A hospital is a health care institution providing patient treatment by specialised staff and equipment.
PROJECT PROFILE:
Address: Guru Nanak Dev Charitable Hospital, Tarn-Taran, Punjab.
Client: Baba Jiwan Singh Baba Dalip Singh
Plot Area: 1,59,400 Sq. ft Started in: 2008
Architect: Ar.D.P Singh (Ludhiana).
ABOUT:
It is built in 1,59,400 area. This is the 250 bedded fully computerised
charitable hospital. Services provided in the hospital by the services
IT INCLUDES: SERVICE CONSULTANTS
block built near the hospital.
Emergency department Electrical: Samit
Climate of Tarn-Taran: IPD(Inpatient Department)Enterprises.
Tropical steppe ,semi-arid and hot climate. OPD(Outpatient DepartmentHVAC: Ambience,chd.
Average annual rainfall is 545mm. Fire Fighting: Cascade.
Temperature- 4.5˚C- 10˚C(winters) and 29˚C- 40.5˚C Structure: Er. Sukhdev
(summers). Singh Saggu.
LOCATION:
It is bounded by Amritsar district north,Kaputhala
Access road
district
in east, Pakistan in the west and Ferozepur district in
the south.
SITE LOCATION:
It is 18 km away from the Amritsar city.
The site is very much near to Goindwal sahib road,
Dera Baba Jagtar Singh ji
Tarn taran ,Punjab
and is adjacent to Dera Baba Jagtar Singh ji. ACCESSIBILITY
By Road:
The is site is easily approachable and From ISBT, Amritsar to Tarn-Taran-25 min
can be seen from the highway. Total Distance – 35 km
SITE ANALYSIS: Site Plan
The plot measuring 156447.432 sq ft or 3.6 acres area
is a leved
ground and Is just adjacent to dera Baba Jagtar Singh
Out of this total plot, the area of 37,525 sq ft. is
ji.
earmarmarked for construction of multi-storeyed
hospital block, which includes all the departments i.e.
emergency, OPD,IPD,etc. SERVICE ROAD WASTEAGE
EMERGENCY ENTRANCE
Public access
Ambulance
Services
EMERGENCY
WING
RECEPTION DESK
Fire escape
EMERGENCY ENTRANCE
FIRST FLOOR PLAN
•Strong Connectivity of O.T – gynaecology dept.– BLOOD BANK
ward and rooms
•Dirty utility is first washed and semi sterilization is
done near O.T then it is transferred to C.S.S.D
through Service lifts. MOTHER RECOVERY
CENTRE
•Blood bank is provided on the first floor. NATAL WARDS
•Access to gynae dptt. Is through lift.
BIO-CHEM. DEPT.
BIRTHING CENTRE
ADMIN. BLOCK
BIRTHING CENTRE
INFERENCES:
SCRUB AREA
ENTRY
• No direct access to the scrub
area from the changing room.
CHANGING ROOM SUB STERILE AREA • O.t.2 z not provided with
double cavity walls.
• C.U. & D.U. are provided for
recovery room and eclampsia.
NURSE STATION O.T. • No shoot shafts & dirty
corridors attached to o.t. area
for waste disposal.
• Corridor width 8ft
RECOVERY ROOM
Gynae and Maternal ward
KEY PLAN
Delivery room
O.T.
• WARDS AND POST NATAL ROOMS ARE
PROVIDED….NEAR THE N.I.C.U.
INCUBATOR
SECOND FLOOR
MEDICAL I.C.U.
C.S.S.D.
Placed very next to the O.T. so as the easy
transfer of the sterile equipment.
O.T.
VERTICAL CIRCULATION
1 MAIN STAIR CASE IS PROVIDED.
VERTIACL CIRCULATION IS THROGH RAMP AND IT ALSO
BECAME THE ELEVATION FEATURE.
RAMP,FIRE EXITS ARE UPTO FOURTH FLOOR.
FOR THE TOP FLOOR,MAIN STAIRS AND 4 LIFTS ARE
PROVIDED.
2 VISITORS LIFTS,2 PATIENTS LIFTS AND 1 SERVICE LIFT
ARE PROVIDED.
PRIVATE ROOMS
laundry
BASEMENTS
CT SCANAND MRI IS PROVIDED IN THE UPPER BASEMENT
PARKING IS PROVIDED LEAVING 30’ SPACE FROM THE SCAN
AREA BECAUSE HARMFUL RADIATIONS ARE EMITTED IN THAT
ZONE.
•SLOPE-1’-0”:10’-0”
•RAMP 22’ WIDE.
LOWER BASEMENT PLAN
CIRCULATION
RAMP
LIFTS (NORMAL/STRETCHER)
FIRE EXITS (STAIRS)
FIRE STAICASE 5’0” WIDE
STAIRCASE IS PROVIDED WITH
BOTH SIDE RAILING
KEY PLAN
VERTICAL CIRCULATION
1 MAIN STAIR CASE IS PROVIDED.
VERTIACL CIRCULATION IS THROGH RAMP AND IT ALSO BECAME THE ELEVATION FEATURE.
RAMP,FIRE EXITS ARE UPTO FOURTH FLOOR.
FOR THE TOP FLOOR,MAIN STAIRS AND 4 LIFTS ARE PROVIDED.
2 VISITORS LIFTS,2 PATIENTS LIFTS AND 1 SERVICE LIFT ARE PROVIDED.
SERVICE BLOCK
(Basement) (Ground Floor)
Hvac unit is placed in the basement Dg sets and electrical units ar
of service floor to control tha services on mid ground and ground flo
of the hospital. e the full back up for the hosp
Fire sprinklers at regular grid 10’ c/c Pumps from ugwt (7in num) are provided to pump up
the water req .
2. Sewage treatment & disposal
The system is designed as double stack single pipe system. Soil & waste is
carried in two separate pipes with vents, Soil pipe is provided with separate antis’
phone pipe to safeguard the water seal.
Soil pipes carrying wastes from water closets / urinal is directly connected to
inspection chambers / manholes where as waste pipes carrying waste from wash
basins, nahani traps in kitchens & toilets etc. is connected to inspection chambers
through Gully traps.
The external drainage system is comprise of network of stoneware glazed / RCC
(NP-2) pipes & inspection chambers / manholes. The sewerage system is
ultimately connected to STP through sewer trap.
All the biological/medical and other waste water is treated in STP(Sewage
treatment plant)
Both soil and waste pipes are carried throughDucts are taken
plumbing outside as if some problems occur in
shafts.
pipeline, one can make it clear from outside
VERTICAL CIRCULATION
SOME MORE INFERENCES
•PUBLIC LIFTS ARE NOT ADEQUATE
•MORTUARY IS NOT PROVIDED IN THE HOSPITAL.
•OT AND BLOOD BANK IS NOT ON THE SAME FLOOR
•CIRCULATION ON THE GROUND FLOOR IS EXCESS.
•SEWER IS FLOWING AN THE BACK SIDE OF THE HOSPITAL,SIGNIFY UNHYGENIC CONDITIONS
SURROUNDINGS THE HOSPITAL.
NO RAILING IS PROVIDED ON MAIN RAMP.
NO PUBLIC TOILETS IN MAIN RECEPTION AREA.