WEEKLY PERFORMANCE REPORT

FSO. FEDERAL 2

PERIODE : JANUARY 7th - 1

DECK DEPARTMENT
1 CONTINOUSLY CARRIED OUT DE-RUSTING AND DECK PAINTING

2 GENERAL HOUSE KEEPING


3 GAS FREEING COT 3C PREPARATION FOR REPAIRED HEATING COILS
4 MAINTENANCE OF DRAIN PIPE PUBLIC TOILET UPPER DECK ACCOMMODATION

5 FABRICATED GRATINGS FOR STBD SIDE BOARDING PLATFORM

6 INSTALLED CLAMPS FOR GRATINGS AT BOARDING PLATFORM


7 CARGO OFF LOADING/DISCHARGE TO MT. SANANA

ENGINE DEPARTMENT
1 CONTINOUSLY CARRIED OUT DE-RUSTING, PAINTING AND GENERAL CLEANING IN ENGIN

2 GENERAL HOUSE KEEPING


3 RENEW MAIN AIR COMPRESSOR COOLING SEA WATER OVER BOARD LINE
4 OVER HAUL AND REPLACED BEARING IN STP BLOWER

5 BRUSHED AND PAINTED NEW ARRIVAL ANGLE BAR

6 CHANGED MAIN AIR COMPRESSOR COOLER SEA WATER OVER BOARD LINE
7 CLEANED SEA WATER PUMP FILTER
8 CARRIED OUT WEEKLY SAFETY ROUTINE
9 SEGREGATED GARBAGE AND SHIFTED TO COLLECTED AREA

10 OVER HAUL ST. BY AUX. ENGINES FUEL INJECTOR

GENERAL ISSUE
TELKOMSEL SIGNAL SYSTEM NOT WORKING UNTIL NOW, COMMUNICATION ONLY USING
1
PHONE SYSTEM
SUBMITT ONLINE SOP TO PHE FOR INVESTIGATED AND MAINTENANCE STEAM LINE 2C &
2
FOR APPROVAL
RT

JANUARY 7th - 13th 2019

ODATION

LEANING IN ENGINE ROOM

INE

LINE

ATION ONLY USING PHE COMPUTER &


E STEAM LINE 2C & 3C AND WAITING