You are on page 1of 4

Well Shipmanagement and Maritime Consultant Co.

, Ltd
惠航船舶管理股份有限公司

機艙部門主要裝備現況檢查月報及保養維護工作記錄
MONTHLY MACHINERY INSPECTION & MAINTENANCE REPORT-Engine Department

SHIP NAME SAKIZAYA LEADE MOUTH/YEAR:02/2018

備註: 輪機長應督導每月經常實施機艙部門現況檢查。應將機艙主要裝備設施之檢查情
況,以及保養、維護工作(含外部檢查、修理活動)詳實記錄。
Remarks: Chief Engineer shall ensure that machinery condition inspection is duly carried out and
the working condition and status of equipment is to be reported on monthly basis, which includes
any occurrence of major breakdown or equipment defect. All engine maintenance, inspection,
testing and repair work (including task done by outside repairman, survey or inspection by external
auditor/surveyor) shall be detailed recorded on daily basis.

DATE: 機艙部門主要裝備檢查現況月報 MACHINERY CONDITION INSPECTION REPORT


1 LIFE BOAT BATTERY CHANGE FOR NO.1 AND NO.2.
1-Feb 2 RESURE BOAT BATTERY CHANGED .

1 E/R CLEANED.
2 INCINERATOR WASTE OIL LINE SUCTION FILTER
2-Feb CLEANED. 3 INCINERATOR ASH TAKED OUT.

1 F.O SHIFTER PUMP SUCTION FILTER CLEANED.


3-Feb 2 AUX BOILER BURNER
CLEANED. FLAME DETECTOR TESTED.

4-Feb 1 E/R CLEANED


1 M/E SCAV BOX DRAIN PIPE FLUSHED BY STEAM.
5-Feb 2 NO.2 F.O PURIFIER
SUCTION STRAINER CLEANED
1 F. W. G INSIDE CLEANED.
6-Feb 2 E/R CLEANED

1 NO.2 F.O PURIFIER CLEANED.


7-Feb 2 F.O SUPPLY PUMP SUCTION STRAINER CLEANED.

1 M/E T/C AIR FILTER RENEWED.


8-Feb 2 NO.1 LO TRANSFER PUMP SUCTION FILTER
CLEANED.
9-Feb 1 M/E L O PURIFIER CLEANED,
1 E/R CLEANED
10-Feb 2 SLUDGE PUMP SUCTION FILTER CLEANED.

1 PURIFIER ROOM FLOOR CLEANED.


11-Feb 2 INCINERATOR WASTE OIL PIPE
SUCTION FILTER CLEANED.
1 E/R CLEANED.
12-Feb 2 HFO TRANSFER PUMP SUCTION STRAINER CLEANED

Version: 2.1/2008.02.01 1/4 WSR-M-02


Well Shipmanagement and Maritime Consultant Co., Ltd
惠航船舶管理股份有限公司
機艙部門主要裝備現況檢查月報及保養維護工作記錄
MONTHLY MACHINERY INSPECTION & MAINTENANCE REPORT-Engine Department

SHIP NAME SAKIZAYA LEADE MOUTH/YEAR:02/2018


1 D.O TRANSFER PUMP SUCTION STRAINER CLEANED.
13-Feb
1 E/R CLEANED
14-Feb 2 ENGINE ROOM STORE ARRANGEMENT

1 NO.2 F.O PURIFIER SUCTION STRAINER CLEANED.


15-Feb 2 BUNKERING F.O 297MT.

16-Feb 1 E/R CLEANED


1 M/E T/C DRY-WASHING
17-Feb

1 NO.2 F.O PURIFIER SUCTION STRAINER CLEANED.


18-Feb
1 LOW . HIGH SEA CHEST STRAINER CLEANED. ZINC
RENEWED. 2 M/E T/C DRY-WASHING.
19-Feb 3 ENGINE ROOM ALL BEARING FILLING
GREASED.

20-Feb 1 BUNKERING F.O.


1 NO.2 F.O PURIFIER SUCTION STRAINER CLEANED.
2 BUNKER STATION PAINTED.
21-Feb 3 PURIFIER ROOM PAINTED .
4 M/E T/C DRY-WASHING

1 OIL WATER SEPARATOR INSIDE FILTER CLEANED.


2 M/E BOOSTER PUMP SUCTION STRAINER CLEANED.
3 BOILER FEED WATER PUMP PRESSURE SWITCH
22-Feb RENEWED. 4 CONTROL AIR REDUCTION PRESSURE VALVE
GENERAL MAINTENACED.

1 NO .1 JACKET COOL F.W PUMP GLAND PACKING RENEWED.


2 NO .1 CENTRAL COOL F.W PUMP GLAND PACKING RENEWED.
3 M/E T/C DRY-WASHING.
23-Feb 4 NO.2 F.O PURIFIER SUCTION STRAINER CLEANED.

1 E/R CLEANED
24-Feb
1 NO.2 F.O PURIFIER SUCTION STRAINER CLEANED.
25-Feb

Version: 2.1/2008.02.01 2/4 WSR-M-02


Well Shipmanagement and Maritime Consultant Co., Ltd
惠航船舶管理股份有限公司
機艙部門主要裝備現況檢查月報及保養維護工作記錄
MONTHLY MACHINERY INSPECTION & MAINTENANCE REPORT-Engine Department

SHIP NAME SAKIZAYA LEADE MOUTH/YEAR:02/2018


1 LIFE BOAT BATTERY CHANGE.
2 M/E SCAV BOX DRAIN PIPE FLUSHED BY STEAM.
26-Feb 3 M/E T/C DRY-WASHING.

1 DRINK WATER PIPE OUTLET FILTER CLEANED.


2 AIR CONDITION SUCTION AIR FILTER CLEANED.
27-Feb

1 E/R CLEANED
28-Feb

1st Engineer: sun zhen liang Chief Engineer: zhu rong qing

Version: 2.1/2008.02.01 3/4 WSR-M-02


Well Shipmanagement and Maritime Consultant Co., Ltd
惠航船舶管理股份有限公司

Version: 2.1/2008.02.01 4/4 WSR-M-02

You might also like