contractors).
SAMPLE

15. All outstanding items have been cleared


prior to startup; otherwise management
approval must be granted in order to
proceed with open items.

16. Site clean-up have been completed as


per startup plan, include:

- Dismantle of scaffolding
- Removal of utilities
- Insulation installed
- removal of spade
- removal of temporary equipment

removal of relevant barriers/ safety


signage etc.

PETRONAS CARIGALI SDN BHD Page 2


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

17. Locks (LOTO) are checked and removed


accordingly.

18. Barricades are removed after work


completion.

19. Safety officer is on site.

20. Identified area fenced for authorized


personnel are removed.

21. Communications means (radio, GPA etc.)


is available and functioning.

22. Safety rules or signs, as needed, have SAMPLE

been posted.

23. PPE required for new equipment or


chemicals are available prior to startup.

24. Tool box meeting is conducted on daily


basis to ensure work carried out in a
safely manner.

Hydrocarbon liquid
1. Area is free of hydrocarbon.

2. Gas detectors and fire detectors are


available as per P&ID.

3. Draining/ bleeding route is checked.

4. Adjacent pipework is leak free.

PETRONAS CARIGALI SDN BHD Page 3


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

5. Equipment is installed as per design


specification.

6. Hydro-testing, tightness, and pressure


tests have been completed with
satisfactory results.

7. Leak check is performed.

8. Process line is purged with inert or N2


gas.

9. Warning signage on pressure testing is SAMPLE

removed.

10. Fire extinguishers and fire hose are


available.

11. Fire blanket is available.

Hydrocarbon gas
1. Gas detectors and fire detectors are
available as per P&ID.

2. Equipment is installed as per design


specification.

3. Hydro-testing, tightness, and pressure


tests have been completed with
satisfactory results.

PETRONAS CARIGALI SDN BHD Page 4


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

4. Gas testing is completed.

5. Process line is purged with inert or N2


gas.

6. Warning signage on pressure testing is


removed.

7. Fire extinguishers and fire hose are


available.

Bottled gas under pressure


1. Gas bottles are stored at safe area and
properly secured with wire rope.
SAMPLE

2. Gas bottles are equipped with flashback


arresters and check valve.

3. Gas bottles are certified and color-coded.

Diesel
1. Integrity check on diesel tank is done.

2. Diesel tank is earthed.

3. Diesel is sufficient for startup and


operation activities.

Overhead/ lifting equipment


1. All lifting gears are checked and certified.

2. Actual weight of the load is confirmed.

PETRONAS CARIGALI SDN BHD Page 5


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

3. Lifting plan is prepared and discussed


with operations & contractors.

4. Load chart of the crane is correct.

5. Crane standing area is firmed and flat.

6. Integrity check is done (using crane


inspection checklist).

7. No unnecessary activities in lifting area.

8. Fire extinguishers, fire hose, and


firewatcher are ready.
SAMPLE

9. All alarm and emergency system of the


crane is checked and functioning.

10. Number of personnel in the lifting area is


minimized; access is restricted.

11. Clear escape routes are available.

12. Lifting coordinator is identified.

13. Crane operator is trained and qualified.

14. Crane signaler is trained and qualified.

Equipment with rotating parts


1. Ensure sufficient clearance for machine

PETRONAS CARIGALI SDN BHD Page 6


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
operation.

2. Moving parts are properly covered with


guards.

3. Appropriate tools are ready for machine


operation.

4. Ensure air, water and steam hoses are


properly secured.

5. Critical rotating equipment has been “run-


in” to test for operability.

6. Access is restricted to authorized SAMPLE

personnel.

Pressure vessels/ tanks/ separators


1. Ensure the manhole is properly boxed-up,
secured and all bolts are tighten up as
required.

2. Ensure sump pile, sump tank, sump


caisson and drip pan are empty.

3. Ensure purging operation is completed.

4. Draining/ bleeding route is checked.

5. Ensure all valves are open/ close as per


operation startup manual. No sign of leak
from the valve body or stem.

PETRONAS CARIGALI SDN BHD Page 7


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

6. ABV is in good condition and operated as


per logic. No instrument air or gas
release from the vent port.

7. Upstream or downstream of the unit is


checked and confirmed no leakage.

8. Wind direction is checked. Gas plume is


checked and considered safe.

9. Fire extinguishers and fire hose are


available.

10. Tanks and vessels are properly earthed.


SAMPLE

Mechanical isolation
1. Ensure that spades are in right location
(refer to startup procedure).

2. Spectacle blinds are turned to correct


position (refer to startup procedure).

3. Valve opening/ closing sequence for


startup are part of startup procedure and
communicated to relevant personnel.

4. Ensure all valves are lined up for startup.

5. Ensure that positive isolations i.e. spades


or blinds installed during the shutdown
are removed.

6. Pipe specifications are as per designed

PETRONAS CARIGALI SDN BHD Page 8


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)
(refer to P&ID).

Instrument settings
1. Pressure safety valve (PSV) or Relieve
valve (RV) are in the right settings (refer
to P&ID).

2. Ensure all instruments settings are as per


designed (refer to P&ID) :

PAH/PAHH

PAL/PALL

LAH/LAHH SAMPLE

LAL/LALL

TAH/TAHH

TAL/TALL

3. Ensure all gauges & transmitters are


available as per P&ID and functioning :

PG/PT

TG/TT

LG/LT

FT, flow meter

PETRONAS CARIGALI SDN BHD Page 9


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

4. Instruments, including analysers have


been calibrated, as required.

5. Safety systems, including fire fighting


equipment, are in place and have been
checked.

6. Control systems, including shutdowns,


have been checked.

7. Fire detection and protection equipment


are functioning.

Electrical isolation
1. Electrical equipment / tools are checked SAMPLE

and kept in safe place.

2. Locks (LOTO) and isolation tags have


been removed.

3. De-isolation and energizing is performed


by trained and qualified personnel.

Confined space
1. Gas testing is conducted regularly.

2. Vessel inspection and cleaning are


completed.

3. Sludge is segregated, and properly


disposed off.

PETRONAS CARIGALI SDN BHD Page 10


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

4. Access and egress are prepared.

5. Fire extinguishers, fire hose, firewatcher


are ready.

Firewatcher is trained and qualified.

6. Temporary de-contamination room is


safely removed, if any.

Emergency response
1. ERP document is available at site.

2. Staff is familiar with roles and


responsibility of ERT and EMT. SAMPLE

3. Staff is familiar with escape routes.

4. Members of DCT are trained and familiar


with fire fighting equipment.

5. Staff is familiar with alarm system and


aware of the mustering point.

6. Staff is aware of the location of life saving


equipment.

Storage area
1. Scheduled waste is stored properly in a
dedicated area.

2. TENORM waste is stored properly in a


dedicated area.

PETRONAS CARIGALI SDN BHD Page 11


Pre-Activity Safety Review Verification Checklist WW ALL X X S 05 028 I Rev. 3
Pre-Startup Activity for [insert details]

No Action
Please Tick (√) Priority Recommendations Status/ Remarks
Descriptions Party
N/A Y N (H/M/L)

3. Chemicals are kept in drums and stored


in a dedicated area.

4. Copy of MSDS is available at storage


area.

5. Ensure proper labelling is displayed.

SAMPLE